Stroub Construction
- Based in
- Sausalito
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 13 permits filed
137 permits since 2000: 108 completed, 16 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 14 completed, 5 in progress. Typically 15 days from filing to permit and 367 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 2652 Broadway | the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor.Details
the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor. | $1,230,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 250 Laurel St | unit 401: interior alteration including selective demolition, modification of non-load bearing interior partitions, kitchen and bath remodel, new plumbing fixtures & asso. piping, electrical and lighting alterations. modifications to (e) heating system. replacement of int. finishes & millwork....Details
unit 401: interior alteration including selective demolition, modification of non-load bearing interior partitions, kitchen and bath remodel, new plumbing fixtures & asso. piping, electrical and lighting alterations. modifications to (e) heating system. replacement of int. finishes & millwork.... | $150,000 |
| May 29, 2025 | In progress issued Jul 2026 | 65 Raycliff Tr | revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build asDetails
revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build as | $350,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 65 Raycliff Tr | revision to pa 202111182729. to remove the addition of adu and maintain existing single family use. remove one (e) closet wall and door. revise kitchen to remove full size range and hood and full size refrig. replace w/ under counter frig and 2-burner invention cooktop. remove designated adu addressDetails
revision to pa 202111182729. to remove the addition of adu and maintain existing single family use. remove one (e) closet wall and door. revise kitchen to remove full size range and hood and full size refrig. replace w/ under counter frig and 2-burner invention cooktop. remove designated adu address | $10,000 |
| Jul 16, 2024 | In progress issued Aug 2024 | 129 24th Av | lower level remove (e) stairs. add new stair up to main level. at main level, remodel (e) sunroom, kitchen & bathroom. at upper level, remodel (e) bedrooms & bathrooms. relocate windows at north. relocate & add new windows at west. new skylight. replace/repair siding & roofing in kind as required.Details
lower level remove (e) stairs. add new stair up to main level. at main level, remodel (e) sunroom, kitchen & bathroom. at upper level, remodel (e) bedrooms & bathrooms. relocate windows at north. relocate & add new windows at west. new skylight. replace/repair siding & roofing in kind as required. | $1,500,000 |
| Apr 25, 2022 | Completed final sign-off Jan 2025 | 351 San Carlos St | one kitchen and one bathroom remodel. non structuralDetails
one kitchen and one bathroom remodel. non structural | $25,000 |
| Oct 5, 2017 | Completed final sign-off Mar 2021 | 2859 Filbert St | minor infill additions @ 1st fl, 2nd & 3rd floor.new exterior finishes, windows & doors throughout. remodel kitchen & (5) bathrooms, add (1)new bathroom & misc interior remodeling.Details
minor infill additions @ 1st fl, 2nd & 3rd floor.new exterior finishes, windows & doors throughout. remodel kitchen & (5) bathrooms, add (1)new bathroom & misc interior remodeling. | $328,000 |
| Sep 3, 2015 | Completed final sign-off Feb 2018 | 2616 Union St | interior works only. remodel kitchen and master bathroom. enlarged 3 openings in interior walls. misc. cosmetic work, paint and trim.Details
interior works only. remodel kitchen and master bathroom. enlarged 3 openings in interior walls. misc. cosmetic work, paint and trim. | $575,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 45 Homestead St | 2/f: replace kitchen cabinets & finishes, no change to wall & opening layouts. kitchen lighting will have 50% min. wattache high efficacyDetails
2/f: replace kitchen cabinets & finishes, no change to wall & opening layouts. kitchen lighting will have 50% min. wattache high efficacy | $28,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2016 | 2255 Octavia St | kitchen and sitting room remodel with new windows and doors to rear yard. maher not requiredDetails
kitchen and sitting room remodel with new windows and doors to rear yard. maher not required | $68,000 |
| Jul 19, 2013 | Completed final sign-off Oct 2016 | 3524 Jackson St | revision to app #201303222850, new addition to (e) garage with terrace above, new gas fireplace and chimney at living room, relocate (e) solarium and skylights, reduce kitchen, new addition to terrace #1 foot printDetails
revision to app #201303222850, new addition to (e) garage with terrace above, new gas fireplace and chimney at living room, relocate (e) solarium and skylights, reduce kitchen, new addition to terrace #1 foot print | $35,000 |
| Mar 22, 2013 | Completed final sign-off Oct 2016 | 3524 Jackson St | remove (e) 2 car garage & corresponding curb cut. new front facade work include relocate entry & stairs, infill of (e) entry.modified cornice @ dormers, new windows & extend (e) planters. additional new windows & doors & redirect rear yard stairs. remodel kitchen & 3.5 bathrms. reconfigure miscDetails
remove (e) 2 car garage & corresponding curb cut. new front facade work include relocate entry & stairs, infill of (e) entry.modified cornice @ dormers, new windows & extend (e) planters. additional new windows & doors & redirect rear yard stairs. remodel kitchen & 3.5 bathrms. reconfigure misc | $275,000 |
| Feb 8, 2013 | Completed final sign-off Jan 2014 | 1940 Broadway | remodel kitchen & 2.5 baths, remove 1 bath, replace existing single glazed wood window sashes with new double - glazed wood window sashes in kind configurations. reconfigure misc, non-load bearing walls and provide misc interior improvement. no structwork. all new doors 2b 20 min. except pocket drDetails
remodel kitchen & 2.5 baths, remove 1 bath, replace existing single glazed wood window sashes with new double - glazed wood window sashes in kind configurations. reconfigure misc, non-load bearing walls and provide misc interior improvement. no structwork. all new doors 2b 20 min. except pocket dr | $200,000 |
| Oct 30, 2012 | Completed final sign-off Apr 2013 | 28 Allen St | 1st fl reconfigure bedroom closet, renovate bath #1, new cabinets at kitchen. 2nd fl: reconfigure study, new powder room. reconfigure closets at bedroom 2, renovate bath 2. no new conditioned space. no increase in evelope . no alteration of facade, no structuralDetails
1st fl reconfigure bedroom closet, renovate bath #1, new cabinets at kitchen. 2nd fl: reconfigure study, new powder room. reconfigure closets at bedroom 2, renovate bath 2. no new conditioned space. no increase in evelope . no alteration of facade, no structural | $45,000 |
| Jun 28, 2012 | Completed final sign-off Jun 2013 | 2615 Union St | kitchen and 3 bath remodel, new cabinets and finishes no structural workDetails
kitchen and 3 bath remodel, new cabinets and finishes no structural work | $95,000 |
| Jan 18, 2012 | Completed final sign-off Aug 2012 | 59 Woodland Av | remodel kitchen & 2-1/2 bathrooms. no structural work @ 2nd. & 3rd. flr. comply with cec 150(k) lighting requirementsDetails
remodel kitchen & 2-1/2 bathrooms. no structural work @ 2nd. & 3rd. flr. comply with cec 150(k) lighting requirements | $75,000 |
| Dec 15, 2011 | Completed final sign-off Jun 2012 | 155 Jackson St | unit #2502-interior remodel, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitoons, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 complaint lighting. no changes to hvac.Details
unit #2502-interior remodel, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitoons, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 complaint lighting. no changes to hvac. | $107,800 |
| Jun 16, 2010 | Completed final sign-off Sep 2011 | 1916 Lyon St | addition @ rear & side. remodel kitchen, remodel bathroom @ master bath & misc interior improvement.Details
addition @ rear & side. remodel kitchen, remodel bathroom @ master bath & misc interior improvement. | $98,000 |
| Apr 1, 2010 | Completed final sign-off May 2011 | 75 Folsom St | unit#1204: relocate master suite & bar. remodel kitchen & master bathroom, reconfigure misc. non-load bearing wall and provide misc. interior improvements.Details
unit#1204: relocate master suite & bar. remodel kitchen & master bathroom, reconfigure misc. non-load bearing wall and provide misc. interior improvements. | $150,000 |