Block 0539, lot 020
2928 Steiner St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,402 sq ft
- Lot
- 3,075 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2023 | Completed final sign-off Oct 2023 | 2928 Steiner St | Cal-Quake Construction Inc | anchor exterior walls to (e) raised coundation w/simpson uffp/frfp foundation side plates or 5/8" extension @ 4ft intervals; secure floor joists with a35 simpson framing angles; brace cripple walls with 1/2 in sei plywood and 8d@ 4in nails. provide 5/8" typ x gyp bd for walls less than 5¿ from plDetails
anchor exterior walls to (e) raised coundation w/simpson uffp/frfp foundation side plates or 5/8" extension @ 4ft intervals; secure floor joists with a35 simpson framing angles; brace cripple walls with 1/2 in sei plywood and 8d@ 4in nails. provide 5/8" typ x gyp bd for walls less than 5¿ from pl | $8,450 |
| Mar 7, 2023 | Completed final sign-off Apr 2023 | 2928 Steiner St | Terence Mcmahon Construction | replace in kind of siding and trims around windows due to dry rot. not visible from the street.Details
replace in kind of siding and trims around windows due to dry rot. not visible from the street. | $9,600 |
| Oct 15, 2021 | Completed final sign-off Apr 2022 | 2928 Steiner St | Terence Mcmahon Construction | one kitchen remodel at main level, new plumbing and electrical fixtures, new stove, new back splash. one bathroom remodel at 2nd floor, new tile, new plumbing and electrical fixtures. replace one window in kind. u=.30 maxDetails
one kitchen remodel at main level, new plumbing and electrical fixtures, new stove, new back splash. one bathroom remodel at 2nd floor, new tile, new plumbing and electrical fixtures. replace one window in kind. u=.30 max | $91,500 |
| Nov 13, 2020 | Completed final sign-off May 2022 | 2928 Steiner St | Terence Mcmahon Construction | full kitchen remodel. no demolition of wall.Details
full kitchen remodel. no demolition of wall. | $43,000 |
| May 8, 2006 | Never finaled issued May 2006, no final | 2928 Steiner St | sidewalk repair permitDetails
sidewalk repair permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Terence Mcmahon Construction (3), Cal-Quake Construction Inc
- Authorized agent-otherss
- Jonathan O'connor
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.