Back to kitchen remodel contractors
Teevan Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2025
- Last 24 months
- 3 permits filed
154 permits since 2000: 136 completed, 2 in progress, 7 never finaled, 9 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 15 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2025 | In progress issued Apr 2025 | 200 Brannan St | unit 232-kitchen and (3) bathrooms remodel. update all surfaces, remove closets, partition walls, install pocket doors, cabinets, countertops, appliances and lighting.Details
unit 232-kitchen and (3) bathrooms remodel. update all surfaces, remove closets, partition walls, install pocket doors, cabinets, countertops, appliances and lighting. | $210,000 |
| May 14, 2021 | Completed final sign-off Nov 2021 | 2260 Vallejo St | unit 2: no new wall & no existing wall relocation. remodel in kind kitchen, master bath and guest bathroom. no changes to floor plan or walls. install/replace appliances, fixtures, cabinets, countertops and lights. new lighting shall comply with cec 150.0 (k)3 & (k)5Details
unit 2: no new wall & no existing wall relocation. remodel in kind kitchen, master bath and guest bathroom. no changes to floor plan or walls. install/replace appliances, fixtures, cabinets, countertops and lights. new lighting shall comply with cec 150.0 (k)3 & (k)5 | $40,000 |
| Mar 8, 2021 | Completed final sign-off Nov 2021 | 755 Capp St | kitchen remodeling; replace cabinetry, fixtures, appliances, countertops , lightings, and receptacles, no structural work required.Details
kitchen remodeling; replace cabinetry, fixtures, appliances, countertops , lightings, and receptacles, no structural work required. | $40,000 |
| May 12, 2020 | Completed final sign-off Sep 2021 | 1870 Jackson St | unit #703: remodel kitchen. replace cabinetry, fixtures, appliances, countertops, lighting, and receptacles. same layout. no structural work. like for like.Details
unit #703: remodel kitchen. replace cabinetry, fixtures, appliances, countertops, lighting, and receptacles. same layout. no structural work. like for like. | $20,000 |
| Mar 12, 2018 | Completed final sign-off Aug 2018 | 635 Lisbon St | kitchen remodel. replace cabinetry, fixts, appliances & counter tops.Details
kitchen remodel. replace cabinetry, fixts, appliances & counter tops. | $15,000 |
| Mar 23, 2017 | Completed final sign-off Apr 2017 | 3058 Polk St | replace (1) kitchen window (lightwell) second level (unit #2) in same opening, not visible from street.Details
replace (1) kitchen window (lightwell) second level (unit #2) in same opening, not visible from street. | $1,000 |
| Dec 13, 2016 | Completed final sign-off Jun 2017 | 971 Church St | 3rd floor - kitchen renovation: replace cabinetry, fixtures, appliances, counter tops, lighting and receptacles. add skylight fill in (e) door to laundry, replace (e) window with (n) door, replace (e) window at sink. remove (e) recessed light fixtures in dining room add (n) sconcesDetails
3rd floor - kitchen renovation: replace cabinetry, fixtures, appliances, counter tops, lighting and receptacles. add skylight fill in (e) door to laundry, replace (e) window with (n) door, replace (e) window at sink. remove (e) recessed light fixtures in dining room add (n) sconces | $60,000 |
| Jun 10, 2015 | Completed final sign-off Nov 2015 | 184 Collins St | 1st floor - no change on walls. remodeling (e) kitchen and powder room. all new appliances and fixtures install at same location. install new cabinets at study room. second floor: remodeling master bathroom - all fixtures same location.Details
1st floor - no change on walls. remodeling (e) kitchen and powder room. all new appliances and fixtures install at same location. install new cabinets at study room. second floor: remodeling master bathroom - all fixtures same location. | $88,000 |
| May 10, 2013 | Completed final sign-off Oct 2013 | 355 Santa Clara Av | replace 10 windows and repair dry rot in-kind @ kitchen walls back of the house, not visible from the street.Details
replace 10 windows and repair dry rot in-kind @ kitchen walls back of the house, not visible from the street. | $18,800 |
| Dec 3, 2009 | Completed final sign-off Feb 2010 | 32 06th Av | structural improvement @ s. side ext.passageway 1st flr under kitchen/dining.install temporary shoring,replace 4-6"x6" posts, remove (e)slab, 4(e) concrete piers,install new continues footing 3'-3" widex12'-6"long x 18"depth.replace approx 65'x5"new clay sewer lateral w/new cast iron (fr sidewalk)Details
structural improvement @ s. side ext.passageway 1st flr under kitchen/dining.install temporary shoring,replace 4-6"x6" posts, remove (e)slab, 4(e) concrete piers,install new continues footing 3'-3" widex12'-6"long x 18"depth.replace approx 65'x5"new clay sewer lateral w/new cast iron (fr sidewalk) | $15,000 |
| Nov 18, 2009 | Completed final sign-off Dec 2009 | 158 27th Av | 3rd floor framing repair. replace (e) lighting in kitchen & family room. not shown on plans.Details
3rd floor framing repair. replace (e) lighting in kitchen & family room. not shown on plans. | $15,000 |
| Nov 10, 2008 | Completed final sign-off Jun 2009 | 1324 Greenwich St | replace shingle, water proofing membrane and bay windows at south facade of bldg. install insulation at 2/f, replace exterior kitchen door and laundry door in kind, not visable from the street, bldg. sit in back of other bldg.Details
replace shingle, water proofing membrane and bay windows at south facade of bldg. install insulation at 2/f, replace exterior kitchen door and laundry door in kind, not visable from the street, bldg. sit in back of other bldg. | $25,000 |
| Apr 26, 2007 | Completed final sign-off Mar 2008 | 1028 Chestnut St | revision to pa# 2007/03/26/7238. scope of work. replace exterior, single pane windows with new double pane per plan enlarge opening between living room & dinning room. enlarge openings. between dinning room & kitchen. remove small closet from bathroom# 2, install additional power room, remodelDetails
revision to pa# 2007/03/26/7238. scope of work. replace exterior, single pane windows with new double pane per plan enlarge opening between living room & dinning room. enlarge openings. between dinning room & kitchen. remove small closet from bathroom# 2, install additional power room, remodel | $90,000 |
| Mar 26, 2007 | Completed final sign-off Mar 2008 | 1028 Chestnut St | kitchen remodel: new electrical, lighting, flooring, cabinetry, countertops, plumbing fixtures, and appliances. remove 3 (e) single pane windows and replace with 1 new double pane window. infill (e) interior door wall between hall & kitchen, remove 4'8" section of non-bearing interior wall.Details
kitchen remodel: new electrical, lighting, flooring, cabinetry, countertops, plumbing fixtures, and appliances. remove 3 (e) single pane windows and replace with 1 new double pane window. infill (e) interior door wall between hall & kitchen, remove 4'8" section of non-bearing interior wall. | $60,000 |
| Jan 24, 2003 | Never finaled issued Jan 2003, no final | 25 Divisadero St | rev. appl#200212103197 remodel kitchen, laundry, install 2 new bathrooms & windows on 2/f onlyDetails
rev. appl#200212103197 remodel kitchen, laundry, install 2 new bathrooms & windows on 2/f only | $15,000 |
| Dec 10, 2002 | Never finaled issued Dec 2002, no final | 25 Divisadero St | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $55,000 |
| Feb 11, 2002 | Expired or cancelled expired Aug 2002 | 2612 Scott St | install 5 support joists/remove beam/install bearing wall to strengthen kitchenDetails
install 5 support joists/remove beam/install bearing wall to strengthen kitchen | $20,000 |
| Jul 24, 2001 | Completed final sign-off Aug 2002 | 844 Green St | install beam in kitchen, provide fire door @ stair, install new shower, modify bathrm & 2 kitchenDetails
install beam in kitchen, provide fire door @ stair, install new shower, modify bathrm & 2 kitchen | $25,000 |
| Mar 20, 2001 | Expired or cancelled expired Sep 2001 | 844 Green St | change kitchen cabinets in lower unit change sink and stove in kitchen install hardood floorDetails
change kitchen cabinets in lower unit change sink and stove in kitchen install hardood floor | $15,000 |
| Jul 24, 2000 | Completed final sign-off Jan 2001 | 2757 Divisadero St | remodel kitchen, change floor, cabinets, sink,stove, oven & lightsDetails
remodel kitchen, change floor, cabinets, sink,stove, oven & lights | $30,000 |