Back to bathroom remodel contractors
Terence Mcmahon Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Jul 2026
- Last 24 months
- 56 permits filed
551 permits since 2000: 426 completed, 27 in progress, 74 never finaled, 24 expired or cancelled.
Of the 74 never-finaled permits, 14 are 3 to 5 years old, 36 are 5 to 10 years old, 24 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
116 bathroom remodel permits: 93 completed, 4 in progress, 12 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 180 days from permit to final inspection.
Showing the 100 most recent of 116.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2026 | Completed final sign-off Aug 2026 | 1475 Noe St | replace in kind 150 sq ft of tile on floor and walls of bathroom. new waterproofing for shower pan.Details
replace in kind 150 sq ft of tile on floor and walls of bathroom. new waterproofing for shower pan. | $12,000 |
| May 22, 2026 | In progress issued May 2026 | 1880 Steiner St | unit 310: kitchen remodel 85 sq ft, and bathroom remodel, 80 sq ft, guest bathroom 70 sq ft, new ceiling lights throughout home, electrical and plumbing updates as needed.Details
unit 310: kitchen remodel 85 sq ft, and bathroom remodel, 80 sq ft, guest bathroom 70 sq ft, new ceiling lights throughout home, electrical and plumbing updates as needed. | $85,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 390 27th Av | revision to pa #20250802671: renovate primary suite including bathroom & walk in closet. renovate main bathroom. replace in kind windows in primary bath, bedroom and main bath.Details
revision to pa #20250802671: renovate primary suite including bathroom & walk in closet. renovate main bathroom. replace in kind windows in primary bath, bedroom and main bath. | $82,000 |
| Sep 23, 2025 | Completed final sign-off Jan 2026 | 2820 Jackson St | bathroom remodel, replace in kind non-structural, no change to layout, bathroom approx 105 sq ft, like for like.Details
bathroom remodel, replace in kind non-structural, no change to layout, bathroom approx 105 sq ft, like for like. | $75,000 |
| Aug 8, 2025 | In progress issued Aug 2025 | 390 27th Av | kitchen remodel in kind on first floor. guest bathroom and master bathroom remodel in kind on second floor. no structural change to layout or framing. kitchen 190 sq ft. guest bathrooom 40 sq ft, master bathroom 80 sq ft.Details
kitchen remodel in kind on first floor. guest bathroom and master bathroom remodel in kind on second floor. no structural change to layout or framing. kitchen 190 sq ft. guest bathrooom 40 sq ft, master bathroom 80 sq ft. | $80,000 |
| Jul 18, 2025 | Completed final sign-off Jan 2026 | 1407 Cabrillo St | replace in kind, kitchen, full bath & powder room. non structural no change to layout. bathroom located on 2nd fl approx 100 sq ft. powder room located on first fl approx 25 sqftDetails
replace in kind, kitchen, full bath & powder room. non structural no change to layout. bathroom located on 2nd fl approx 100 sq ft. powder room located on first fl approx 25 sqft | $65,000 |
| Jun 3, 2025 | Completed final sign-off Sep 2025 | 212 Santa Paula Av | bathroom remodel located on second floor 90 sq ft. replace in kind structual. replace cabinets in kind playroom located on ground floor.Details
bathroom remodel located on second floor 90 sq ft. replace in kind structual. replace cabinets in kind playroom located on ground floor. | $50,000 |
| Feb 26, 2025 | Completed final sign-off Aug 2025 | 164 Lake Merced Hill St South St | bathroom and powder room remodel, non structural, no change to layout, new tile, plumbing, & electrical upgrades, new vanities, bathroom approx. 60 sq ft, powder room approx. 30 sq ft. no removal of wallsDetails
bathroom and powder room remodel, non structural, no change to layout, new tile, plumbing, & electrical upgrades, new vanities, bathroom approx. 60 sq ft, powder room approx. 30 sq ft. no removal of walls | $35,000 |
| Oct 4, 2024 | Completed final sign-off Apr 2025 | 3537 23rd St | rev 201901079729- 1st floor provide elevator machine room, 2nd and 3rd floor master bathroom reconfigure and laundry room. roof relocate retractable roof hatch.Details
rev 201901079729- 1st floor provide elevator machine room, 2nd and 3rd floor master bathroom reconfigure and laundry room. roof relocate retractable roof hatch. | $1,000 |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 3474 Clay St | bathroom remodel located on top fl. replace in kind approx 130 sq ft. no moving walls. all fixtures to remain in the same location.Details
bathroom remodel located on top fl. replace in kind approx 130 sq ft. no moving walls. all fixtures to remain in the same location. | $25,000 |
| Jul 15, 2024 | Completed final sign-off Jan 2025 | 1150 Lombard St | unit 3-remodel three bathrooms in kind, no change to layout non structural. new plumbing fixtures and fittings and electrical upgrades. new tile on floor and walls , 1 bathroom located on the first floor . 2 bathrooms located the second floor. each bathroom approx. 80 sq ftDetails
unit 3-remodel three bathrooms in kind, no change to layout non structural. new plumbing fixtures and fittings and electrical upgrades. new tile on floor and walls , 1 bathroom located on the first floor . 2 bathrooms located the second floor. each bathroom approx. 80 sq ft | $75,000 |
| Jun 5, 2024 | Completed final sign-off Feb 2025 | 2140 Great Hy | (1) kitchen and (1) bathroom remodel on 1st floor. replace in kind all new fixtures and fittings , electrical and plumbing upgrades. bathroom 80 sqft, kitchen 110 sqft.Details
(1) kitchen and (1) bathroom remodel on 1st floor. replace in kind all new fixtures and fittings , electrical and plumbing upgrades. bathroom 80 sqft, kitchen 110 sqft. | $40,000 |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 241 Montalvo Av | two bathroom remodel in kind. no change to layout non structural. new fixtures & fitting plumbing & electrical upgrades. master bath 160 sq ft. guest bathroom 60 sq ftDetails
two bathroom remodel in kind. no change to layout non structural. new fixtures & fitting plumbing & electrical upgrades. master bath 160 sq ft. guest bathroom 60 sq ft | $30,000 |
| May 3, 2024 | Completed final sign-off Oct 2024 | 627 Marina Bl | master bath room remodel located on 2nd fl. no change to layout non structural, new bathtub new marbel floors and walls, new fixtures and fittings approx 90 sq ft.Details
master bath room remodel located on 2nd fl. no change to layout non structural, new bathtub new marbel floors and walls, new fixtures and fittings approx 90 sq ft. | $35,000 |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 30 Liberty St | kitchen and bathroom remodel. non structural. in each unit. total 6 kitchens and 6 bathrooms. in kindDetails
kitchen and bathroom remodel. non structural. in each unit. total 6 kitchens and 6 bathrooms. in kind | $75,000 |
| Apr 12, 2024 | Completed final sign-off Jul 2025 | 3474 Clay St | powder room remodel no change to layout. located at 1st fl bathroom remodel no change to layout located on groiund floor- laundry remodel no change to layout located ground floor. all non structural. replace two winodws in kind at rear of house not visible from street.Details
powder room remodel no change to layout. located at 1st fl bathroom remodel no change to layout located on groiund floor- laundry remodel no change to layout located ground floor. all non structural. replace two winodws in kind at rear of house not visible from street. | $50,000 |
| Mar 25, 2024 | In progress issued Apr 2024 | 164 Lake Merced Hill St South St | interior only non structural remodel at 1st level only. addition of home office/gym, bathroom and patio furniture storage area. new interior doors, fixtures, finishes, venting. relocation of washer dryer, new window replacement at rear. no work at front facade. no work in prow.Details
interior only non structural remodel at 1st level only. addition of home office/gym, bathroom and patio furniture storage area. new interior doors, fixtures, finishes, venting. relocation of washer dryer, new window replacement at rear. no work at front facade. no work in prow. | $20,000 |
| Feb 15, 2024 | Completed final sign-off Oct 2024 | 111 Chestnut St | unit #605: kitchen and 2 bathrooms remodel. plumbing and electrical upgrades. all new fixtures and fittings.Details
unit #605: kitchen and 2 bathrooms remodel. plumbing and electrical upgrades. all new fixtures and fittings. | $150,000 |
| Dec 4, 2023 | Completed final sign-off Mar 2024 | 385 Castenada Av | legalize bathroom located at basement levelDetails
legalize bathroom located at basement level | $35,000 |
| Nov 13, 2023 | Completed final sign-off May 2024 | 1023 Oak St | repair water leak in bathroom to basement area, remove and replace tub/shower surrond only.Details
repair water leak in bathroom to basement area, remove and replace tub/shower surrond only. | $10,000 |
| Oct 18, 2023 | Completed final sign-off Jan 2024 | 115 Ortega St | remodel two bathroom's all new fixturs & fitting all new tile floors and walls, new vanity. one bathroom located on lower floor, one locate on main floor. no changes to the wall layout.Details
remodel two bathroom's all new fixturs & fitting all new tile floors and walls, new vanity. one bathroom located on lower floor, one locate on main floor. no changes to the wall layout. | $40,000 |
| Sep 13, 2023 | Completed final sign-off May 2024 | 1538 48th Av | apt #1: partial bathroom remodel (in-kind). re-tile shower walls around tub, re-tile floor, and swap out fixtures. toilet stays. vanity stays.Details
apt #1: partial bathroom remodel (in-kind). re-tile shower walls around tub, re-tile floor, and swap out fixtures. toilet stays. vanity stays. | $9,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 33 Pond St | master bathroom remodel also replacing main floor in house to tile. no sturctural work.Details
master bathroom remodel also replacing main floor in house to tile. no sturctural work. | $35,000 |
| Aug 22, 2023 | Completed final sign-off Dec 2023 | 240 Lombard St | unit # 929: bathroom remodel. non-structural. replacing shower fixtures, bathtub stays, replace toilet. new tile floor and tile wall. add new shower door. replace carpet in bedroom with wood. replace kitchen countertop.Details
unit # 929: bathroom remodel. non-structural. replacing shower fixtures, bathtub stays, replace toilet. new tile floor and tile wall. add new shower door. replace carpet in bedroom with wood. replace kitchen countertop. | $30,000 |
| Aug 17, 2023 | Completed final sign-off Jan 2025 | 4 Ashbury Tr | demolition of drywall of interior walls (demo permit). 2nd floor living room and bathroom.Details
demolition of drywall of interior walls (demo permit). 2nd floor living room and bathroom. | $20,000 |
| Jul 18, 2023 | Completed final sign-off Jan 2025 | 4 Ashbury Tr | int improvement. kitchen/bath remodel. new flooring/windows (not street visible) of existing. 2nd&3rd fl reconfiguration mep, struct, reinforcement @ basement lv. no excavation, no change to ext envelope, no facade work, no work in prow. (n) wdw on side, not street vis.Details
int improvement. kitchen/bath remodel. new flooring/windows (not street visible) of existing. 2nd&3rd fl reconfiguration mep, struct, reinforcement @ basement lv. no excavation, no change to ext envelope, no facade work, no work in prow. (n) wdw on side, not street vis. | $289,103 |
| May 16, 2023 | Completed final sign-off Aug 2023 | 2161 North Point St | top floor bathroom remodel, (n) plumbing & electrical fixtures, (n) tile, (n) sheetrock & paint. replace tile @ patio deck on top floor. all work is non structural. no wall/ framing modifications.Details
top floor bathroom remodel, (n) plumbing & electrical fixtures, (n) tile, (n) sheetrock & paint. replace tile @ patio deck on top floor. all work is non structural. no wall/ framing modifications. | $39,500 |
| May 11, 2023 | Completed final sign-off Jul 2023 | 300 Ivy St | unit 409 -partial bathroom remodel. new plumbing and electrical fixtures, new tile, new paint.Details
unit 409 -partial bathroom remodel. new plumbing and electrical fixtures, new tile, new paint. | $6,800 |
| Jan 17, 2023 | Completed final sign-off Feb 2023 | 2341 Franklin St | unit #3: replace extg bathtub at primary bathroom. new plumbing fixtures and new tile. build niche on wall. no moving walls.Details
unit #3: replace extg bathtub at primary bathroom. new plumbing fixtures and new tile. build niche on wall. no moving walls. | $14,200 |
| Oct 25, 2022 | Completed final sign-off Mar 2023 | 1443 16th Av | (1) kitchen, (1) bath and (1) powder room remodel, new electrical and plumbing fixtures, new tile, new stone and cabinets, no structural work involvedDetails
(1) kitchen, (1) bath and (1) powder room remodel, new electrical and plumbing fixtures, new tile, new stone and cabinets, no structural work involved | $105,000 |
| Aug 25, 2022 | Completed final sign-off Aug 2023 | 185 Edgewood Av | proposed project consist of 2 interior bathroom remodels and primary bedroom closet spaces. this includes the removal of non-structural walls, replacement walls, replacement of lighting adjustments to plumbing locations in the primary bathroom and replacement of fixture in th secondary bathroom.Details
proposed project consist of 2 interior bathroom remodels and primary bedroom closet spaces. this includes the removal of non-structural walls, replacement walls, replacement of lighting adjustments to plumbing locations in the primary bathroom and replacement of fixture in th secondary bathroom. | $73,800 |
| Aug 11, 2022 | Expired or cancelled expired Nov 2024 | 2566 Pine St | (unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep.Details
(unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep. | $85,000 |
| Jul 20, 2022 | Completed final sign-off Apr 2023 | 1721 Beach St | unit 1721: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms. unit 1723: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms.Details
unit 1721: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms. unit 1723: kitchen remodel. remove wall between breakfast room & kitchen. remodel 2 (e) bathrooms. | $30,000 |
| May 25, 2022 | Completed final sign-off Dec 2022 | 254 States St | 2 bathrooms remodel. electrical and plumbing fixture replacmenet. new tile, new vanity, new accessories. remodel in-kind, no layout change.Details
2 bathrooms remodel. electrical and plumbing fixture replacmenet. new tile, new vanity, new accessories. remodel in-kind, no layout change. | $27,000 |
| May 25, 2022 | Never finaled issued May 2022, no final | 246 Corbett Av | partial bathroom remodel: new accessories, new paint, new sheetrock and textures.Details
partial bathroom remodel: new accessories, new paint, new sheetrock and textures. | $19,000 |
| May 25, 2022 | Completed final sign-off Oct 2022 | 16 Vicksburg St | full bathroom remdoel, new tile, new vanity, new medicine cabinet, new accessories, new electrical. 3 plumbing fixtures. remodel in kind, no layout change.Details
full bathroom remdoel, new tile, new vanity, new medicine cabinet, new accessories, new electrical. 3 plumbing fixtures. remodel in kind, no layout change. | $31,500 |
| Mar 8, 2022 | Completed final sign-off Jul 2022 | 946 Oak St | kitchen and bathroom remodel at top floor of building. new tile, new plumbing, and electrical fixtures.Details
kitchen and bathroom remodel at top floor of building. new tile, new plumbing, and electrical fixtures. | $67,500 |
| Dec 22, 2021 | Completed final sign-off Nov 2022 | 20 Hernandez Av | full bathroom remodel on 3rd floor.Details
full bathroom remodel on 3rd floor. | $48,700 |
| Oct 15, 2021 | Completed final sign-off Apr 2022 | 2928 Steiner St | one kitchen remodel at main level, new plumbing and electrical fixtures, new stove, new back splash. one bathroom remodel at 2nd floor, new tile, new plumbing and electrical fixtures. replace one window in kind. u=.30 maxDetails
one kitchen remodel at main level, new plumbing and electrical fixtures, new stove, new back splash. one bathroom remodel at 2nd floor, new tile, new plumbing and electrical fixtures. replace one window in kind. u=.30 max | $91,500 |
| Oct 13, 2021 | Completed final sign-off Apr 2022 | 212 Santa Paula Av | complete bathroom remodel, new plumbing and electrical fixtures, new tile.Details
complete bathroom remodel, new plumbing and electrical fixtures, new tile. | $47,300 |
| Sep 28, 2021 | Completed final sign-off Jun 2022 | 2131 Pierce St | apt #1: 1 kitchen and 1 bathroom remodel. replace 3 windows and 1 door (all not facing st) non structural work. u-factor less than or equal to 0.30Details
apt #1: 1 kitchen and 1 bathroom remodel. replace 3 windows and 1 door (all not facing st) non structural work. u-factor less than or equal to 0.30 | $107,000 |
| Sep 10, 2021 | Completed final sign-off Dec 2021 | 2 Lapham Wy | complete bathroom & kitchen remodel. install new tile, countertops, new electrical & plumbing fixtures. new layout. but kitchen appliances are not to be replaced.Details
complete bathroom & kitchen remodel. install new tile, countertops, new electrical & plumbing fixtures. new layout. but kitchen appliances are not to be replaced. | $49,800 |
| Jun 16, 2021 | Completed final sign-off Dec 2021 | 75 Clipper St | bathroom & kitchen remodel. all fixture locations to remain unchanged. no walls moveDetails
bathroom & kitchen remodel. all fixture locations to remain unchanged. no walls move | $20,000 |
| Jun 16, 2021 | Completed final sign-off Jan 2022 | 1910 Greenwich St | unit 8 - 2 bathrooms, kitchen, living room, 2 bathrooms & flooring replacement in hallway; new tile in both baths. new paint, new trims & baseboards. replace in kind 2 windows (not facing street)Details
unit 8 - 2 bathrooms, kitchen, living room, 2 bathrooms & flooring replacement in hallway; new tile in both baths. new paint, new trims & baseboards. replace in kind 2 windows (not facing street) | $48,500 |
| May 25, 2021 | Completed final sign-off Sep 2022 | 25 Anzavista Av | remodel 2 bathrooms in -kind. no structural .Details
remodel 2 bathrooms in -kind. no structural . | $44,000 |
| May 21, 2021 | Completed final sign-off Dec 2021 | 33 Pond St | kitchen & bathroom remode. no structural work. no moving walls.Details
kitchen & bathroom remode. no structural work. no moving walls. | $68,000 |
| May 5, 2021 | Completed final sign-off Oct 2021 | 33 Pond St | kitchen and master bathroom remodel. no structural work.Details
kitchen and master bathroom remodel. no structural work. | $85,000 |
| Apr 6, 2021 | Never finaled issued Apr 2021, no final | 1020 Vallejo St | unit 1 - kitchen, bathroom, powder, and pantry room remodel. no structural work. no fire sprinklers or fire alarm modification.Details
unit 1 - kitchen, bathroom, powder, and pantry room remodel. no structural work. no fire sprinklers or fire alarm modification. | $50,000 |
| Mar 3, 2021 | Expired or cancelled cancelled Jul 2022 | 529 43rd Av | full bathroom remodel. no walls to be moved or altered.Details
full bathroom remodel. no walls to be moved or altered. | $18,000 |
| Feb 12, 2021 | Completed final sign-off Jun 2021 | 2125 Bryant St | top unit: master bath and powder room remodel. no structural work.,Details
top unit: master bath and powder room remodel. no structural work., | $36,000 |
| Feb 12, 2021 | Completed final sign-off May 2021 | 120 Arguello Bl | top unit: master bath and powder room remodel. no structural work.,Details
top unit: master bath and powder room remodel. no structural work., | $48,000 |
| Feb 4, 2021 | Completed final sign-off Apr 2021 | 1425 Golden Gate Av | bathroom remodel at 1st flr lower unitDetails
bathroom remodel at 1st flr lower unit | $25,000 |
| Dec 4, 2020 | Completed final sign-off Aug 2021 | 2933 Broderick St | remodel 2 bathrooms, on ground level and 1st floor. new hardwood floor through out. no layout change.Details
remodel 2 bathrooms, on ground level and 1st floor. new hardwood floor through out. no layout change. | $115,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2021 | 461 02nd St | #c135: full bathroom remodel in kind on ground floor.Details
#c135: full bathroom remodel in kind on ground floor. | $17,000 |
| Nov 13, 2020 | Completed final sign-off May 2021 | 120 Arguello Bl | full remodel of kids bathroom on 3/f. no demo of wall.Details
full remodel of kids bathroom on 3/f. no demo of wall. | $35,000 |
| Oct 28, 2020 | Expired or cancelled cancelled Jan 2026 | 701 Scott St | demo dividing walls in basement cracking proposed room. new floor remodel on 2nd level. new laundry and bath on 3rd level. new bedroom and bath remodel on 4th level.Details
demo dividing walls in basement cracking proposed room. new floor remodel on 2nd level. new laundry and bath on 3rd level. new bedroom and bath remodel on 4th level. | $180,000 |
| Sep 30, 2020 | Completed final sign-off Jun 2021 | 106 Stanyan St | bathroom remodel; replace fixtures and finishes in kind; no structural work.Details
bathroom remodel; replace fixtures and finishes in kind; no structural work. | $25,000 |
| Aug 19, 2020 | Completed final sign-off Jun 2021 | 106 Stanyan St | structural improvements and finish upgrades to an existing unit in a duplex located at 106 stanyan st. improvements include full remodel of master bathroom, fixture changes to guest bath, new kitchen cabinets, and appliances, move existing kitchen wall, patch flooring.Details
structural improvements and finish upgrades to an existing unit in a duplex located at 106 stanyan st. improvements include full remodel of master bathroom, fixture changes to guest bath, new kitchen cabinets, and appliances, move existing kitchen wall, patch flooring. | $33,000 |
| Jul 17, 2020 | Completed final sign-off Nov 2020 | 2130 Filbert St | remodeling 3 bathrooms in kind, fixtures & finishes replacement. no structural work & no changes to wall layout.**maher n/a**Details
remodeling 3 bathrooms in kind, fixtures & finishes replacement. no structural work & no changes to wall layout.**maher n/a** | $39,000 |
| May 27, 2020 | Completed final sign-off Dec 2021 | 2090 Vallejo St | remodel 2 bathrooms on top floor; replace fixtures and finishes in kindDetails
remodel 2 bathrooms on top floor; replace fixtures and finishes in kind | $70,000 |
| Feb 18, 2020 | Completed final sign-off Jul 2025 | 1364 Union St | add new clerestory sawtooth above extg entry, relocate extg skylight. partial remodel at extg kitchen. remodel extg guest and master bathroom. replace extg furnace.Details
add new clerestory sawtooth above extg entry, relocate extg skylight. partial remodel at extg kitchen. remodel extg guest and master bathroom. replace extg furnace. | $300,000 |
| Jan 3, 2020 | Expired or cancelled cancelled Jan 2020 | 1882 Church St | remodel kitchen and bathroom in kind. replace fixtures and finishes, cabinets, include lighting.Details
remodel kitchen and bathroom in kind. replace fixtures and finishes, cabinets, include lighting. | $82,000 |
| Nov 8, 2019 | Completed final sign-off May 2020 | 527 43rd Av | bathroom remodel. no structural workDetails
bathroom remodel. no structural work | $27,000 |
| Nov 8, 2019 | Completed final sign-off May 2020 | 49 Seacliff Av | patrial shower/bath remodel. no structural workDetails
patrial shower/bath remodel. no structural work | $25,000 |
| Oct 3, 2019 | Completed final sign-off Dec 2021 | 2090 Vallejo St | remodel bathroom in kind. fixtures and finishes replacement 120 sq ft. no structural work.Details
remodel bathroom in kind. fixtures and finishes replacement 120 sq ft. no structural work. | $45,000 |
| Oct 3, 2019 | Completed final sign-off May 2020 | 47 Harrington St | remodel bathroom in kind, fixtures and finishes replacement. no structural work no changes to wall layour 100 sfDetails
remodel bathroom in kind, fixtures and finishes replacement. no structural work no changes to wall layour 100 sf | $32,000 |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 32 Marne Av | new interior vertical lift and shaft. remodel of an existing second floor bathroom into an accessible bathroom with roll-in shower. new exterior door to rear yard and a new 18" high wood deck and wood rampDetails
new interior vertical lift and shaft. remodel of an existing second floor bathroom into an accessible bathroom with roll-in shower. new exterior door to rear yard and a new 18" high wood deck and wood ramp | $96,000 |
| Aug 29, 2019 | Completed final sign-off Jul 2021 | 2721 Bush St | relocate & demo walls, new bedroom, add header and post, relocate bathroom fixtures, new shower.Details
relocate & demo walls, new bedroom, add header and post, relocate bathroom fixtures, new shower. | $30,000 |
| Aug 13, 2019 | Completed final sign-off Dec 2019 | 2442 Francisco St | remodel one bathroom in kind, fixtuer replacement. remodel one powder room in kind, fixture replacement. remodel kitchen, remove wall between kitchen and dinning room.Details
remodel one bathroom in kind, fixtuer replacement. remodel one powder room in kind, fixture replacement. remodel kitchen, remove wall between kitchen and dinning room. | $73,000 |
| Jul 12, 2019 | Never finaled issued Jul 2019, no final | 1585 16th Av | remodel 1 bathroom: replace fixturs and finishes.Details
remodel 1 bathroom: replace fixturs and finishes. | $25,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 2542 44th Av | to comply with nov 201937549 to legalize lower floor bathroom - full bathDetails
to comply with nov 201937549 to legalize lower floor bathroom - full bath | $8,000 |
| May 20, 2019 | Completed final sign-off Sep 2019 | 2467 40th Av | bath remodel - replace fixtures & finishes in kind. partial kitchen, replace cabinets, counter tops.Details
bath remodel - replace fixtures & finishes in kind. partial kitchen, replace cabinets, counter tops. | $58,000 |
| Feb 27, 2019 | Completed final sign-off Apr 2019 | 185 Edgewood Av | kitchen and 1/2 bath remodel: replace refrigerator, wall oves, hood, wine fridge, backsplash/counters, gfci's, non-led recessed to led, add of (n) light fixtures, (n) door interior, re-vamp non-led fixtures, (n) millwork.Details
kitchen and 1/2 bath remodel: replace refrigerator, wall oves, hood, wine fridge, backsplash/counters, gfci's, non-led recessed to led, add of (n) light fixtures, (n) door interior, re-vamp non-led fixtures, (n) millwork. | |
| Jan 30, 2019 | Completed final sign-off Sep 2019 | 176 Diamond St | revision to 201810163300, change interior stair location. reconfgure bath and kitchen, expand down into storage space for new master suite to inlcude 1 bedrm, full bath, laundry area. replace e deck finishes less than50%. facade windows and materials in kind. 620 sq ft at lower level.Details
revision to 201810163300, change interior stair location. reconfgure bath and kitchen, expand down into storage space for new master suite to inlcude 1 bedrm, full bath, laundry area. replace e deck finishes less than50%. facade windows and materials in kind. 620 sq ft at lower level. | $125,000 |
| Dec 14, 2018 | Completed final sign-off May 2019 | 17 Fortuna Av | interior renovation & reconfiguring of the (e) bath & bedroom closets to create 2 separate baths, new closets at bedrooms, & addition of washer dryer in (e) kitchenDetails
interior renovation & reconfiguring of the (e) bath & bedroom closets to create 2 separate baths, new closets at bedrooms, & addition of washer dryer in (e) kitchen | $25,000 |
| Oct 16, 2018 | Completed final sign-off Feb 2020 | 176 Diamond St | expand (e) 3rd fl. via doormers, reconfigure bedroom, closets, relocate bathroom from 2nd floor to this floor. reconfigure kitchen on 2nd fl. add home office spaces, reconfigure stair between all 3 levelsDetails
expand (e) 3rd fl. via doormers, reconfigure bedroom, closets, relocate bathroom from 2nd floor to this floor. reconfigure kitchen on 2nd fl. add home office spaces, reconfigure stair between all 3 levels | $125,000 |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 2566 Pine St | 1 bath remodel, replace fixtures and finishes in kindDetails
1 bath remodel, replace fixtures and finishes in kind | $14,490 |
| Aug 16, 2018 | Completed final sign-off Feb 2019 | 170 Pacific Av | bathroom remodel. fixts & finishes only in unit #24/ replace in same location 11'x6'. n/a for maher.Details
bathroom remodel. fixts & finishes only in unit #24/ replace in same location 11'x6'. n/a for maher. | $35,000 |
| Aug 10, 2018 | Completed final sign-off Jun 2019 | 190 Escolta Wy | 1/fl: construct new bedroom, one new bathroom, relocate half toilet, remodel (e) family, & new media room. 2/f: remodel (e) bathroom & kitchen and new skylights.Details
1/fl: construct new bedroom, one new bathroom, relocate half toilet, remodel (e) family, & new media room. 2/f: remodel (e) bathroom & kitchen and new skylights. | $90,000 |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 2566 Pine St | bathroom remode replace fixtures and finishes onlyDetails
bathroom remode replace fixtures and finishes only | $32,000 |
| Jun 12, 2018 | Completed final sign-off Sep 2018 | 655 21st Av | remodel bathroom and kitchen; cabinetry, fixtures & finishes replacement, electrical & plumbing under seperate permitDetails
remodel bathroom and kitchen; cabinetry, fixtures & finishes replacement, electrical & plumbing under seperate permit | $96,000 |
| Jun 6, 2018 | Never finaled issued Jun 2018, no final | 2566 Pine St | bathroom remodel on second storey. fixtures and finishes only.Details
bathroom remodel on second storey. fixtures and finishes only. | $35,000 |
| Jan 16, 2018 | Completed final sign-off May 2018 | 108 Alpine Tr | bathroom remodel, dry rot repair at side of building; replace stucco in kind (60 sf)Details
bathroom remodel, dry rot repair at side of building; replace stucco in kind (60 sf) | $9,000 |
| Oct 19, 2017 | Completed final sign-off Oct 2022 | 880 Waller St | rear expansion under extg deck. main level expansion in rear. new bath, multipurpose room and enlarged kitchen. new rear windows and doors. extg decks to be repaired.Details
rear expansion under extg deck. main level expansion in rear. new bath, multipurpose room and enlarged kitchen. new rear windows and doors. extg decks to be repaired. | $60,000 |
| Oct 10, 2017 | Expired or cancelled expired Apr 2025 | 347 05th Av | convert a duplex to a 3-unit residiential bldg. add (2) bedrooms & (2) bath @ 2nd fl, add (2) bed & (3) bath @ 3fl, add (2) bedrm & (3) bath @ 4th fl. mech, plumbing, elec under separate permit.Details
convert a duplex to a 3-unit residiential bldg. add (2) bedrooms & (2) bath @ 2nd fl, add (2) bed & (3) bath @ 3fl, add (2) bedrm & (3) bath @ 4th fl. mech, plumbing, elec under separate permit. | $700,000 |
| Jul 18, 2017 | Never finaled issued Feb 2019, no final | 1639 North Point St | horizontal addition. remodel rear portion of the (e) building. add 1 new bedroom to the 1st floor. add 1 new bedroom & one new bathroom to the 3rd floor. ** maher: n/a **Details
horizontal addition. remodel rear portion of the (e) building. add 1 new bedroom to the 1st floor. add 1 new bedroom & one new bathroom to the 3rd floor. ** maher: n/a ** | $30,000 |
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 510 Oak St | remodel kitchen w/new cabinets + counters. remodel (partial) bathroom, replace tub + tile surround only. no walls moved, removed, added or infilled. all exisitng layouts to remain unchanged.Details
remodel kitchen w/new cabinets + counters. remodel (partial) bathroom, replace tub + tile surround only. no walls moved, removed, added or infilled. all exisitng layouts to remain unchanged. | $40,000 |
| Apr 7, 2017 | Completed final sign-off Oct 2017 | 2367 Francisco St | remove and replace 4 (e) windows, in kind. 2 in bedroom at rear of building; (1) one in bathroom + (1) one in kitchen. non visible from the street.Details
remove and replace 4 (e) windows, in kind. 2 in bedroom at rear of building; (1) one in bathroom + (1) one in kitchen. non visible from the street. | $4,000 |
| Mar 31, 2017 | Expired or cancelled cancelled May 2017 | 2365 Francisco St | remove & replace 4 existing windows in-kind. 2 in bedroom at rear of building & one in bathroom not visible from street. one in kitchen not visible from street. n/a for maher.Details
remove & replace 4 existing windows in-kind. 2 in bedroom at rear of building & one in bathroom not visible from street. one in kitchen not visible from street. n/a for maher. | $4,000 |
| Jan 23, 2017 | Completed final sign-off Oct 2017 | 2365 Francisco St | replace insulation, sheetrock and trim to match existing. replace kitchen cabinets and countertops removed during demo. replace tile, tub & fixtures in bathroom and powder room.Details
replace insulation, sheetrock and trim to match existing. replace kitchen cabinets and countertops removed during demo. replace tile, tub & fixtures in bathroom and powder room. | $35,000 |
| Nov 17, 2016 | Completed final sign-off Jul 2024 | 735 Clementina St | legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinanceDetails
legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinance | $187,000 |
| Nov 7, 2016 | Completed final sign-off Oct 2017 | 35 Bemis St | new office @ unit #1 and new bathroom @ unit #1. max excavation = 5 cubic feet. max dept = 3'0"Details
new office @ unit #1 and new bathroom @ unit #1. max excavation = 5 cubic feet. max dept = 3'0" | $37,000 |
| Nov 1, 2016 | Completed final sign-off Jul 2017 | 1150 Lombard St | unit 38 - kitchen & bathroom int remodel. demo (e) kitchen cabinets, ma bath cabinets, doorway from dining to kitchen. wider doorway form dining to ktichen, new wall in maste shower, new doorway into master closet 2, fill-in doorway from study to master bedroom, refinish (e) flrs, recessed lighting.Details
unit 38 - kitchen & bathroom int remodel. demo (e) kitchen cabinets, ma bath cabinets, doorway from dining to kitchen. wider doorway form dining to ktichen, new wall in maste shower, new doorway into master closet 2, fill-in doorway from study to master bedroom, refinish (e) flrs, recessed lighting. | $90,000 |
| Oct 4, 2016 | Completed final sign-off Apr 2017 | 655 Victoria St | rev. to foundation pa#201605137459, develop g/f accessory rooms to include 1 master suite, 1 bedroom & 2 baths. interior remodel, new interior finishes, update baths, kitchen, heating system, hotwater, plumbing, electrical, roof, replace windows in kind. no footprint increase.Details
rev. to foundation pa#201605137459, develop g/f accessory rooms to include 1 master suite, 1 bedroom & 2 baths. interior remodel, new interior finishes, update baths, kitchen, heating system, hotwater, plumbing, electrical, roof, replace windows in kind. no footprint increase. | $68,000 |
| Aug 16, 2016 | Completed final sign-off Apr 2018 | 247 Saint Charles Av | install new interior spiral staircase from 1st to lower level. remove (e) staircase. remove knob & tube wiring and replace with new wiring. add full bathroom on lower levelDetails
install new interior spiral staircase from 1st to lower level. remove (e) staircase. remove knob & tube wiring and replace with new wiring. add full bathroom on lower level | $16,000 |
| Jun 23, 2016 | Completed final sign-off Nov 2016 | 880 Waller St | kitchen updates, reconfiguration of interior walls, relocation of powder room, new lighting, new furnace, update/remodel of upper level kid's bath, and new master bath. no envelop increase/decrease. extg baths 1.5 proposed to be 2.5Details
kitchen updates, reconfiguration of interior walls, relocation of powder room, new lighting, new furnace, update/remodel of upper level kid's bath, and new master bath. no envelop increase/decrease. extg baths 1.5 proposed to be 2.5 | $300,000 |
| Jun 8, 2016 | Completed final sign-off Nov 2021 | 630 Rhode Island St | front bldg: divide open plan top floor into rooms with partition walls. no kithcen or bath remodel.Details
front bldg: divide open plan top floor into rooms with partition walls. no kithcen or bath remodel. | $30,000 |
| Mar 21, 2016 | Completed final sign-off Apr 2016 | 3059 Washington St | partial bathroom remodel to repair after floodDetails
partial bathroom remodel to repair after flood | $12,000 |
| Aug 20, 2015 | Completed final sign-off Dec 2015 | 1150 Lombard St | unit 6, bathroom remodel including replacement of all fixtures and upgrade of all electrical fixtures, electrical upgrade in both bedrooms including new smoke detector and carbon monoxide detector in hallwaysDetails
unit 6, bathroom remodel including replacement of all fixtures and upgrade of all electrical fixtures, electrical upgrade in both bedrooms including new smoke detector and carbon monoxide detector in hallways | $45,000 |
| Jul 6, 2015 | Completed final sign-off Oct 2015 | 95 Midcrest Wy | remodel bathroom on ground floor.Details
remodel bathroom on ground floor. | $10,000 |