Block 1332, lot 032
158 27th Ave
- City’s use
- Single Family Residential
- Built
- 1909
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,136 sq ft
- Lot
- 3,001 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2017 | Never finaled issued Oct 2017, no final | 158 27th Av | Asc Construction Services Inc | demo (2) 3/f bathroom, install new tiles, vanity, lighting, fixtures. enlarge masterbath and add closet in master bedroom. relocate toilet, add sink in masterbath, upgrade switches, outlets and fixtures (electrical & plumbing).Details
demo (2) 3/f bathroom, install new tiles, vanity, lighting, fixtures. enlarge masterbath and add closet in master bedroom. relocate toilet, add sink in masterbath, upgrade switches, outlets and fixtures (electrical & plumbing). | $38,000 |
| Nov 18, 2009 | Completed final sign-off Dec 2009 | 158 27th Av | Teevan Company | 3rd floor framing repair. replace (e) lighting in kitchen & family room. not shown on plans.Details
3rd floor framing repair. replace (e) lighting in kitchen & family room. not shown on plans. | $15,000 |
| Aug 19, 2009 | Completed final sign-off Feb 2010 | 158 27th Av | Teevan Company | voluntary upgrades at eaat and partial south exterior walls. install one phd 8 holddown at east elev. install straps at east wall and in the master bedroom ceiling. replace plywood and shingles ( east wall and partial south wall). replace 11 windows in kind nit visible from the streetDetails
voluntary upgrades at eaat and partial south exterior walls. install one phd 8 holddown at east elev. install straps at east wall and in the master bedroom ceiling. replace plywood and shingles ( east wall and partial south wall). replace 11 windows in kind nit visible from the street | $40,000 |
| Jun 4, 2009 | Never finaled issued Jun 2009, no final | 158 27th Av | street space permit.Details
street space permit. | ||
| Apr 21, 2009 | Never finaled issued Apr 2009, no final | 158 27th Av | street space permit only.Details
street space permit only. | ||
| Apr 6, 2009 | Completed final sign-off Feb 2010 | 158 27th Av | Teevan Company | revision to app #200903164172, change in wall thickness to post from 3/8" to 3/16". change in top rail thickness from 1/4 to 3/8". change in steel plate detail at parapet plates. do no need to be welded together if they each have 10 bolts minimum. stair handrail switched from one side to the otherDetails
revision to app #200903164172, change in wall thickness to post from 3/8" to 3/16". change in top rail thickness from 1/4 to 3/8". change in steel plate detail at parapet plates. do no need to be welded together if they each have 10 bolts minimum. stair handrail switched from one side to the other | |
| Mar 16, 2009 | Completed final sign-off Feb 2010 | 158 27th Av | Teevan Company | revision to application #2008/1208/8019. change support glass see pages a8.0, a8.1, a8.2 and a8.3.Details
revision to application #2008/1208/8019. change support glass see pages a8.0, a8.1, a8.2 and a8.3. | $4,000 |
| Jan 13, 2009 | Never finaled issued Jan 2009, no final | 158 27th Av | street space permitDetails
street space permit | ||
| Dec 9, 2008 | Completed final sign-off Feb 2010 | 158 27th Av | Teevan Company | (n) landscape lighting, electrical & plumbing. remove existing & install (n) perimeter fence footing and new fence, new side yard gate at back yard and replace side yard gate at front.Details
(n) landscape lighting, electrical & plumbing. remove existing & install (n) perimeter fence footing and new fence, new side yard gate at back yard and replace side yard gate at front. | $8,000 |
| Dec 8, 2008 | Completed final sign-off Feb 2010 | 158 27th Av | Teevan Company | replace existing nonconforming guardrails w/ new 42" conforming railings, add code compliant stair hand rail on roof stair.Details
replace existing nonconforming guardrails w/ new 42" conforming railings, add code compliant stair hand rail on roof stair. | $16,000 |
| Nov 20, 2008 | Never finaled issued Nov 2008, no final | 158 27th Av | street space permit only.Details
street space permit only. | ||
| Sep 19, 2008 | Completed final sign-off Nov 2009 | 158 27th Av | Teevan Company | replace existing wood stair at rear including new foundation and property line 1 hr guardwall. new property line fence at rear including new 2' a/grade retaining wall.Details
replace existing wood stair at rear including new foundation and property line 1 hr guardwall. new property line fence at rear including new 2' a/grade retaining wall. | $8,000 |
| Sep 11, 2008 | Never finaled issued Sep 2008, no final | 158 27th Av | street space only.Details
street space only. | ||
| Aug 1, 2008 | Completed final sign-off Apr 2009 | 158 27th Av | Teevan Company | revision to pa# 2008-0429-0839; 1153350-replace page s.1.1. general notes & special inspection form. replace s.2.1.-plans (revision section 3 & 4). replace 200 sq ft of shingles at west wall (front) between north wall & bay windows in kind (not show in plans)Details
revision to pa# 2008-0429-0839; 1153350-replace page s.1.1. general notes & special inspection form. replace s.2.1.-plans (revision section 3 & 4). replace 200 sq ft of shingles at west wall (front) between north wall & bay windows in kind (not show in plans) | $6,000 |
| May 27, 2008 | Completed final sign-off Aug 2008 | 158 27th Av | Teevan Company | revision to application 200804290839 to show on a3.1 (e) north elevation wall 1 hour exterior property line wall detail. a3.2, revise (e) east rear elevation, new window south elevation change from rectangular to oval.Details
revision to application 200804290839 to show on a3.1 (e) north elevation wall 1 hour exterior property line wall detail. a3.2, revise (e) east rear elevation, new window south elevation change from rectangular to oval. | $4,000 |
| Apr 29, 2008 | Completed final sign-off Apr 2009 | 158 27th Av | Teevan Company | renovate 1st level: remodel master bedroom,bath, laundry and closet, including add bath wndw and fill in 2 m. bedroom wndws. replace extg exterior sliding door and extg wndw back east wall. install anchor bolting in epoxy at 48" oc.(drill epoxy n 5/8 anchor bolts at 48" oc w/ 2"x2"x 3/16" washerDetails
renovate 1st level: remodel master bedroom,bath, laundry and closet, including add bath wndw and fill in 2 m. bedroom wndws. replace extg exterior sliding door and extg wndw back east wall. install anchor bolting in epoxy at 48" oc.(drill epoxy n 5/8 anchor bolts at 48" oc w/ 2"x2"x 3/16" washer | $90,000 |
| Oct 31, 2007 | Completed final sign-off Aug 2008 | 158 27th Av | Teevan Company | renovation: 1. first floor: add partition wall for storage in garage, replace (e) sink at laundry, replace (e) toilet in the bathroom. 2. second floor: seal up (e) fireplace. 3.third floor: remodel (e) bedroom #2 including (e) office #2, remove (e) fireplace flue and 3 (n) skylights.Details
renovation: 1. first floor: add partition wall for storage in garage, replace (e) sink at laundry, replace (e) toilet in the bathroom. 2. second floor: seal up (e) fireplace. 3.third floor: remodel (e) bedroom #2 including (e) office #2, remove (e) fireplace flue and 3 (n) skylights. | $30,000 |
| Jun 6, 2003 | Completed final sign-off Aug 2003 | 158 27th Av | renew expired appn. 9806051Details
renew expired appn. 9806051 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Teevan Company (11), Asc Construction Services Inc
- Architects
- Marshall Schneider (2), John Maniscalco
- Engineers
- David Jones, Lawrence Liao
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.