Permit GraphShortlistSan Francisco building permits since 2000

Block 0946, lot 010

2648 Union St

City’s use
Multi-Family Residential
Built
1909
Stories
2
Units
4
Rooms
8 bathrooms
Building
9,140 sq ft
Lot
8,241 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 6, 2015Completed
final sign-off May 2015
2648 Union StTeevan Companyremodeling master bathroom at 2nd floor. remove (e) tub and install shower at tub location. remove (e) and install new vanity, sink, toilet and accessories at same location.
Details
Permit
201501064991
Permit issued
Jan 6, 2015
Final sign-off
May 7, 2015

remodeling master bathroom at 2nd floor. remove (e) tub and install shower at tub location. remove (e) and install new vanity, sink, toilet and accessories at same location.

Open the permit page

$10,000
Jul 24, 2014Never finaled
issued Jul 2014, no final
2650 Union Ststreet space
Details
Permit
M506567
Permit issued
Jul 24, 2014

street space

Open the permit page

Dec 24, 2009Never finaled
issued Dec 2009, no final
2652 Union StArdo Construction Co.comply w/ physical inspection report cc-5664lb.
Details
Permit
200912243818
Permit issued
Dec 24, 2009
Final sign-off
Dec 24, 2009

comply w/ physical inspection report cc-5664lb.

Open the permit page

Dec 24, 2009Never finaled
issued Dec 2009, no final
2648 Union StArdo Construction Co.comply w/ physical inspection report cc-5664rb.
Details
Permit
200912243821
Permit issued
Dec 24, 2009
Final sign-off
Dec 24, 2009

comply w/ physical inspection report cc-5664rb.

Open the permit page

Apr 7, 2006Completed
final sign-off Aug 2006
2654 Union StArdo Construction Co.kitchen remodel. remove and replace cabinets, upgrade electrical and plumbing and floor covering. no structural changes. flourescent lighting
Details
Permit
200604078468
Permit issued
Apr 7, 2006
Final sign-off
Aug 10, 2006

kitchen remodel. remove and replace cabinets, upgrade electrical and plumbing and floor covering. no structural changes. flourescent lighting

Open the permit page

$25,000
Apr 3, 2006Completed
final sign-off Apr 2006
2648 Union StArdo Construction Co.upgrade voluntary foundation 5/8 diam. bolting @ 4 ft o.c. clips 6 blocking 6 1/2 "street grade plywood sheer. to conform to current ubc standards 69' linean ft. 400 sqft. of shear (e) anchol bolts all work at ground floor.
Details
Permit
200604038081
Permit issued
Apr 3, 2006
Final sign-off
Apr 19, 2006

upgrade voluntary foundation 5/8 diam. bolting @ 4 ft o.c. clips 6 blocking 6 1/2 "street grade plywood sheer. to conform to current ubc standards 69' linean ft. 400 sqft. of shear (e) anchol bolts all work at ground floor.

Open the permit page

$4,500

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Ardo Construction Co. (4), Teevan Company

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.