Block 0946, lot 010
2648 Union St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 2
- Units
- 4
- Rooms
- 8 bathrooms
- Building
- 9,140 sq ft
- Lot
- 8,241 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2015 | Completed final sign-off May 2015 | 2648 Union St | Teevan Company | remodeling master bathroom at 2nd floor. remove (e) tub and install shower at tub location. remove (e) and install new vanity, sink, toilet and accessories at same location.Details
remodeling master bathroom at 2nd floor. remove (e) tub and install shower at tub location. remove (e) and install new vanity, sink, toilet and accessories at same location. | $10,000 |
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 2650 Union St | street spaceDetails
street space | ||
| Dec 24, 2009 | Never finaled issued Dec 2009, no final | 2648 Union St | Ardo Construction Co. | comply w/ physical inspection report cc-5664rb.Details
comply w/ physical inspection report cc-5664rb. | |
| Dec 24, 2009 | Never finaled issued Dec 2009, no final | 2652 Union St | Ardo Construction Co. | comply w/ physical inspection report cc-5664lb.Details
comply w/ physical inspection report cc-5664lb. | |
| Apr 7, 2006 | Completed final sign-off Aug 2006 | 2654 Union St | Ardo Construction Co. | kitchen remodel. remove and replace cabinets, upgrade electrical and plumbing and floor covering. no structural changes. flourescent lightingDetails
kitchen remodel. remove and replace cabinets, upgrade electrical and plumbing and floor covering. no structural changes. flourescent lighting | $25,000 |
| Apr 3, 2006 | Completed final sign-off Apr 2006 | 2648 Union St | Ardo Construction Co. | upgrade voluntary foundation 5/8 diam. bolting @ 4 ft o.c. clips 6 blocking 6 1/2 "street grade plywood sheer. to conform to current ubc standards 69' linean ft. 400 sqft. of shear (e) anchol bolts all work at ground floor.Details
upgrade voluntary foundation 5/8 diam. bolting @ 4 ft o.c. clips 6 blocking 6 1/2 "street grade plywood sheer. to conform to current ubc standards 69' linean ft. 400 sqft. of shear (e) anchol bolts all work at ground floor. | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ardo Construction Co. (4), Teevan Company
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.