Stroub Construction
- Based in
- Sausalito
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 13 permits filed
137 permits since 2000: 108 completed, 16 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 8 completed, 2 in progress, 1 expired or cancelled. Typically 12 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2025 | Completed final sign-off Apr 2026 | 2633 Green St | dry-rot repair at rear deck including replacement of rotten ledger in kind. repair is less than 50%.Details
dry-rot repair at rear deck including replacement of rotten ledger in kind. repair is less than 50%. | $36,395 |
| May 29, 2025 | In progress issued Jul 2026 | 65 Raycliff Tr | revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build asDetails
revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build as | $350,000 |
| Mar 14, 2022 | Completed final sign-off Dec 2022 | 3633 Washington St | replace tile on exterior deck (on grade, off 3rd fl and top floor) all work in kind.Details
replace tile on exterior deck (on grade, off 3rd fl and top floor) all work in kind. | $20,000 |
| Jan 22, 2021 | In progress issued Jun 2026 | 4176 Cesar Chavez St | 4176 cesar chavez st-rear bulding. total rebuild of structur in-kind to prior demo w/ interior reconfiguration of 1st & 2nd flrs. (n) flat roof and (n) bay window configuration at rear elevation. no addition to height or footprint. (e) decks to be rebuilt in-kind. electric & plumb work as required.Details
4176 cesar chavez st-rear bulding. total rebuild of structur in-kind to prior demo w/ interior reconfiguration of 1st & 2nd flrs. (n) flat roof and (n) bay window configuration at rear elevation. no addition to height or footprint. (e) decks to be rebuilt in-kind. electric & plumb work as required. | $360,000 |
| Feb 7, 2019 | Expired or cancelled withdrawn Apr 2021 | 2859 Filbert St | revision to 201710050488 replacement of e deck due to extensive dry rot and structural modifications due to field conditionsDetails
revision to 201710050488 replacement of e deck due to extensive dry rot and structural modifications due to field conditions | $15,000 |
| May 2, 2016 | Completed final sign-off Feb 2018 | 2616 Union St | extend (e) deck @ ground floor into allowable envelope rebuild rail to code on 3rd floor.Details
extend (e) deck @ ground floor into allowable envelope rebuild rail to code on 3rd floor. | $38,000 |
| Apr 3, 2015 | Completed final sign-off May 2017 | 2636 Vallejo St | revision to pa# 2013/11/25/2758. revised skylight location. new metal guardrail in (e) location @ rear deck. new garage door in (e) location. additional locations to receive brick veneer @ front facade. 2 new windows (on side & rear facades) as shown on previously approved plans & title 24.Details
revision to pa# 2013/11/25/2758. revised skylight location. new metal guardrail in (e) location @ rear deck. new garage door in (e) location. additional locations to receive brick veneer @ front facade. 2 new windows (on side & rear facades) as shown on previously approved plans & title 24. | $15,000 |
| Mar 6, 2015 | Completed final sign-off Aug 2015 | 351 San Carlos St | new closet in master bedroom on 2nd floor, new ele throughout 1st flr, master bedroom & 3nd hallway. level deck surface on first floor. no structural work. electrical under separate permit.Details
new closet in master bedroom on 2nd floor, new ele throughout 1st flr, master bedroom & 3nd hallway. level deck surface on first floor. no structural work. electrical under separate permit. | $30,000 |
| Nov 25, 2013 | Completed final sign-off May 2017 | 2636 Vallejo St | build out area under(e) 2nd floor deck. cut back roof at rear to enlarge (e) roof deck. ** maher: compliance with ordinance no# 155-13 not required **Details
build out area under(e) 2nd floor deck. cut back roof at rear to enlarge (e) roof deck. ** maher: compliance with ordinance no# 155-13 not required ** | $800,000 |
| Jul 23, 2013 | Completed final sign-off Oct 2016 | 3524 Jackson St | new rear yard spa and deck, new retaining wall and reinforce extg retaining wall. all work within rear yard.Details
new rear yard spa and deck, new retaining wall and reinforce extg retaining wall. all work within rear yard. | $30,000 |
| Dec 23, 2004 | Completed final sign-off Aug 2005 | 2700 Union St | addendum to app 200405073353 & app 200309255814- alter (e) solid railing on new deck to change top 1Details
addendum to app 200405073353 & app 200309255814- alter (e) solid railing on new deck to change top 1 | $5,000 |