Team Commercial Construction Inc.
- Based in
- Point Richmond
- On San Francisco permits
- Jan 2000 to Mar 2024
- Last 24 months
- 0 permits filed
547 permits since 2000: 382 completed, 84 never finaled, 81 expired or cancelled.
Of the 84 never-finaled permits, 9 are 3 to 5 years old, 24 are 5 to 10 years old, 51 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 5 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2021 | Completed final sign-off Jun 2021 | 665 03rd St | decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.Details
decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project. | $80,000 |
| Aug 5, 2016 | Completed final sign-off May 2017 | 665 03rd St | revision: submit shop drawings for (e) permit stairs 201603253143 for stairs between 2nd & 3rd floors. maher naDetails
revision: submit shop drawings for (e) permit stairs 201603253143 for stairs between 2nd & 3rd floors. maher na | |
| Mar 25, 2016 | Completed final sign-off May 2017 | 665 03rd St | 2nd floor ti including new connecting stair to 3rd floorDetails
2nd floor ti including new connecting stair to 3rd floor | $72,000 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 150 California St | remove extg interior one story non egress communicating stair from between the 18th and 19th floors. infill concrete and steel pan deck to form a 2 hour seperation. n/a for the maher.Details
remove extg interior one story non egress communicating stair from between the 18th and 19th floors. infill concrete and steel pan deck to form a 2 hour seperation. n/a for the maher. | $78,000 |
| Feb 5, 2014 | Completed final sign-off Nov 2014 | 180 Howard St | revisions to pa#20131115195 to corridor ceiling lighting & exit signs. addition of bldg electric closet & hallway. evacuation signs included. add fire exit panic hardware to one pair of tenant doors & new rated stair & vestibule stair doors. compliance w/ ordinance no. 155-13 not required. excavatioDetails
revisions to pa#20131115195 to corridor ceiling lighting & exit signs. addition of bldg electric closet & hallway. evacuation signs included. add fire exit panic hardware to one pair of tenant doors & new rated stair & vestibule stair doors. compliance w/ ordinance no. 155-13 not required. excavatio |