Back to kitchen remodel contractors
Velic Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Sep 2026
- Last 24 months
- 10 permits filed
45 permits since 2000: 37 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 15 completed. Typically 12 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2024 | Completed final sign-off Sep 2025 | 23 Midway St | unit c-interior remodel of existing condominium; remodel kitchen; remodel existing bathroom and closet to create separate powder room; modify closet for installation of washer/dryer; new lighting throughout; new tankless water heater; replace windows and skylights in existing openings.Details
unit c-interior remodel of existing condominium; remodel kitchen; remodel existing bathroom and closet to create separate powder room; modify closet for installation of washer/dryer; new lighting throughout; new tankless water heater; replace windows and skylights in existing openings. | $147,200 |
| Jul 2, 2024 | Completed final sign-off Oct 2024 | 458 Colon Av | renovation of the kitchen, same layout, no any changes. no removal of wallsDetails
renovation of the kitchen, same layout, no any changes. no removal of walls | $70,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Sep 28, 2023 | Completed final sign-off Feb 2024 | 556 Ashbury St | interior kitchen remodel, including new fixtures, appliances, cabinetry and finishes. demo (e) pantry closet. new pocket doors to dining room.Details
interior kitchen remodel, including new fixtures, appliances, cabinetry and finishes. demo (e) pantry closet. new pocket doors to dining room. | $70,000 |
| May 9, 2023 | Completed final sign-off Oct 2023 | 55 San Leandro Wy | renovation kitchen: replace cabinets, countertops. upgrade plumbing and electric. same layout, no change to interior walls, doors, or windows.Details
renovation kitchen: replace cabinets, countertops. upgrade plumbing and electric. same layout, no change to interior walls, doors, or windows. | $65,000 |
| Aug 31, 2021 | Completed final sign-off Jan 2024 | 3526 22nd St | replace side wdw on 2/f.replace (e) garage door, upgrade elec panel,replace (e) tradesman door,add gas furnace & tankless w/h for 3528.replace 2 (e) front doors,replace all (e) wdws on front facade on levels 2/3 & e/s with wood wdw.not street visible wdws to be vinyl.lvl 3: (n) kitchen, 2(n) baths.Details
replace side wdw on 2/f.replace (e) garage door, upgrade elec panel,replace (e) tradesman door,add gas furnace & tankless w/h for 3528.replace 2 (e) front doors,replace all (e) wdws on front facade on levels 2/3 & e/s with wood wdw.not street visible wdws to be vinyl.lvl 3: (n) kitchen, 2(n) baths. | $50,000 |
| May 12, 2021 | Completed final sign-off Nov 2023 | 509 Oak St | reconfigure (e) bath, enlarge (e) opening b/w living and kitchen, remove wall b/w kitchen and sunroom, refinish (e) floors, new paint, add new lighting , replace (e) side and rear metal windows with alum/clad in historic style, add new alum/clad wood window at rear patio, kitchen remodel in place.Details
reconfigure (e) bath, enlarge (e) opening b/w living and kitchen, remove wall b/w kitchen and sunroom, refinish (e) floors, new paint, add new lighting , replace (e) side and rear metal windows with alum/clad in historic style, add new alum/clad wood window at rear patio, kitchen remodel in place. | $80,000 |
| Apr 9, 2021 | Completed final sign-off Apr 2024 | 4235 25th St | demo rear laundry (84sf), add addition of rear dining/living space. addition is within 45% setback. infill 9sf lightwell. no change to front facade. interior remodel work. rear home, an interior remodel will configure kitchen and living spaces, vault the ceiling and add two skylights. a new -Details
demo rear laundry (84sf), add addition of rear dining/living space. addition is within 45% setback. infill 9sf lightwell. no change to front facade. interior remodel work. rear home, an interior remodel will configure kitchen and living spaces, vault the ceiling and add two skylights. a new - | $212,000 |
| Jan 4, 2021 | Completed final sign-off Oct 2021 | 107 San Juan Av | in-kind kitchen remodel with new operable skylight and kitchen door relocation.Details
in-kind kitchen remodel with new operable skylight and kitchen door relocation. | $20,000 |
| Aug 6, 2020 | Completed final sign-off Nov 2020 | 1415 Indiana St | unit #306: renovation of the kitchen (~110 sqft) . replace cabinets and appliances. upgrade electric and plumbing. all work in kind.Details
unit #306: renovation of the kitchen (~110 sqft) . replace cabinets and appliances. upgrade electric and plumbing. all work in kind. | $50,000 |
| Aug 6, 2020 | Completed final sign-off Dec 2020 | 80 Encanto Av | renovation of the kitchen (~120sqft). replace cabinets and appliances in kind.Details
renovation of the kitchen (~120sqft). replace cabinets and appliances in kind. | $50,000 |
| Aug 6, 2020 | Completed final sign-off Dec 2020 | 301 San Marcos Av | remodel of the kitchen (~90sqft) . replace the kitchen cabinets and appliances. upgrade electric and plumbing. no replacement of any doors or windows. all work in kind.Details
remodel of the kitchen (~90sqft) . replace the kitchen cabinets and appliances. upgrade electric and plumbing. no replacement of any doors or windows. all work in kind. | $60,000 |
| Feb 12, 2020 | Completed final sign-off Oct 2020 | 15 San Lorenzo Wy | create new opening from dining room to kitchen, removel e kitchen, remodel and expand e level 1 bath, remodel e master bath, remodel e lvl 3 bath, add ext stairs, off level 1 study. door, expand e door op9ening at rear fam rm, replace e slider w french doors and side lites, replace 1st lvl windowsDetails
create new opening from dining room to kitchen, removel e kitchen, remodel and expand e level 1 bath, remodel e master bath, remodel e lvl 3 bath, add ext stairs, off level 1 study. door, expand e door op9ening at rear fam rm, replace e slider w french doors and side lites, replace 1st lvl windows | $125,000 |
| Mar 21, 2019 | Completed final sign-off Dec 2019 | 602 30th Av | kitchen remodel on 2nd fl and 3rd fl per plan; hall bathroom remodel on 2nd and 3rd floorsDetails
kitchen remodel on 2nd fl and 3rd fl per plan; hall bathroom remodel on 2nd and 3rd floors | $30,000 |
| Jul 11, 2018 | Completed final sign-off Dec 2018 | 1278 03rd Av | kitchen remodel: replace cabinets, counter, and flooringDetails
kitchen remodel: replace cabinets, counter, and flooring | $30,000 |