Back to kitchen remodel contractors
The Toboni Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2026
- Last 24 months
- 48 permits filed
270 permits since 2000: 194 completed, 46 in progress, 18 never finaled, 12 expired or cancelled.
Of the 18 never-finaled permits, 5 are 3 to 5 years old, 8 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
50 kitchen remodel permits: 39 completed, 6 in progress, 2 never finaled, 3 expired or cancelled. Typically 16 days from filing to permit and 336 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 2206 Lake St | 3rd floor bathroom in kind renovation, patch + paint, add bookshelves. waterproofing @ rear deck (less than 50%) non-visible from st. replace finishes @ kitchen 1st fl.Details
3rd floor bathroom in kind renovation, patch + paint, add bookshelves. waterproofing @ rear deck (less than 50%) non-visible from st. replace finishes @ kitchen 1st fl. | $100,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 540 El Camino Del Mar | modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spaDetails
modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spa | $150,000 |
| Aug 26, 2025 | In progress issued Sep 2025 | 1601 Monterey Bl | dry rot and minor assbestos removal/remediation at mechanical room, kitchen hood, bath fans, and furnace ducting.Details
dry rot and minor assbestos removal/remediation at mechanical room, kitchen hood, bath fans, and furnace ducting. | $2,000 |
| Jul 29, 2025 | In progress issued Nov 2025 | 540 El Camino Del Mar | interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075.Details
interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075. | $650,000 |
| May 22, 2025 | In progress issued Jun 2025 | 540 El Camino Del Mar | remodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced.Details
remodel (7) bathrooms and (1) kitchen. lead paint abatement: 1100 sqft of sheetrock to be removed and replaced. | $250,000 |
| Jan 29, 2025 | Completed final sign-off Aug 2026 | 2855 Pacific Av | exploratory demolition to explore framing conditions(kitchen, lower level media). restore installation and drywall. like for like.Details
exploratory demolition to explore framing conditions(kitchen, lower level media). restore installation and drywall. like for like. | $2,000 |
| Jan 9, 2025 | Completed final sign-off Aug 2025 | 2747 Vallejo St | replace finishes in kitchen and bathroom, no change to any mep locations. all fixtures location to remain, replace tiles, stone, and refinish cabinets.Details
replace finishes in kitchen and bathroom, no change to any mep locations. all fixtures location to remain, replace tiles, stone, and refinish cabinets. | $500,000 |
| Dec 24, 2024 | In progress issued May 2025 | 3575 Clay St | new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical.Details
new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical. | $850,000 |
| Nov 18, 2024 | Completed final sign-off Jun 2026 | 3447 Clay St | interior remodel within existing building footprint, new exterior doors and 35 sf. insfill at east exterior 1st level facade. to include kitchen and 5 bath remodel, structural.Details
interior remodel within existing building footprint, new exterior doors and 35 sf. insfill at east exterior 1st level facade. to include kitchen and 5 bath remodel, structural. | $450,000 |
| Mar 13, 2024 | Completed final sign-off Feb 2025 | 294 Page St | interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair.Details
interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair. | $10,000 |
| Jan 26, 2024 | Completed final sign-off Jan 2026 | 2917 Laguna St | remove and replace cabinet faces, kitchen plumbing fixtures and stone countertops. in kindDetails
remove and replace cabinet faces, kitchen plumbing fixtures and stone countertops. in kind | $20,000 |
| Aug 3, 2023 | Completed final sign-off May 2024 | 2210 Vallejo St | replace (8) wood windows in kind, visible from public right of way. replace (1) window frame and sahs on rear facade kitchen (not visible from public right of way) o.g lugsDetails
replace (8) wood windows in kind, visible from public right of way. replace (1) window frame and sahs on rear facade kitchen (not visible from public right of way) o.g lugs | $7,000 |
| May 15, 2023 | Completed final sign-off May 2023 | 1291 03rd Av | revision to clarify scope of pa# 202304105385: ground floor until 1291 bath remodel in kind only. 1289 second floor bathroom remodel, replace plumbing fixtures and new lighting. no kitchen work anywhere.Details
revision to clarify scope of pa# 202304105385: ground floor until 1291 bath remodel in kind only. 1289 second floor bathroom remodel, replace plumbing fixtures and new lighting. no kitchen work anywhere. | |
| Apr 10, 2023 | Completed final sign-off May 2023 | 1291 03rd Av | 1st floor bathroom remodel- 2nd floor fixtures replacement. kitchen and bathroom remodel. no structural work.Details
1st floor bathroom remodel- 2nd floor fixtures replacement. kitchen and bathroom remodel. no structural work. | $2,500 |
| Apr 6, 2023 | Completed final sign-off May 2024 | 2210 Vallejo St | remodel of existing fixtures and finishes of kitchen, laundry, and primary bathroom. replacement in kind of lighting. new flooring throughout.Details
remodel of existing fixtures and finishes of kitchen, laundry, and primary bathroom. replacement in kind of lighting. new flooring throughout. | $150,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry doorDetails
main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry door | $2,400,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures.Details
existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures. | $200,000 |
| Oct 6, 2021 | Completed final sign-off Aug 2022 | 2700 Pierce St | interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kindDetails
interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kind | $200,000 |
| May 20, 2021 | Completed final sign-off Sep 2021 | 224 Presidio Av | kitchen fixtures and finishes replacement in-kind.Details
kitchen fixtures and finishes replacement in-kind. | $75,000 |
| Feb 5, 2021 | Completed final sign-off Jan 2026 | 2900 Broadway | interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls.Details
interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls. | $1,500,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2023 | 2720 Lyon St | temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same heightDetails
temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same height | $2,000 |
| Jul 11, 2019 | Completed final sign-off Oct 2021 | 2640 Broderick St | removal kitchen cabintets. and exploratory demo. for structural assessment.Details
removal kitchen cabintets. and exploratory demo. for structural assessment. | $5,000 |
| Feb 1, 2019 | Completed final sign-off Aug 2019 | 15 Presidio Tr | interior kitchen and bath remodel, per plans. maher n/a.Details
interior kitchen and bath remodel, per plans. maher n/a. | $45,000 |
| Nov 28, 2018 | Completed final sign-off Dec 2020 | 2747 Vallejo St | windows, doors & finishes @ rear facade, interior remodel of the 3 & 4 flrs with associated structural work remodel of (e) family rm kitchen &didint rm, on 3rd flr remodel of (e) master suite bedroom & bathroom on 4th flr addition of elevator from garage to 4th flrDetails
windows, doors & finishes @ rear facade, interior remodel of the 3 & 4 flrs with associated structural work remodel of (e) family rm kitchen &didint rm, on 3rd flr remodel of (e) master suite bedroom & bathroom on 4th flr addition of elevator from garage to 4th flr | $500,000 |
| Sep 11, 2017 | Completed final sign-off Jul 2023 | 2720 Lyon St | interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairsDetails
interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairs | $300,000 |
| Aug 17, 2017 | Completed final sign-off Dec 2019 | 76 San Rafael Wy | new rear yard addition, addition of conditioned space at basement. interior remodel to include kitchen and additional (3) baths and (1) powder room.Details
new rear yard addition, addition of conditioned space at basement. interior remodel to include kitchen and additional (3) baths and (1) powder room. | $295,000 |
| Jul 18, 2017 | Completed final sign-off Aug 2017 | 330 Presidio Av | replace rear deck board/dry rot less than 50 %, replace kitchen countertops, replace bsthroom tile, no strudtural, electrical or plumbing work.Details
replace rear deck board/dry rot less than 50 %, replace kitchen countertops, replace bsthroom tile, no strudtural, electrical or plumbing work. | $10,000 |
| Jan 17, 2017 | Completed final sign-off Jun 2017 | 2855 Jackson St | new cabinets, paint, tile and some electrical and plumbing work in kitchenDetails
new cabinets, paint, tile and some electrical and plumbing work in kitchen | $75,000 |
| Sep 13, 2016 | Completed final sign-off Jun 2019 | 775 Page St | add unit per ord 30-15. convert (e) storage into (n) 525 sq ft unit with 1 kitchen, 1 bath, 1 bedroom, 1 living room.Details
add unit per ord 30-15. convert (e) storage into (n) 525 sq ft unit with 1 kitchen, 1 bath, 1 bedroom, 1 living room. | $50,000 |
| Aug 6, 2015 | Completed final sign-off Feb 2016 | 3140 Clay St | kitchen remodel, bathroom remodel, new lighting & other. cosmetic work. no changes to layout, walls or openings. no structural work.Details
kitchen remodel, bathroom remodel, new lighting & other. cosmetic work. no changes to layout, walls or openings. no structural work. | $150,000 |
| May 14, 2015 | Completed final sign-off Jan 2016 | 2701 Pacific Av | remove interior bearing wall @ 2nd flr between dining room and kitchen. minor cosmetic remodel.Details
remove interior bearing wall @ 2nd flr between dining room and kitchen. minor cosmetic remodel. | $200,000 |
| Apr 3, 2015 | Completed final sign-off Apr 2019 | 2829 Divisadero St | 3-story rear addition, widening garage door & driveway. interior remodel & associated structural work. interior includes removal of some walls, remodel bath, bedroom, elevator, kitchen & enlarge kitchen.Details
3-story rear addition, widening garage door & driveway. interior remodel & associated structural work. interior includes removal of some walls, remodel bath, bedroom, elevator, kitchen & enlarge kitchen. | $460,000 |
| Mar 9, 2015 | Expired or cancelled cancelled Nov 2016 | 566 Kansas St | remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building.Details
remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building. | $235,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2016 | 2951 Pine St | new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door.Details
new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door. | $480,000 |
| Jan 5, 2015 | Completed final sign-off Apr 2015 | 2200 Sacramento St | #205 - remodel kitchen & 1 & 1/2 bathrooms plus misc work. no structural or exterior work. no work to windows or doors. n/a maher ordinanceDetails
#205 - remodel kitchen & 1 & 1/2 bathrooms plus misc work. no structural or exterior work. no work to windows or doors. n/a maher ordinance | $48,000 |
| Dec 30, 2014 | Completed final sign-off Dec 2016 | 350 15th Av | add (1) bedroom unit & garage @ basement level & family room @ rear of building on 1st level. unit includes (1) kitchen & (1) bath.Details
add (1) bedroom unit & garage @ basement level & family room @ rear of building on 1st level. unit includes (1) kitchen & (1) bath. | $98,000 |
| Aug 12, 2014 | Expired or cancelled expired Jun 2018 | 611 Marina Bl | revision to 201312134202 to revise 2 window sizes at kitchen and 1 window at master bath. primary facade window enlarge. new window to be wood with stucco to match existing. 3/f & master bathrooms modified. bathroom, toilet moved, shower decreased & vanities moved. bath tub size increased, shower &Details
revision to 201312134202 to revise 2 window sizes at kitchen and 1 window at master bath. primary facade window enlarge. new window to be wood with stucco to match existing. 3/f & master bathrooms modified. bathroom, toilet moved, shower decreased & vanities moved. bath tub size increased, shower & | |
| Dec 13, 2013 | Expired or cancelled expired Jun 2018 | 611 Marina Bl | horizontal addition at second floor kitchen, interior remodel work at kitchen, master bathroom and bathroom at third floor. all window replacement units to be wood sash.-maher- compliance with ordinance no. 155-13.not required.Details
horizontal addition at second floor kitchen, interior remodel work at kitchen, master bathroom and bathroom at third floor. all window replacement units to be wood sash.-maher- compliance with ordinance no. 155-13.not required. | $95,000 |
| Dec 10, 2013 | Completed final sign-off May 2015 | 3385 Jackson St | remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement.Details
remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement. | $250,000 |
| Sep 13, 2013 | Completed final sign-off May 2015 | 3385 Jackson St | remove & replace (e) sheetrock at all floors as required w/ 5/8" type "x" gypsum board; no structural work, update finishes and fixtures in kitchen and 5 1/2 baths; no exterior work; to comply with cec 150(k) 8 & 10.Details
remove & replace (e) sheetrock at all floors as required w/ 5/8" type "x" gypsum board; no structural work, update finishes and fixtures in kitchen and 5 1/2 baths; no exterior work; to comply with cec 150(k) 8 & 10. | $85,000 |
| Apr 18, 2012 | Completed final sign-off Jan 2013 | 2340 Washington St | kitchen remodel, new elevator, remodel 3 baths and 2 powder rooms, new spa, media room and wine cellar at basement.Details
kitchen remodel, new elevator, remodel 3 baths and 2 powder rooms, new spa, media room and wine cellar at basement. | $130,000 |
| Dec 9, 2011 | Completed final sign-off Mar 2013 | 1650 Chestnut St | shore existing structure and remove and replace foundaton elements only. no other alterations. to document removal of e kitchen and bath at gr fl. ref app 201112070249Details
shore existing structure and remove and replace foundaton elements only. no other alterations. to document removal of e kitchen and bath at gr fl. ref app 201112070249 | $40,000 |
| Dec 7, 2011 | Completed final sign-off Mar 2013 | 1650 Chestnut St | kitchen and 2 bath remodel, new cabinets and finishes, no structural workDetails
kitchen and 2 bath remodel, new cabinets and finishes, no structural work | $30,000 |
| Dec 7, 2011 | Completed final sign-off Jan 2013 | 2340 Washington St | kitchen and 4 bath remodel, new cabinets and finishes, no structural workDetails
kitchen and 4 bath remodel, new cabinets and finishes, no structural work | $60,000 |
| Dec 6, 2011 | Completed final sign-off Feb 2012 | 1998 Broadway | kitchen & 1 bathroom remodel-new cabinets & finishes. no structural workDetails
kitchen & 1 bathroom remodel-new cabinets & finishes. no structural work | $35,000 |
| Mar 4, 2011 | Completed final sign-off May 2011 | 2729 Filbert St | new kitchen cabinets, appliances, counter tops. new bath tile and fixtures.Details
new kitchen cabinets, appliances, counter tops. new bath tile and fixtures. | $30,000 |
| Jun 4, 2010 | Completed final sign-off Oct 2011 | 2507 Pacific Av | interior remodel at all levels incl. renovation of kitchen and 4 1/2 bathrooms, add new elevator and relocate staircaseDetails
interior remodel at all levels incl. renovation of kitchen and 4 1/2 bathrooms, add new elevator and relocate staircase | $340,000 |
| Apr 23, 2010 | Completed final sign-off Oct 2011 | 2507 Pacific Av | add garage, addition at rear, remodel kitchen & 4-1/2 bathrooms & misc. improvements.Details
add garage, addition at rear, remodel kitchen & 4-1/2 bathrooms & misc. improvements. | $390,000 |
| Nov 30, 2009 | Completed final sign-off Dec 2010 | 2838 Polk St | rebuild existing staircase at lightwell, addition at existing lightwell, new bay window at front facade, new stair & landing at rear, remodel (2) kitchens & (2) baths, add (2) baths, new dual glazed wood windows, misc improvement.Details
rebuild existing staircase at lightwell, addition at existing lightwell, new bay window at front facade, new stair & landing at rear, remodel (2) kitchens & (2) baths, add (2) baths, new dual glazed wood windows, misc improvement. | $360,000 |
| Oct 5, 2005 | Completed final sign-off Nov 2006 | 461 Frederick St | to remove non structural & drywall,kitchen cabinet,sink,bathroom fixtures.drywall removal about 20%of all (e) walls.Details
to remove non structural & drywall,kitchen cabinet,sink,bathroom fixtures.drywall removal about 20%of all (e) walls. | $10,000 |