Back to kitchen remodel contractors
Terence Mcmahon Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Jul 2026
- Last 24 months
- 56 permits filed
551 permits since 2000: 426 completed, 27 in progress, 74 never finaled, 24 expired or cancelled.
Of the 74 never-finaled permits, 14 are 3 to 5 years old, 36 are 5 to 10 years old, 24 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
105 kitchen remodel permits: 88 completed, 6 in progress, 6 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 183 days from permit to final inspection.
Showing the 100 most recent of 105.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2026 | In progress issued May 2026 | 1880 Steiner St | unit 310: kitchen remodel 85 sq ft, and bathroom remodel, 80 sq ft, guest bathroom 70 sq ft, new ceiling lights throughout home, electrical and plumbing updates as needed.Details
unit 310: kitchen remodel 85 sq ft, and bathroom remodel, 80 sq ft, guest bathroom 70 sq ft, new ceiling lights throughout home, electrical and plumbing updates as needed. | $85,000 |
| Apr 28, 2026 | In progress issued Jun 2026 | 2140 Clement St | tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchenDetails
tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchen | $65,000 |
| Mar 10, 2026 | Completed final sign-off Jul 2026 | 151 Broderick St | 1st flr: kitchen remodel, replace in kind, non structual, no changes to layout, kitchen approx 280 sq ft.Details
1st flr: kitchen remodel, replace in kind, non structual, no changes to layout, kitchen approx 280 sq ft. | $50,000 |
| Mar 6, 2026 | Completed final sign-off Mar 2026 | 1451 Montgomery St | unit 4: existing non bearing portion of wall between kitchen and dining room to be removed.Details
unit 4: existing non bearing portion of wall between kitchen and dining room to be removed. | $63,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 1350 16th Av | kitchen remodel. replace in kind. kitchen approx 180 sq ft.Details
kitchen remodel. replace in kind. kitchen approx 180 sq ft. | $32,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 1451 Montgomery St | apt 4: kitchen remodel. non-structural work. no change to layout or locations. replace in-kind.Details
apt 4: kitchen remodel. non-structural work. no change to layout or locations. replace in-kind. | $40,000 |
| Sep 29, 2025 | Completed final sign-off Jan 2026 | 812 35th Av | kitchen remodel: replace in-kind non-structural, no change to layout. kitchen approx. 125 sq ft.Details
kitchen remodel: replace in-kind non-structural, no change to layout. kitchen approx. 125 sq ft. | $65,000 |
| Aug 8, 2025 | In progress issued Aug 2025 | 390 27th Av | kitchen remodel in kind on first floor. guest bathroom and master bathroom remodel in kind on second floor. no structural change to layout or framing. kitchen 190 sq ft. guest bathrooom 40 sq ft, master bathroom 80 sq ft.Details
kitchen remodel in kind on first floor. guest bathroom and master bathroom remodel in kind on second floor. no structural change to layout or framing. kitchen 190 sq ft. guest bathrooom 40 sq ft, master bathroom 80 sq ft. | $80,000 |
| Jul 18, 2025 | Completed final sign-off Jan 2026 | 1407 Cabrillo St | replace in kind, kitchen, full bath & powder room. non structural no change to layout. bathroom located on 2nd fl approx 100 sq ft. powder room located on first fl approx 25 sqftDetails
replace in kind, kitchen, full bath & powder room. non structural no change to layout. bathroom located on 2nd fl approx 100 sq ft. powder room located on first fl approx 25 sqft | $65,000 |
| Jul 18, 2025 | Completed final sign-off Jan 2026 | 3074 Pacific Av | remodel (e) kitchen and 1-story expansion into (e) courtyard of (e) 2-story single family dwelling. new fixtures and finishes throughout kitchen. work not visible from public right of wayDetails
remodel (e) kitchen and 1-story expansion into (e) courtyard of (e) 2-story single family dwelling. new fixtures and finishes throughout kitchen. work not visible from public right of way | $25,000 |
| Aug 2, 2024 | In progress issued Aug 2024 | 2140 Great Hy | portion of existing wall to be removed between living room & kitchen 2nd fl. install new beams living room/kitchen areaDetails
portion of existing wall to be removed between living room & kitchen 2nd fl. install new beams living room/kitchen area | $5,000 |
| Jul 31, 2024 | Completed final sign-off Apr 2025 | 2255 Clay St | interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces.Details
interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces. | $115,000 |
| Jun 5, 2024 | Completed final sign-off Feb 2025 | 2140 Great Hy | (1) kitchen and (1) bathroom remodel on 1st floor. replace in kind all new fixtures and fittings , electrical and plumbing upgrades. bathroom 80 sqft, kitchen 110 sqft.Details
(1) kitchen and (1) bathroom remodel on 1st floor. replace in kind all new fixtures and fittings , electrical and plumbing upgrades. bathroom 80 sqft, kitchen 110 sqft. | $40,000 |
| Apr 12, 2024 | Completed final sign-off Jun 2024 | 1710 48th Av | kitchen remodel: replace cabinets, new fixtures, and fitting. new countertops. no change to layout. non structural.Details
kitchen remodel: replace cabinets, new fixtures, and fitting. new countertops. no change to layout. non structural. | $25,000 |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 30 Liberty St | kitchen and bathroom remodel. non structural. in each unit. total 6 kitchens and 6 bathrooms. in kindDetails
kitchen and bathroom remodel. non structural. in each unit. total 6 kitchens and 6 bathrooms. in kind | $75,000 |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 1150 Lombard St | unit #3: replace old kitchen cabinets with new cabinets, new flooring in kitchen area only. new plumbing fixtures, new stone tops, new gile back splash and new range and hood. non structural.Details
unit #3: replace old kitchen cabinets with new cabinets, new flooring in kitchen area only. new plumbing fixtures, new stone tops, new gile back splash and new range and hood. non structural. | $35,000 |
| Feb 15, 2024 | Completed final sign-off Oct 2024 | 111 Chestnut St | unit #605: kitchen and 2 bathrooms remodel. plumbing and electrical upgrades. all new fixtures and fittings.Details
unit #605: kitchen and 2 bathrooms remodel. plumbing and electrical upgrades. all new fixtures and fittings. | $150,000 |
| Dec 7, 2023 | Completed final sign-off Apr 2025 | 463 Duncan St | add counter-top casework "appliance garage" @ kitchen cabinets, install buffet @ dining room and at fireplaceDetails
add counter-top casework "appliance garage" @ kitchen cabinets, install buffet @ dining room and at fireplace | $25,000 |
| Aug 22, 2023 | Completed final sign-off Dec 2023 | 240 Lombard St | unit # 929: bathroom remodel. non-structural. replacing shower fixtures, bathtub stays, replace toilet. new tile floor and tile wall. add new shower door. replace carpet in bedroom with wood. replace kitchen countertop.Details
unit # 929: bathroom remodel. non-structural. replacing shower fixtures, bathtub stays, replace toilet. new tile floor and tile wall. add new shower door. replace carpet in bedroom with wood. replace kitchen countertop. | $30,000 |
| Jul 18, 2023 | Completed final sign-off Jan 2025 | 4 Ashbury Tr | int improvement. kitchen/bath remodel. new flooring/windows (not street visible) of existing. 2nd&3rd fl reconfiguration mep, struct, reinforcement @ basement lv. no excavation, no change to ext envelope, no facade work, no work in prow. (n) wdw on side, not street vis.Details
int improvement. kitchen/bath remodel. new flooring/windows (not street visible) of existing. 2nd&3rd fl reconfiguration mep, struct, reinforcement @ basement lv. no excavation, no change to ext envelope, no facade work, no work in prow. (n) wdw on side, not street vis. | $289,103 |
| Jun 9, 2023 | Completed final sign-off Oct 2024 | 1447 Willard St | remodel (e) kitchen & improvements. no change in locations. interior rmeodel & water damage repairs/replace. no other proposed changes to exterior or occupancy usage.Details
remodel (e) kitchen & improvements. no change in locations. interior rmeodel & water damage repairs/replace. no other proposed changes to exterior or occupancy usage. | $300,000 |
| Apr 24, 2023 | Completed final sign-off Aug 2023 | 16 Vicksburg St | kitchen remodel cabinets, applicances, countertops, elec & plumb. no change in location. new powder room relocated to existing laundry room location. new laundry room remodel of cabinets, countertops, plumb & elec. remove post w/n stl beams.no change to ext (e) building nor occupancy usageDetails
kitchen remodel cabinets, applicances, countertops, elec & plumb. no change in location. new powder room relocated to existing laundry room location. new laundry room remodel of cabinets, countertops, plumb & elec. remove post w/n stl beams.no change to ext (e) building nor occupancy usage | $78,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2023 | 267 Sussex St | laundry and kitchen cabinet spray paint, replace flooring with pre-finished hardwood and skylight (in kind replacement).r&r skylight no change in sizeDetails
laundry and kitchen cabinet spray paint, replace flooring with pre-finished hardwood and skylight (in kind replacement).r&r skylight no change in size | $28,750 |
| Oct 25, 2022 | Completed final sign-off Mar 2023 | 1443 16th Av | (1) kitchen, (1) bath and (1) powder room remodel, new electrical and plumbing fixtures, new tile, new stone and cabinets, no structural work involvedDetails
(1) kitchen, (1) bath and (1) powder room remodel, new electrical and plumbing fixtures, new tile, new stone and cabinets, no structural work involved | $105,000 |
| Oct 6, 2022 | Completed final sign-off Mar 2023 | 1818 Divisadero St | add privacy partition wall to staff area with door. add kitchenette: sink, microwave, fridge, outlets, cabinets. add outlets at cash wrap + other required locations. add awning under separate permit.Details
add privacy partition wall to staff area with door. add kitchenette: sink, microwave, fridge, outlets, cabinets. add outlets at cash wrap + other required locations. add awning under separate permit. | $10,000 |
| Aug 11, 2022 | Expired or cancelled expired Nov 2024 | 2566 Pine St | (unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep.Details
(unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep. | $85,000 |
| Jul 20, 2022 | Completed final sign-off Apr 2023 | 1721 Beach St | unit 1721: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms. unit 1723: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms.Details
unit 1721: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms. unit 1723: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms. | $30,000 |
| Jun 10, 2022 | Completed final sign-off Jul 2022 | 1150 Lombard St | water damage repair in kitchen ceiling and hallway wallDetails
water damage repair in kitchen ceiling and hallway wall | $27,000 |
| Mar 17, 2022 | Completed final sign-off Nov 2022 | 20 Hernandez Av | one full kitchen & one powder room remodel. new tile, new electrical, & plumbing fixtures, new accessories, new paint. non structural.Details
one full kitchen & one powder room remodel. new tile, new electrical, & plumbing fixtures, new accessories, new paint. non structural. | $77,850 |
| Mar 8, 2022 | Completed final sign-off Jul 2022 | 946 Oak St | kitchen and bathroom remodel at top floor of building. new tile, new plumbing, and electrical fixtures.Details
kitchen and bathroom remodel at top floor of building. new tile, new plumbing, and electrical fixtures. | $67,500 |
| Oct 15, 2021 | Completed final sign-off Apr 2022 | 2928 Steiner St | one kitchen remodel at main level, new plumbing and electrical fixtures, new stove, new back splash. one bathroom remodel at 2nd floor, new tile, new plumbing and electrical fixtures. replace one window in kind. u=.30 maxDetails
one kitchen remodel at main level, new plumbing and electrical fixtures, new stove, new back splash. one bathroom remodel at 2nd floor, new tile, new plumbing and electrical fixtures. replace one window in kind. u=.30 max | $91,500 |
| Sep 28, 2021 | Completed final sign-off Jun 2022 | 2131 Pierce St | apt #1: 1 kitchen and 1 bathroom remodel. replace 3 windows and 1 door (all not facing st) non structural work. u-factor less than or equal to 0.30Details
apt #1: 1 kitchen and 1 bathroom remodel. replace 3 windows and 1 door (all not facing st) non structural work. u-factor less than or equal to 0.30 | $107,000 |
| Sep 10, 2021 | Completed final sign-off Dec 2021 | 2 Lapham Wy | complete bathroom & kitchen remodel. install new tile, countertops, new electrical & plumbing fixtures. new layout. but kitchen appliances are not to be replaced.Details
complete bathroom & kitchen remodel. install new tile, countertops, new electrical & plumbing fixtures. new layout. but kitchen appliances are not to be replaced. | $49,800 |
| Aug 23, 2021 | Expired or cancelled cancelled Jan 2026 | 52 Tamalpais Tr | 1st floor: existing wall between garage and storage to be relocated. 2nd floor: existing skylight at kitchen to be infill.Details
1st floor: existing wall between garage and storage to be relocated. 2nd floor: existing skylight at kitchen to be infill. | $48,000 |
| Jul 29, 2021 | Never finaled issued Aug 2021, no final | 2222 Lyon St | interior remodel all floors, convert partial garage to habitable space. kitchen remodel 2nd fl. replace int doors and rear windows 2nd and 3rd fl. all proposed wall shall conform to sf code. fixture and furnishing to remain unless noted.Details
interior remodel all floors, convert partial garage to habitable space. kitchen remodel 2nd fl. replace int doors and rear windows 2nd and 3rd fl. all proposed wall shall conform to sf code. fixture and furnishing to remain unless noted. | $50,000 |
| Jul 12, 2021 | Completed final sign-off Apr 2022 | 212 Santa Paula Av | full kitchen remodel, windows in kitchen to be replaced. fireplace in living room to be replaced. add storage area in main and upper floor. windows not visible from street. ref. pa 202105069902. no foundation work. no work in basement.Details
full kitchen remodel, windows in kitchen to be replaced. fireplace in living room to be replaced. add storage area in main and upper floor. windows not visible from street. ref. pa 202105069902. no foundation work. no work in basement. | $110,000 |
| Jun 16, 2021 | Completed final sign-off Dec 2021 | 75 Clipper St | bathroom & kitchen remodel. all fixture locations to remain unchanged. no walls moveDetails
bathroom & kitchen remodel. all fixture locations to remain unchanged. no walls move | $20,000 |
| Jun 16, 2021 | Completed final sign-off Jan 2022 | 1910 Greenwich St | unit 8 - 2 bathrooms, kitchen, living room, 2 bathrooms & flooring replacement in hallway; new tile in both baths. new paint, new trims & baseboards. replace in kind 2 windows (not facing street)Details
unit 8 - 2 bathrooms, kitchen, living room, 2 bathrooms & flooring replacement in hallway; new tile in both baths. new paint, new trims & baseboards. replace in kind 2 windows (not facing street) | $48,500 |
| Jun 11, 2021 | Completed final sign-off Sep 2021 | 52 Tamalpais Tr | partial kitchen remodel, no structural work. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3.Details
partial kitchen remodel, no structural work. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3. | $22,000 |
| Jun 11, 2021 | Completed final sign-off Sep 2021 | 792 Ashbury St | one kitchen remodel, no structural. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3.Details
one kitchen remodel, no structural. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3. | $40,000 |
| May 21, 2021 | Completed final sign-off Dec 2021 | 33 Pond St | kitchen & bathroom remode. no structural work. no moving walls.Details
kitchen & bathroom remode. no structural work. no moving walls. | $68,000 |
| May 6, 2021 | Completed final sign-off Apr 2022 | 212 Santa Paula Av | kitchen & mud room remodel. no structural workDetails
kitchen & mud room remodel. no structural work | $49,000 |
| May 5, 2021 | Completed final sign-off Oct 2021 | 33 Pond St | kitchen and master bathroom remodel. no structural work.Details
kitchen and master bathroom remodel. no structural work. | $85,000 |
| Apr 6, 2021 | Never finaled issued Apr 2021, no final | 1020 Vallejo St | unit 1 - kitchen, bathroom, powder, and pantry room remodel. no structural work. no fire sprinklers or fire alarm modification.Details
unit 1 - kitchen, bathroom, powder, and pantry room remodel. no structural work. no fire sprinklers or fire alarm modification. | $50,000 |
| Mar 26, 2021 | Completed final sign-off May 2021 | 2163 Funston Av | kitchen remodel . no structural workDetails
kitchen remodel . no structural work | $30,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2024 | 614 Buchanan St | demo rear (e) wood exterior egress stair & non-compliant balcony (#616 kitchen) replace & relocate. demo (e) roof for (n) roof deck & glazed wind protection. (n) mech & photovoltaic system. replace (e) single glazed windows w/ double glazed. interior remodeling in both unitsDetails
demo rear (e) wood exterior egress stair & non-compliant balcony (#616 kitchen) replace & relocate. demo (e) roof for (n) roof deck & glazed wind protection. (n) mech & photovoltaic system. replace (e) single glazed windows w/ double glazed. interior remodeling in both units | $595,000 |
| Mar 10, 2021 | Completed final sign-off Feb 2022 | 241 Montalvo Av | open concept kitchen/dining room. add 2 post and one beam. move cooktop from island to wall.Details
open concept kitchen/dining room. add 2 post and one beam. move cooktop from island to wall. | $60,000 |
| Feb 5, 2021 | Completed final sign-off Jul 2021 | 2933 Broderick St | replace fireplace appliance on top floor with valor h5. add recessed can lighting in bedrooms. replace 3 panel doors at rear of house in kind (not visible from the street) replace refrig. cabinets in kitchen. no rough opening changes. no new wall. no (e) wall relocation.Details
replace fireplace appliance on top floor with valor h5. add recessed can lighting in bedrooms. replace 3 panel doors at rear of house in kind (not visible from the street) replace refrig. cabinets in kitchen. no rough opening changes. no new wall. no (e) wall relocation. | $65,000 |
| Dec 4, 2020 | Completed final sign-off Dec 2021 | 3009 Sacramento St | partial kitchen remodel, no layout change to walls and openings.Details
partial kitchen remodel, no layout change to walls and openings. | $18,000 |
| Nov 13, 2020 | Completed final sign-off May 2022 | 2928 Steiner St | full kitchen remodel. no demolition of wall.Details
full kitchen remodel. no demolition of wall. | $43,000 |
| Nov 9, 2020 | Completed final sign-off Nov 2023 | 527 43rd Av | reconfigure garage & 1st fl storage for new interior common stair serve 2 units with a total of 3 stops. reconfigure & renovate kitchen areas at 593 a&b at 2nd fl. new opening at 2nd floor at rear.Details
reconfigure garage & 1st fl storage for new interior common stair serve 2 units with a total of 3 stops. reconfigure & renovate kitchen areas at 593 a&b at 2nd fl. new opening at 2nd floor at rear. | $75,000 |
| Nov 6, 2020 | Completed final sign-off Apr 2021 | 1854 Golden Gate Av | kitchen remodel and replace 2 windows and on door at rear, not visible from street. (same opening). no change in walls and openings layout.Details
kitchen remodel and replace 2 windows and on door at rear, not visible from street. (same opening). no change in walls and openings layout. | $40,000 |
| Oct 14, 2020 | Completed final sign-off May 2022 | 655 10th Av | basement: remodel (e) basement, demo & (n) construction. (n) millworks. 1/f kitchen: demo & (n) construction. (n) plumbing, cabinetry, lighting, & finishes. 1/f powder rm: demo & (n) construction. (n) plumbing, lighting, & finishes. 1/f sun rm: (n) cabinetry. 1/f living rm: refinish (e) fireplace.Details
basement: remodel (e) basement, demo & (n) construction. (n) millworks. 1/f kitchen: demo & (n) construction. (n) plumbing, cabinetry, lighting, & finishes. 1/f powder rm: demo & (n) construction. (n) plumbing, lighting, & finishes. 1/f sun rm: (n) cabinetry. 1/f living rm: refinish (e) fireplace. | $100,000 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 2721 Bush St | kitchen remodel in-kind. no structural change, no wall changeDetails
kitchen remodel in-kind. no structural change, no wall change | $42,000 |
| Aug 19, 2020 | Completed final sign-off Jun 2021 | 106 Stanyan St | structural improvements and finish upgrades to an existing unit in a duplex located at 106 stanyan st. improvements include full remodel of master bathroom, fixture changes to guest bath, new kitchen cabinets, and appliances, move existing kitchen wall, patch flooring.Details
structural improvements and finish upgrades to an existing unit in a duplex located at 106 stanyan st. improvements include full remodel of master bathroom, fixture changes to guest bath, new kitchen cabinets, and appliances, move existing kitchen wall, patch flooring. | $33,000 |
| Aug 7, 2020 | Completed final sign-off Dec 2020 | 3565 Washington St | kitchen (~200 sqft) remodel; replace fixtures (refrigerator, sink + faucet, dishwasher, gas range, double oven, and range hood) and finishes. all in kind; no structural work.Details
kitchen (~200 sqft) remodel; replace fixtures (refrigerator, sink + faucet, dishwasher, gas range, double oven, and range hood) and finishes. all in kind; no structural work. | $72,000 |
| Feb 18, 2020 | Completed final sign-off Jul 2025 | 1364 Union St | add new clerestory sawtooth above extg entry, relocate extg skylight. partial remodel at extg kitchen. remodel extg guest and master bathroom. replace extg furnace.Details
add new clerestory sawtooth above extg entry, relocate extg skylight. partial remodel at extg kitchen. remodel extg guest and master bathroom. replace extg furnace. | $300,000 |
| Jan 3, 2020 | Expired or cancelled cancelled Jan 2020 | 1882 Church St | remodel kitchen and bathroom in kind. replace fixtures and finishes, cabinets, include lighting.Details
remodel kitchen and bathroom in kind. replace fixtures and finishes, cabinets, include lighting. | $82,000 |
| Aug 13, 2019 | Completed final sign-off Dec 2019 | 2442 Francisco St | remodel one bathroom in kind, fixtuer replacement. remodel one powder room in kind, fixture replacement. remodel kitchen, remove wall between kitchen and dinning room.Details
remodel one bathroom in kind, fixtuer replacement. remodel one powder room in kind, fixture replacement. remodel kitchen, remove wall between kitchen and dinning room. | $73,000 |
| Jul 1, 2019 | Completed final sign-off Sep 2019 | 647 Cole St | remove non-load bearing wall between kitchen & family room. remove existing chimney.Details
remove non-load bearing wall between kitchen & family room. remove existing chimney. | $5,000 |
| May 20, 2019 | Completed final sign-off Sep 2019 | 45 San Marcos Av | kitchen remodel, replace cabinets & counter, backsplash, appliances in kind. interior trim work, replace baseboards, door, window trim.Details
kitchen remodel, replace cabinets & counter, backsplash, appliances in kind. interior trim work, replace baseboards, door, window trim. | $65,000 |
| May 20, 2019 | Completed final sign-off Sep 2019 | 2467 40th Av | bath remodel - replace fixtures & finishes in kind. partial kitchen, replace cabinets, counter tops.Details
bath remodel - replace fixtures & finishes in kind. partial kitchen, replace cabinets, counter tops. | $58,000 |
| Feb 27, 2019 | Completed final sign-off Apr 2019 | 185 Edgewood Av | kitchen and 1/2 bath remodel: replace refrigerator, wall oves, hood, wine fridge, backsplash/counters, gfci's, non-led recessed to led, add of (n) light fixtures, (n) door interior, re-vamp non-led fixtures, (n) millwork.Details
kitchen and 1/2 bath remodel: replace refrigerator, wall oves, hood, wine fridge, backsplash/counters, gfci's, non-led recessed to led, add of (n) light fixtures, (n) door interior, re-vamp non-led fixtures, (n) millwork. | |
| Jan 30, 2019 | Completed final sign-off Sep 2019 | 176 Diamond St | revision to 201810163300, change interior stair location. reconfgure bath and kitchen, expand down into storage space for new master suite to inlcude 1 bedrm, full bath, laundry area. replace e deck finishes less than50%. facade windows and materials in kind. 620 sq ft at lower level.Details
revision to 201810163300, change interior stair location. reconfgure bath and kitchen, expand down into storage space for new master suite to inlcude 1 bedrm, full bath, laundry area. replace e deck finishes less than50%. facade windows and materials in kind. 620 sq ft at lower level. | $125,000 |
| Jan 16, 2019 | Completed final sign-off Jul 2019 | 1555 24th Av | no visible work from the st. demo (e) kitchen; infill existing atrium (79 sq ft); 3 new velux solar powered skylights; new kitchen & cabinetry; new pantry; new roof sloped to existing drain; new footing, other structuralDetails
no visible work from the st. demo (e) kitchen; infill existing atrium (79 sq ft); 3 new velux solar powered skylights; new kitchen & cabinetry; new pantry; new roof sloped to existing drain; new footing, other structural | $50,000 |
| Dec 14, 2018 | Completed final sign-off May 2019 | 17 Fortuna Av | interior renovation & reconfiguring of the (e) bath & bedroom closets to create 2 separate baths, new closets at bedrooms, & addition of washer dryer in (e) kitchenDetails
interior renovation & reconfiguring of the (e) bath & bedroom closets to create 2 separate baths, new closets at bedrooms, & addition of washer dryer in (e) kitchen | $25,000 |
| Oct 16, 2018 | Completed final sign-off Feb 2020 | 176 Diamond St | expand (e) 3rd fl. via doormers, reconfigure bedroom, closets, relocate bathroom from 2nd floor to this floor. reconfigure kitchen on 2nd fl. add home office spaces, reconfigure stair between all 3 levelsDetails
expand (e) 3rd fl. via doormers, reconfigure bedroom, closets, relocate bathroom from 2nd floor to this floor. reconfigure kitchen on 2nd fl. add home office spaces, reconfigure stair between all 3 levels | $125,000 |
| Sep 17, 2018 | Completed final sign-off Nov 2018 | 276 28th St | replace kitchen countertops sink& backsplash. add center light fixture in kitchen. add electrical outlets in sun room.Details
replace kitchen countertops sink& backsplash. add center light fixture in kitchen. add electrical outlets in sun room. | $21,000 |
| Aug 10, 2018 | Completed final sign-off Jun 2019 | 190 Escolta Wy | 1/fl: construct new bedroom, one new bathroom, relocate half toilet, remodel (e) family, & new media room. 2/f: remodel (e) bathroom & kitchen and new skylights.Details
1/fl: construct new bedroom, one new bathroom, relocate half toilet, remodel (e) family, & new media room. 2/f: remodel (e) bathroom & kitchen and new skylights. | $90,000 |
| Jun 12, 2018 | Completed final sign-off Sep 2018 | 655 21st Av | remodel bathroom and kitchen; cabinetry, fixtures & finishes replacement, electrical & plumbing under seperate permitDetails
remodel bathroom and kitchen; cabinetry, fixtures & finishes replacement, electrical & plumbing under seperate permit | $96,000 |
| Oct 19, 2017 | Completed final sign-off Oct 2022 | 880 Waller St | rear expansion under extg deck. main level expansion in rear. new bath, multipurpose room and enlarged kitchen. new rear windows and doors. extg decks to be repaired.Details
rear expansion under extg deck. main level expansion in rear. new bath, multipurpose room and enlarged kitchen. new rear windows and doors. extg decks to be repaired. | $60,000 |
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 510 Oak St | remodel kitchen w/new cabinets + counters. remodel (partial) bathroom, replace tub + tile surround only. no walls moved, removed, added or infilled. all exisitng layouts to remain unchanged.Details
remodel kitchen w/new cabinets + counters. remodel (partial) bathroom, replace tub + tile surround only. no walls moved, removed, added or infilled. all exisitng layouts to remain unchanged. | $40,000 |
| Apr 7, 2017 | Completed final sign-off Oct 2017 | 2367 Francisco St | remove and replace 4 (e) windows, in kind. 2 in bedroom at rear of building; (1) one in bathroom + (1) one in kitchen. non visible from the street.Details
remove and replace 4 (e) windows, in kind. 2 in bedroom at rear of building; (1) one in bathroom + (1) one in kitchen. non visible from the street. | $4,000 |
| Mar 31, 2017 | Expired or cancelled cancelled May 2017 | 2365 Francisco St | remove & replace 4 existing windows in-kind. 2 in bedroom at rear of building & one in bathroom not visible from street. one in kitchen not visible from street. n/a for maher.Details
remove & replace 4 existing windows in-kind. 2 in bedroom at rear of building & one in bathroom not visible from street. one in kitchen not visible from street. n/a for maher. | $4,000 |
| Jan 23, 2017 | Completed final sign-off Oct 2017 | 2365 Francisco St | replace insulation, sheetrock and trim to match existing. replace kitchen cabinets and countertops removed during demo. replace tile, tub & fixtures in bathroom and powder room.Details
replace insulation, sheetrock and trim to match existing. replace kitchen cabinets and countertops removed during demo. replace tile, tub & fixtures in bathroom and powder room. | $35,000 |
| Jan 6, 2017 | Completed final sign-off Sep 2017 | 901 Rankin St | revisiont to pa 2016-1028-1410 to add prep room adjacent to kitchen, snack area & dry storage areaDetails
revisiont to pa 2016-1028-1410 to add prep room adjacent to kitchen, snack area & dry storage area | $17,000 |
| Nov 17, 2016 | Completed final sign-off Jul 2024 | 735 Clementina St | legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinanceDetails
legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinance | $187,000 |
| Nov 1, 2016 | Completed final sign-off Jul 2017 | 1150 Lombard St | unit 38 - kitchen & bathroom int remodel. demo (e) kitchen cabinets, ma bath cabinets, doorway from dining to kitchen. wider doorway form dining to ktichen, new wall in maste shower, new doorway into master closet 2, fill-in doorway from study to master bedroom, refinish (e) flrs, recessed lighting.Details
unit 38 - kitchen & bathroom int remodel. demo (e) kitchen cabinets, ma bath cabinets, doorway from dining to kitchen. wider doorway form dining to ktichen, new wall in maste shower, new doorway into master closet 2, fill-in doorway from study to master bedroom, refinish (e) flrs, recessed lighting. | $90,000 |
| Oct 28, 2016 | Completed final sign-off Sep 2017 | 901 Rankin St | 2nd flr: demo and construction of new walls, doors and windows to provide a commercial kitchen at the good eggs tenant space. a dry storage & snack area will also be constructed. new finishes & new lighting will be provided in a portion of the space. mep/fire/life saftey under sep permit maher naDetails
2nd flr: demo and construction of new walls, doors and windows to provide a commercial kitchen at the good eggs tenant space. a dry storage & snack area will also be constructed. new finishes & new lighting will be provided in a portion of the space. mep/fire/life saftey under sep permit maher na | $121,853 |
| Oct 4, 2016 | Completed final sign-off Apr 2017 | 655 Victoria St | rev. to foundation pa#201605137459, develop g/f accessory rooms to include 1 master suite, 1 bedroom & 2 baths. interior remodel, new interior finishes, update baths, kitchen, heating system, hotwater, plumbing, electrical, roof, replace windows in kind. no footprint increase.Details
rev. to foundation pa#201605137459, develop g/f accessory rooms to include 1 master suite, 1 bedroom & 2 baths. interior remodel, new interior finishes, update baths, kitchen, heating system, hotwater, plumbing, electrical, roof, replace windows in kind. no footprint increase. | $68,000 |
| Jul 27, 2016 | Completed final sign-off Feb 2017 | 1585 16th Av | kitchen remodel: reface existing cabinets with new drawer and doors. install new cabinets at fridge & range. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3.Details
kitchen remodel: reface existing cabinets with new drawer and doors. install new cabinets at fridge & range. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3. | $25,000 |
| Jun 23, 2016 | Completed final sign-off Nov 2016 | 880 Waller St | kitchen updates, reconfiguration of interior walls, relocation of powder room, new lighting, new furnace, update/remodel of upper level kid's bath, and new master bath. no envelop increase/decrease. extg baths 1.5 proposed to be 2.5Details
kitchen updates, reconfiguration of interior walls, relocation of powder room, new lighting, new furnace, update/remodel of upper level kid's bath, and new master bath. no envelop increase/decrease. extg baths 1.5 proposed to be 2.5 | $300,000 |
| Jun 20, 2016 | Completed final sign-off Jan 2018 | 247 Saint Charles Av | remove & replace kitchen cabinets, replace tub and toilet.Details
remove & replace kitchen cabinets, replace tub and toilet. | $30,000 |
| May 4, 2016 | Completed final sign-off Nov 2016 | 1250 Ellis St | kitchen remodel install new cabinets.Details
kitchen remodel install new cabinets. | $21,160 |
| Jan 21, 2016 | Completed final sign-off Jul 2016 | 555 Flood Av | kitchen remodel. demo existing cabinets & replace with new cabinets & counter tops.Details
kitchen remodel. demo existing cabinets & replace with new cabinets & counter tops. | $30,000 |
| Dec 9, 2015 | Completed final sign-off Apr 2016 | 2820 Jackson St | replace kitchen island & bench/seat,replace kitchen sink,reface (e)kitchen,cabinets & drawers,add recessed lights in ceiling in kitchen.Details
replace kitchen island & bench/seat,replace kitchen sink,reface (e)kitchen,cabinets & drawers,add recessed lights in ceiling in kitchen. | $50,000 |
| Jul 20, 2015 | Completed final sign-off Nov 2015 | 383 Lombard St | #404 - remodel (e) kitchen & replace (e) header beam & widen the (e) kitchen entrance.Details
#404 - remodel (e) kitchen & replace (e) header beam & widen the (e) kitchen entrance. | $10,000 |
| Apr 13, 2015 | Never finaled issued Apr 2015, no final | 1234 Chestnut St | remodel 2 bathrooms & partial remodel of kitchen. to comply with cec150.0(k)3 & 5Details
remodel 2 bathrooms & partial remodel of kitchen. to comply with cec150.0(k)3 & 5 | $50,000 |
| Apr 2, 2015 | Completed final sign-off May 2016 | 318 Hill St | interior remodel. no expansion of building envelope. new windows doors on back and side facades. add 1/2 bath in e envelope. update e kitchen and e bath. new skylights and solartube. 60 sq ft of living space into former storage spaceDetails
interior remodel. no expansion of building envelope. new windows doors on back and side facades. add 1/2 bath in e envelope. update e kitchen and e bath. new skylights and solartube. 60 sq ft of living space into former storage space | $80,000 |
| Mar 10, 2015 | Completed final sign-off Aug 2015 | 885 Head St | revision to pa #201501155883 (kitchen & bath remodel) - bedroom closet remodel @ 1st floor, addition bath @ 2nd floor w/ dormers. replace garage & front door.Details
revision to pa #201501155883 (kitchen & bath remodel) - bedroom closet remodel @ 1st floor, addition bath @ 2nd floor w/ dormers. replace garage & front door. | $75,000 |
| Jan 15, 2015 | Completed final sign-off Jul 2015 | 885 Head St | remodel kitchen and 1 bathroom, no walls moved, removed or added. all layouts to remain unchanged.Details
remodel kitchen and 1 bathroom, no walls moved, removed or added. all layouts to remain unchanged. | $50,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2015 | 7 Cottage Rw | create opening from kitchen into living roomDetails
create opening from kitchen into living room | $5,000 |
| Aug 22, 2014 | Completed final sign-off Feb 2015 | 4706 25th St | remodel of an extg kitchen. no change to building envelope.Details
remodel of an extg kitchen. no change to building envelope. | $9,500 |
| Sep 16, 2008 | Completed final sign-off May 2009 | 3474 Clay St | remodel kitchen and new deck at rear yard.Details
remodel kitchen and new deck at rear yard. | $80,000 |
| Sep 11, 2008 | Completed final sign-off Feb 2009 | 1707 Powell St | demolition & ti for bar & restaurant. mitigation of barriers to access by person w/ disabilities including primary entry/exit & restrooms. exit path of travel, bar, restaurant & kitchen serice fisishes. separate plumbing & electrical permit to suit new work (design-build).Details
demolition & ti for bar & restaurant. mitigation of barriers to access by person w/ disabilities including primary entry/exit & restrooms. exit path of travel, bar, restaurant & kitchen serice fisishes. separate plumbing & electrical permit to suit new work (design-build). | $138,000 |
| Jun 6, 2008 | Completed final sign-off May 2009 | 3474 Clay St | remodel kitchen on main floor and master bath on 2nd floor.Details
remodel kitchen on main floor and master bath on 2nd floor. | $70,000 |
| Mar 12, 2008 | Never finaled issued Mar 2008, no final | 2971 Washington St | work @ unit# 2971 only. remodel 2 baths, 1 kitchen with new fixtures, tile, cabinets, and counters.Details
work @ unit# 2971 only. remodel 2 baths, 1 kitchen with new fixtures, tile, cabinets, and counters. | $70,000 |
| Jan 17, 2008 | Expired or cancelled expired Apr 2012 | 1395 Lyon St | remodel bath & kitchen in units 2 & 4. kitchen on 1st floor; baths on mezzanine level. replace appliances, fixtures, cabinets, floor finishes, electrical, plumbing.Details
remodel bath & kitchen in units 2 & 4. kitchen on 1st floor; baths on mezzanine level. replace appliances, fixtures, cabinets, floor finishes, electrical, plumbing. | $60,000 |
| May 15, 2007 | Completed final sign-off Mar 2008 | 56 Samoset St | remove wall between kitchen and dining rm,move wall between bath and bedroom.shear wall.move exterior door in garage. add window in garage. relocate window in downstairs bedroom. add exterior door to backyard. redo kitchen and both bathroomsDetails
remove wall between kitchen and dining rm,move wall between bath and bedroom.shear wall.move exterior door in garage. add window in garage. relocate window in downstairs bedroom. add exterior door to backyard. redo kitchen and both bathrooms | $180,000 |
| Aug 30, 2006 | Completed final sign-off May 2007 | 1395 Lyon St | replace kitchen, cabs, anc countertops, comply w/ complaint 200671841, (no plumbing, electrical required), replace windows and doors to match (e) all units, pour new concrete slab at back of units, new metal stairs as per plans kitchens #1,3,5 & 6, 8 windows and doorsDetails
replace kitchen, cabs, anc countertops, comply w/ complaint 200671841, (no plumbing, electrical required), replace windows and doors to match (e) all units, pour new concrete slab at back of units, new metal stairs as per plans kitchens #1,3,5 & 6, 8 windows and doors | $50,000 |