Velic Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Sep 2026
- Last 24 months
- 10 permits filed
45 permits since 2000: 37 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 2 in progress. Typically 17 days from filing to permit and 383 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Sep 2026 | 850 Elizabeth St | revision to 202211146473-s1 (ref 202603026779). revise rear patio and concrete steps and retaining wall. revise stair from rear deck adjusting for corrected grade. widen garage door by 11". revise 3/f rear terrace railing.Details
revision to 202211146473-s1 (ref 202603026779). revise rear patio and concrete steps and retaining wall. revise stair from rear deck adjusting for corrected grade. widen garage door by 11". revise 3/f rear terrace railing. | $15,000 |
| Feb 3, 2026 | In progress issued Feb 2026 | 200 Santa Clara Av | repair of existing three terraces with stairs and install new tiles at terraces and stairs less than 50%Details
repair of existing three terraces with stairs and install new tiles at terraces and stairs less than 50% | $100,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Mar 1, 2023 | Completed final sign-off Mar 2025 | 74 Francis St | converting existing storage space on the garage/basement level into living space area.staircase will be added to the rear of the house to connect the basement/garage floor to the 1st floor.Details
converting existing storage space on the garage/basement level into living space area.staircase will be added to the rear of the house to connect the basement/garage floor to the 1st floor. | $125,000 |
| Feb 12, 2020 | Completed final sign-off Oct 2020 | 15 San Lorenzo Wy | create new opening from dining room to kitchen, removel e kitchen, remodel and expand e level 1 bath, remodel e master bath, remodel e lvl 3 bath, add ext stairs, off level 1 study. door, expand e door op9ening at rear fam rm, replace e slider w french doors and side lites, replace 1st lvl windowsDetails
create new opening from dining room to kitchen, removel e kitchen, remodel and expand e level 1 bath, remodel e master bath, remodel e lvl 3 bath, add ext stairs, off level 1 study. door, expand e door op9ening at rear fam rm, replace e slider w french doors and side lites, replace 1st lvl windows | $125,000 |
| Sep 5, 2019 | Completed final sign-off Mar 2023 | 1006 Capitol Av | rebuild rear 1st & 2nd floors, extend by 5'10, (n) 2nd fl deck. remodel interior, add 3rd fl dormer & bathroom, (n) interior stairs, (n) heating & electrical, rewire & replumbingDetails
rebuild rear 1st & 2nd floors, extend by 5'10, (n) 2nd fl deck. remodel interior, add 3rd fl dormer & bathroom, (n) interior stairs, (n) heating & electrical, rewire & replumbing | $188,000 |