Back to bathroom remodel contractors
Velic Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Sep 2026
- Last 24 months
- 10 permits filed
45 permits since 2000: 37 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 19 completed, 4 in progress. Typically 5 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 55 San Leandro Wy | renovation of one bathroom. same layout, no changes. no replacement door or window.Details
renovation of one bathroom. same layout, no changes. no replacement door or window. | $60,000 |
| Dec 2, 2025 | In progress issued Jan 2026 | 200 Santa Clara Av | new bathroom on basement, move laundry from basement to 2nd floor.Details
new bathroom on basement, move laundry from basement to 2nd floor. | $109,503 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 458 Colon Av | remodel bathroom in kind. same layout no change inside bathroom. no change to floor layout. no change to wall layout. no structural work.Details
remodel bathroom in kind. same layout no change inside bathroom. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Jul 2, 2025 | Completed final sign-off Nov 2025 | 4316 26th St | renovation of the bathroom. same layout. no change of the walls, doors, or windows.Details
renovation of the bathroom. same layout. no change of the walls, doors, or windows. | $50,000 |
| Apr 30, 2025 | Completed final sign-off Sep 2025 | 63 Germania St | add a window to the rear facing part of the building. replacing a window to operable in bathroom rear facing buildingDetails
add a window to the rear facing part of the building. replacing a window to operable in bathroom rear facing building | $8,000 |
| Apr 25, 2025 | Completed final sign-off Jul 2025 | 66 Heather Av | renovation of bathroom. same layout. in kind. no change of the door or windows. upgrade exhaust fan.Details
renovation of bathroom. same layout. in kind. no change of the door or windows. upgrade exhaust fan. | $80,000 |
| Oct 11, 2024 | Completed final sign-off Sep 2025 | 23 Midway St | unit c-interior remodel of existing condominium; remodel kitchen; remodel existing bathroom and closet to create separate powder room; modify closet for installation of washer/dryer; new lighting throughout; new tankless water heater; replace windows and skylights in existing openings.Details
unit c-interior remodel of existing condominium; remodel kitchen; remodel existing bathroom and closet to create separate powder room; modify closet for installation of washer/dryer; new lighting throughout; new tankless water heater; replace windows and skylights in existing openings. | $147,200 |
| Aug 12, 2024 | In progress issued Dec 2024 | 1948 Sutter St | addiition of 72sf ea on 1/f & 2/f. excavation of basement under entire (e) structure. approx 1500sf new basement level to includieng storage area, laundry, bathroom,media room, gym,office/bedroom,new garage & new garage door.Details
addiition of 72sf ea on 1/f & 2/f. excavation of basement under entire (e) structure. approx 1500sf new basement level to includieng storage area, laundry, bathroom,media room, gym,office/bedroom,new garage & new garage door. | $500,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Dec 15, 2022 | Completed final sign-off May 2024 | 458 Colon Av | interior residential alteration to add half bathroom on the ground fl. and relocate laundry hook-ups, work includes new door, partitions, finishes, cabintry, exhauset fan, plumbing fixtures, lighting under slab rough plumbingDetails
interior residential alteration to add half bathroom on the ground fl. and relocate laundry hook-ups, work includes new door, partitions, finishes, cabintry, exhauset fan, plumbing fixtures, lighting under slab rough plumbing | $20,000 |
| Nov 15, 2022 | Completed final sign-off Jun 2025 | 4226 26th St | horizontal addition at the rear of the 3rd flr to add a new bedroom and reconfiguration of existing bath.Details
horizontal addition at the rear of the 3rd flr to add a new bedroom and reconfiguration of existing bath. | $100,000 |
| Nov 14, 2022 | In progress issued Dec 2024 | 850 Elizabeth St | remove partition,joint two rooms on 2nd fl,modify roof on 3rd fl for better head room, add a master closet and master bath.modify garage level,lower slab to meet hight requirements in habitable area.Details
remove partition,joint two rooms on 2nd fl,modify roof on 3rd fl for better head room, add a master closet and master bath.modify garage level,lower slab to meet hight requirements in habitable area. | $150,000 |
| Sep 20, 2021 | Completed final sign-off Aug 2022 | 301 San Marcos Av | reno master bathroom on top floor. upgrade plumbing & electrical. install exhaust fan and got exhaust 3 feet from property line or any opening. all work to be done inside bath. non structural h.e. lighting & vacancy sensor.Details
reno master bathroom on top floor. upgrade plumbing & electrical. install exhaust fan and got exhaust 3 feet from property line or any opening. all work to be done inside bath. non structural h.e. lighting & vacancy sensor. | $80,000 |
| Aug 31, 2021 | Completed final sign-off Jan 2024 | 3526 22nd St | replace side wdw on 2/f.replace (e) garage door, upgrade elec panel,replace (e) tradesman door,add gas furnace & tankless w/h for 3528.replace 2 (e) front doors,replace all (e) wdws on front facade on levels 2/3 & e/s with wood wdw.not street visible wdws to be vinyl.lvl 3: (n) kitchen, 2(n) baths.Details
replace side wdw on 2/f.replace (e) garage door, upgrade elec panel,replace (e) tradesman door,add gas furnace & tankless w/h for 3528.replace 2 (e) front doors,replace all (e) wdws on front facade on levels 2/3 & e/s with wood wdw.not street visible wdws to be vinyl.lvl 3: (n) kitchen, 2(n) baths. | $50,000 |
| May 12, 2021 | Completed final sign-off Nov 2023 | 509 Oak St | reconfigure (e) bath, enlarge (e) opening b/w living and kitchen, remove wall b/w kitchen and sunroom, refinish (e) floors, new paint, add new lighting , replace (e) side and rear metal windows with alum/clad in historic style, add new alum/clad wood window at rear patio, kitchen remodel in place.Details
reconfigure (e) bath, enlarge (e) opening b/w living and kitchen, remove wall b/w kitchen and sunroom, refinish (e) floors, new paint, add new lighting , replace (e) side and rear metal windows with alum/clad in historic style, add new alum/clad wood window at rear patio, kitchen remodel in place. | $80,000 |
| Dec 16, 2020 | Completed final sign-off Feb 2021 | 374 15th Av | remodel of the bathroom, upgrade plumbing and electrical, same floor layout, no change in walls, floors or windows.Details
remodel of the bathroom, upgrade plumbing and electrical, same floor layout, no change in walls, floors or windows. | $40,000 |
| Feb 12, 2020 | Completed final sign-off Oct 2020 | 15 San Lorenzo Wy | create new opening from dining room to kitchen, removel e kitchen, remodel and expand e level 1 bath, remodel e master bath, remodel e lvl 3 bath, add ext stairs, off level 1 study. door, expand e door op9ening at rear fam rm, replace e slider w french doors and side lites, replace 1st lvl windowsDetails
create new opening from dining room to kitchen, removel e kitchen, remodel and expand e level 1 bath, remodel e master bath, remodel e lvl 3 bath, add ext stairs, off level 1 study. door, expand e door op9ening at rear fam rm, replace e slider w french doors and side lites, replace 1st lvl windows | $125,000 |
| Sep 5, 2019 | Completed final sign-off Mar 2023 | 1006 Capitol Av | rebuild rear 1st & 2nd floors, extend by 5'10, (n) 2nd fl deck. remodel interior, add 3rd fl dormer & bathroom, (n) interior stairs, (n) heating & electrical, rewire & replumbingDetails
rebuild rear 1st & 2nd floors, extend by 5'10, (n) 2nd fl deck. remodel interior, add 3rd fl dormer & bathroom, (n) interior stairs, (n) heating & electrical, rewire & replumbing | $188,000 |
| Jul 16, 2019 | Completed final sign-off Dec 2019 | 31 Caselli Av | bathroom remodelDetails
bathroom remodel | $18,000 |
| Jul 16, 2019 | Completed final sign-off Jan 2020 | 301 San Marcos Av | bathroom remodelDetails
bathroom remodel | $18,000 |
| Mar 21, 2019 | Completed final sign-off Dec 2019 | 602 30th Av | kitchen remodel on 2nd fl and 3rd fl per plan; hall bathroom remodel on 2nd and 3rd floorsDetails
kitchen remodel on 2nd fl and 3rd fl per plan; hall bathroom remodel on 2nd and 3rd floors | $30,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 283 28th Av | remodel main bath 2nd fl.Details
remodel main bath 2nd fl. | $25,000 |
| Dec 7, 2018 | Completed final sign-off Mar 2019 | 33 San Jacinto Wy | remodel bathroom, replace tub, toilet, and sink. retile floor and walls. approx 50 sq ft.Details
remodel bathroom, replace tub, toilet, and sink. retile floor and walls. approx 50 sq ft. | $28,000 |