Block 3564, lot 139
33 Pond St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,224 sq ft
- Lot
- 1,716 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2023 | Completed final sign-off Dec 2023 | 33 Pond St | Terence Mcmahon Construction | dry rot repair on rear of house, not visible from street, replace in kind. siding and trims approx 200 sq ft.Details
dry rot repair on rear of house, not visible from street, replace in kind. siding and trims approx 200 sq ft. | $15,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 33 Pond St | Terence Mcmahon Construction | master bathroom remodel also replacing main floor in house to tile. no sturctural work.Details
master bathroom remodel also replacing main floor in house to tile. no sturctural work. | $35,000 |
| May 21, 2021 | Completed final sign-off Dec 2021 | 33 Pond St | Terence Mcmahon Construction | kitchen & bathroom remode. no structural work. no moving walls.Details
kitchen & bathroom remode. no structural work. no moving walls. | $68,000 |
| May 21, 2021 | Completed final sign-off Oct 2021 | 33 Pond St | Terence Mcmahon Construction | repair approx less than 50% of existing deck at rear. no changes.Details
repair approx less than 50% of existing deck at rear. no changes. | $15,000 |
| May 5, 2021 | Completed final sign-off Oct 2021 | 33 Pond St | Terence Mcmahon Construction | kitchen and master bathroom remodel. no structural work.Details
kitchen and master bathroom remodel. no structural work. | $85,000 |
| Jul 23, 2012 | Completed final sign-off Aug 2012 | 33 Pond St | Simon And Simon Construction | remove sink, clawfoot tub & closet doors & wall next to (e) bathroom. remove wainscotting & (e) lighting & mirror fixtures, replace with shower & double vanity sink. add toilet, close off window in closet. tile floor & shower & add 2 medicine cabinets & fixtures.Details
remove sink, clawfoot tub & closet doors & wall next to (e) bathroom. remove wainscotting & (e) lighting & mirror fixtures, replace with shower & double vanity sink. add toilet, close off window in closet. tile floor & shower & add 2 medicine cabinets & fixtures. | $16,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Terence Mcmahon Construction (5), Simon And Simon Construction
- Authorized agent-otherss
- David Goldrick
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.