Back to bathroom remodel contractors
Teevan Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2025
- Last 24 months
- 3 permits filed
154 permits since 2000: 136 completed, 2 in progress, 7 never finaled, 9 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 26 completed, 2 in progress, 4 never finaled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2025 | In progress issued Apr 2025 | 200 Brannan St | unit 232-kitchen and (3) bathrooms remodel. update all surfaces, remove closets, partition walls, install pocket doors, cabinets, countertops, appliances and lighting.Details
unit 232-kitchen and (3) bathrooms remodel. update all surfaces, remove closets, partition walls, install pocket doors, cabinets, countertops, appliances and lighting. | $210,000 |
| Apr 1, 2025 | In progress issued Apr 2025 | 2046 Jefferson St | in kind renovation following a flood. (3) existing bathrooms. remodel as a result of water damaged related to broken toilet from unit above.Details
in kind renovation following a flood. (3) existing bathrooms. remodel as a result of water damaged related to broken toilet from unit above. | $120,000 |
| Jun 26, 2024 | Completed final sign-off Oct 2024 | 3779 Clay St | 1 bathroom renovation 2nd floor, convert (e) tub in a shower. no changes to floor plan or wallsDetails
1 bathroom renovation 2nd floor, convert (e) tub in a shower. no changes to floor plan or walls | $20,000 |
| Aug 28, 2023 | Completed final sign-off Jan 2024 | 1624 Filbert St | remodel bathroom. no changes to floor plan or walls. all fixture at same location.Details
remodel bathroom. no changes to floor plan or walls. all fixture at same location. | $25,000 |
| Aug 28, 2023 | Completed final sign-off Apr 2024 | 145 El Verano Wy | remodel bathroom. 1st floor- convert extg tub in a shower. no changes to floor plan or walls. replace 3 windows in the same opening not visble from the street. 2 in bathrooms & 1 at staircase on left side of the bldg. uf 0.3 max.Details
remodel bathroom. 1st floor- convert extg tub in a shower. no changes to floor plan or walls. replace 3 windows in the same opening not visble from the street. 2 in bathrooms & 1 at staircase on left side of the bldg. uf 0.3 max. | $20,000 |
| Jun 15, 2022 | Completed final sign-off Aug 2022 | 32 06th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $15,000 |
| May 14, 2021 | Completed final sign-off Nov 2021 | 2260 Vallejo St | unit 2: no new wall & no existing wall relocation. remodel in kind kitchen, master bath and guest bathroom. no changes to floor plan or walls. install/replace appliances, fixtures, cabinets, countertops and lights. new lighting shall comply with cec 150.0 (k)3 & (k)5Details
unit 2: no new wall & no existing wall relocation. remodel in kind kitchen, master bath and guest bathroom. no changes to floor plan or walls. install/replace appliances, fixtures, cabinets, countertops and lights. new lighting shall comply with cec 150.0 (k)3 & (k)5 | $40,000 |
| Jan 5, 2021 | Completed final sign-off May 2021 | 755 Capp St | in kind remodeling bathroom. new fixtures approx same location, new tiles, new lighting, & new vanity.Details
in kind remodeling bathroom. new fixtures approx same location, new tiles, new lighting, & new vanity. | $24,000 |
| Mar 6, 2019 | Completed final sign-off Sep 2019 | 88 King St | unit # 1317 -guest bathroom remodel - demo (e) floor tub and surround, frame for new shower and shower curb. master bathroom remodel - demo (e) floor and install tile install new floor and new wall tileDetails
unit # 1317 -guest bathroom remodel - demo (e) floor tub and surround, frame for new shower and shower curb. master bathroom remodel - demo (e) floor and install tile install new floor and new wall tile | $10,000 |
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 2218 Clay St | remodel master bedroom abd vestibule. install new wall in (e) closet. relocate and add ele outlets, add recessed light fixtures, (n) cabintry at closet and vestibule, replace (e) shower valve rough at master bath shower onlyDetails
remodel master bedroom abd vestibule. install new wall in (e) closet. relocate and add ele outlets, add recessed light fixtures, (n) cabintry at closet and vestibule, replace (e) shower valve rough at master bath shower only | $10,000 |
| Jan 3, 2018 | Completed final sign-off Mar 2018 | 4033 23rd St | remodel 2nd fl bathroom: replace vanity, fixtures, tile shower surround, lighting and receptacles.Details
remodel 2nd fl bathroom: replace vanity, fixtures, tile shower surround, lighting and receptacles. | $20,000 |
| Oct 8, 2015 | Completed final sign-off May 2016 | 3555 Clay St | remodel 2nd floor bathroom and bdroomDetails
remodel 2nd floor bathroom and bdroom | $65,000 |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 456 Hazelwood Av | remodeling master bath @ upper floor, no structural work. replacement of venting for washer/floor drain. replace 4" vertical sewer lateral.Details
remodeling master bath @ upper floor, no structural work. replacement of venting for washer/floor drain. replace 4" vertical sewer lateral. | $16,000 |
| Jun 10, 2015 | Completed final sign-off Nov 2015 | 184 Collins St | 1st floor - no change on walls. remodeling (e) kitchen and powder room. all new appliances and fixtures install at same location. install new cabinets at study room. second floor: remodeling master bathroom - all fixtures same location.Details
1st floor - no change on walls. remodeling (e) kitchen and powder room. all new appliances and fixtures install at same location. install new cabinets at study room. second floor: remodeling master bathroom - all fixtures same location. | $88,000 |
| Jan 6, 2015 | Completed final sign-off May 2015 | 2648 Union St | remodeling master bathroom at 2nd floor. remove (e) tub and install shower at tub location. remove (e) and install new vanity, sink, toilet and accessories at same location.Details
remodeling master bathroom at 2nd floor. remove (e) tub and install shower at tub location. remove (e) and install new vanity, sink, toilet and accessories at same location. | $10,000 |
| Jan 11, 2013 | Completed final sign-off Oct 2013 | 3760 Webster St | remodel (e) master bathroom and relocate (e) laundry at 2nd floorDetails
remodel (e) master bathroom and relocate (e) laundry at 2nd floor | $30,000 |
| Oct 12, 2012 | Never finaled issued Oct 2012, no final | 1679 27th Av | remodel 44 sq ft basement space into new bathroom. re-arrange (e) laundry area & add laundry cabinetsDetails
remodel 44 sq ft basement space into new bathroom. re-arrange (e) laundry area & add laundry cabinets | $22,000 |
| Oct 5, 2012 | Completed final sign-off Nov 2012 | 2171 Grove St | refresh/remodeling one bathroom at 1st level. replace fixture, sink, tub remain. no structural work.Details
refresh/remodeling one bathroom at 1st level. replace fixture, sink, tub remain. no structural work. | $7,000 |
| May 27, 2011 | Never finaled issued May 2011, no final | 430 Bush St | revision to 201103182415. relocation of shower room from building maintenance shop to new unisex bathroom.Details
revision to 201103182415. relocation of shower room from building maintenance shop to new unisex bathroom. | $1,000 |
| Jun 24, 2010 | Completed final sign-off Dec 2010 | 145 El Verano Wy | remodeling master bathroom and guest bathroom second flr; all fixture repl and remain in the same locationDetails
remodeling master bathroom and guest bathroom second flr; all fixture repl and remain in the same location | $18,000 |
| Jun 29, 2009 | Completed final sign-off Aug 2009 | 345 Brentwood Av | remodeling 2nd floor bathroom. replace toilet, shower & sink at same location. replace light fixtures.Details
remodeling 2nd floor bathroom. replace toilet, shower & sink at same location. replace light fixtures. | $12,000 |
| Jun 4, 2009 | Completed final sign-off Aug 2009 | 45 Mendosa Av | remodel guest bathroom at 1st fl. replace tub, toilet, shower & sink at same location. light fixture same location. (e) bathroom window w/ new. not visible from street.Details
remodel guest bathroom at 1st fl. replace tub, toilet, shower & sink at same location. light fixture same location. (e) bathroom window w/ new. not visible from street. | $15,000 |
| Oct 3, 2008 | Completed final sign-off Mar 2009 | 2700 Filbert St | at 2nd fl: remodel master bathroom, replace tub, toilet & sink in same location. install new shower at 3rd fl shown on plans: remodel guest bathroom, remove tub & replace new shower not shown on plans.Details
at 2nd fl: remodel master bathroom, replace tub, toilet & sink in same location. install new shower at 3rd fl shown on plans: remodel guest bathroom, remove tub & replace new shower not shown on plans. | $25,000 |
| Aug 11, 2008 | Completed final sign-off Nov 2008 | 355 Santa Clara Av | replace 12 windows same size in kind as follow - 2 computer room, 3 master bedroom, 2 guest bedroom#1, 2 guest bedroom#2, 1 satir hall, 2 hall bath. all wood, lowen windows.Details
replace 12 windows same size in kind as follow - 2 computer room, 3 master bedroom, 2 guest bedroom#1, 2 guest bedroom#2, 1 satir hall, 2 hall bath. all wood, lowen windows. | $16,000 |
| Apr 29, 2008 | Completed final sign-off Apr 2009 | 158 27th Av | renovate 1st level: remodel master bedroom,bath, laundry and closet, including add bath wndw and fill in 2 m. bedroom wndws. replace extg exterior sliding door and extg wndw back east wall. install anchor bolting in epoxy at 48" oc.(drill epoxy n 5/8 anchor bolts at 48" oc w/ 2"x2"x 3/16" washerDetails
renovate 1st level: remodel master bedroom,bath, laundry and closet, including add bath wndw and fill in 2 m. bedroom wndws. replace extg exterior sliding door and extg wndw back east wall. install anchor bolting in epoxy at 48" oc.(drill epoxy n 5/8 anchor bolts at 48" oc w/ 2"x2"x 3/16" washer | $90,000 |
| Oct 31, 2007 | Completed final sign-off Aug 2008 | 158 27th Av | renovation: 1. first floor: add partition wall for storage in garage, replace (e) sink at laundry, replace (e) toilet in the bathroom. 2. second floor: seal up (e) fireplace. 3.third floor: remodel (e) bedroom #2 including (e) office #2, remove (e) fireplace flue and 3 (n) skylights.Details
renovation: 1. first floor: add partition wall for storage in garage, replace (e) sink at laundry, replace (e) toilet in the bathroom. 2. second floor: seal up (e) fireplace. 3.third floor: remodel (e) bedroom #2 including (e) office #2, remove (e) fireplace flue and 3 (n) skylights. | $30,000 |
| Oct 18, 2007 | Completed final sign-off Feb 2008 | 2747 Vallejo St | replace 10 sets of french door similar with existing. (dg glass) 6 visable from street. replace 4 sets of windows similar with existing. (dg glass) all visible from the street. same size & location. u value less than 0.67. replace shower pan at master bathroom. replace membrane 4th floor balcony atDetails
replace 10 sets of french door similar with existing. (dg glass) 6 visable from street. replace 4 sets of windows similar with existing. (dg glass) all visible from the street. same size & location. u value less than 0.67. replace shower pan at master bathroom. replace membrane 4th floor balcony at | $60,000 |
| Aug 17, 2007 | Completed final sign-off Oct 2007 | 2121 Broadway | work @ unit# 3 only. replace 14 windows with new marvin clad as follow: 6 windows south (back of bldg). 3 master bedroom. 3 den. 2 windows east (left back of bldg). 1 master bath. 1 master closet. 6 windows west (right back of bldg) 1 den. 4 at guest bedroom# 1 & 1 at guest bedroom# 2.Details
work @ unit# 3 only. replace 14 windows with new marvin clad as follow: 6 windows south (back of bldg). 3 master bedroom. 3 den. 2 windows east (left back of bldg). 1 master bath. 1 master closet. 6 windows west (right back of bldg) 1 den. 4 at guest bedroom# 1 & 1 at guest bedroom# 2. | $10,000 |
| Apr 26, 2007 | Completed final sign-off Mar 2008 | 1028 Chestnut St | revision to pa# 2007/03/26/7238. scope of work. replace exterior, single pane windows with new double pane per plan enlarge opening between living room & dinning room. enlarge openings. between dinning room & kitchen. remove small closet from bathroom# 2, install additional power room, remodelDetails
revision to pa# 2007/03/26/7238. scope of work. replace exterior, single pane windows with new double pane per plan enlarge opening between living room & dinning room. enlarge openings. between dinning room & kitchen. remove small closet from bathroom# 2, install additional power room, remodel | $90,000 |
| Feb 27, 2004 | Completed final sign-off May 2004 | 176 Edgewood Av | remodel bathroom- change fixtures & replace tub.install tiles around tub @ 3 walls onlyDetails
remodel bathroom- change fixtures & replace tub.install tiles around tub @ 3 walls only | $10,000 |
| Jan 24, 2003 | Never finaled issued Jan 2003, no final | 25 Divisadero St | rev. appl#200212103197 remodel kitchen, laundry, install 2 new bathrooms & windows on 2/f onlyDetails
rev. appl#200212103197 remodel kitchen, laundry, install 2 new bathrooms & windows on 2/f only | $15,000 |
| Dec 10, 2002 | Never finaled issued Dec 2002, no final | 25 Divisadero St | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $55,000 |