Teevan Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2025
- Last 24 months
- 3 permits filed
154 permits since 2000: 136 completed, 2 in progress, 7 never finaled, 9 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 10 completed. Typically 1 days from filing to permit and 289 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2023 | Completed final sign-off Apr 2024 | 145 El Verano Wy | remodel bathroom. 1st floor- convert extg tub in a shower. no changes to floor plan or walls. replace 3 windows in the same opening not visble from the street. 2 in bathrooms & 1 at staircase on left side of the bldg. uf 0.3 max.Details
remodel bathroom. 1st floor- convert extg tub in a shower. no changes to floor plan or walls. replace 3 windows in the same opening not visble from the street. 2 in bathrooms & 1 at staircase on left side of the bldg. uf 0.3 max. | $20,000 |
| May 12, 2020 | Completed final sign-off Apr 2021 | 249 Fair Oaks St | repair/replace dry rot at existing rear stairs (stringers, treads, & risers) in kind.Details
repair/replace dry rot at existing rear stairs (stringers, treads, & risers) in kind. | $10,000 |
| Jul 6, 2015 | Completed final sign-off Mar 2017 | 2516 23rd Av | replace wooden try stair in kind & handrails in kind. no work inside or to exterior of house.Details
replace wooden try stair in kind & handrails in kind. no work inside or to exterior of house. | $25,000 |
| Mar 10, 2015 | Completed final sign-off Jan 2016 | 746 39th Av | revision to appl #2014.1218.4007: addition of horizontal straps at top and bottom of front windows. repair (e) terrazo entry stairs. repair off damaged wood entry wall and construct new supporting foundation.Details
revision to appl #2014.1218.4007: addition of horizontal straps at top and bottom of front windows. repair (e) terrazo entry stairs. repair off damaged wood entry wall and construct new supporting foundation. | $25,000 |
| Apr 6, 2009 | Completed final sign-off Feb 2010 | 158 27th Av | revision to app #200903164172, change in wall thickness to post from 3/8" to 3/16". change in top rail thickness from 1/4 to 3/8". change in steel plate detail at parapet plates. do no need to be welded together if they each have 10 bolts minimum. stair handrail switched from one side to the otherDetails
revision to app #200903164172, change in wall thickness to post from 3/8" to 3/16". change in top rail thickness from 1/4 to 3/8". change in steel plate detail at parapet plates. do no need to be welded together if they each have 10 bolts minimum. stair handrail switched from one side to the other | |
| Dec 8, 2008 | Completed final sign-off Feb 2010 | 158 27th Av | replace existing nonconforming guardrails w/ new 42" conforming railings, add code compliant stair hand rail on roof stair.Details
replace existing nonconforming guardrails w/ new 42" conforming railings, add code compliant stair hand rail on roof stair. | $16,000 |
| Sep 19, 2008 | Completed final sign-off Nov 2009 | 158 27th Av | replace existing wood stair at rear including new foundation and property line 1 hr guardwall. new property line fence at rear including new 2' a/grade retaining wall.Details
replace existing wood stair at rear including new foundation and property line 1 hr guardwall. new property line fence at rear including new 2' a/grade retaining wall. | $8,000 |
| Aug 11, 2008 | Completed final sign-off Jan 2009 | 159 Miraloma Dr | replace 5 windows same size - 2 in front, 3 in back,(1 at master bedroom, 1 at stairway, 1 at bedroom #2 & 2 at office study). new windows will be weather shield clad dbl pane replaced in kind.Details
replace 5 windows same size - 2 in front, 3 in back,(1 at master bedroom, 1 at stairway, 1 at bedroom #2 & 2 at office study). new windows will be weather shield clad dbl pane replaced in kind. | $12,000 |
| May 4, 2007 | Completed final sign-off Feb 2008 | 201 11th St | repairs to be performed in the basement concrete wall corner 11th street with howard street. fill in three windows at 11th street. replace one window at howard street. remove (e) damaged concrete clean steel. re-install the concrete. replace new door main entrance, install railings at 2nd exit stairDetails
repairs to be performed in the basement concrete wall corner 11th street with howard street. fill in three windows at 11th street. replace one window at howard street. remove (e) damaged concrete clean steel. re-install the concrete. replace new door main entrance, install railings at 2nd exit stair | $20,000 |
| Jul 24, 2001 | Completed final sign-off Aug 2002 | 844 Green St | install beam in kitchen, provide fire door @ stair, install new shower, modify bathrm & 2 kitchenDetails
install beam in kitchen, provide fire door @ stair, install new shower, modify bathrm & 2 kitchen | $25,000 |