Back to bathroom remodel contractors
Stroub Construction
- Based in
- Sausalito
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 13 permits filed
137 permits since 2000: 108 completed, 16 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 25 completed, 4 in progress, 1 expired or cancelled. Typically 7 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 2652 Broadway | the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor.Details
the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor. | $1,230,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 250 Laurel St | unit 401: interior alteration including selective demolition, modification of non-load bearing interior partitions, kitchen and bath remodel, new plumbing fixtures & asso. piping, electrical and lighting alterations. modifications to (e) heating system. replacement of int. finishes & millwork....Details
unit 401: interior alteration including selective demolition, modification of non-load bearing interior partitions, kitchen and bath remodel, new plumbing fixtures & asso. piping, electrical and lighting alterations. modifications to (e) heating system. replacement of int. finishes & millwork.... | $150,000 |
| May 29, 2025 | In progress issued Jul 2026 | 65 Raycliff Tr | revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build asDetails
revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build as | $350,000 |
| Jul 16, 2024 | In progress issued Aug 2024 | 129 24th Av | lower level remove (e) stairs. add new stair up to main level. at main level, remodel (e) sunroom, kitchen & bathroom. at upper level, remodel (e) bedrooms & bathrooms. relocate windows at north. relocate & add new windows at west. new skylight. replace/repair siding & roofing in kind as required.Details
lower level remove (e) stairs. add new stair up to main level. at main level, remodel (e) sunroom, kitchen & bathroom. at upper level, remodel (e) bedrooms & bathrooms. relocate windows at north. relocate & add new windows at west. new skylight. replace/repair siding & roofing in kind as required. | $1,500,000 |
| Dec 1, 2023 | Completed final sign-off May 2024 | 2040 Franklin St | #1009: bathroom remodel. relocating pocket door. remove and replace shower tile and plumbing. new tile floor. new vanity, new toilet, new lighting in bedroom. relocation of closet door.Details
#1009: bathroom remodel. relocating pocket door. remove and replace shower tile and plumbing. new tile floor. new vanity, new toilet, new lighting in bedroom. relocation of closet door. | $16,000 |
| Apr 25, 2022 | Completed final sign-off Jan 2025 | 351 San Carlos St | one kitchen and one bathroom remodel. non structuralDetails
one kitchen and one bathroom remodel. non structural | $25,000 |
| Dec 9, 2019 | Completed final sign-off Apr 2022 | 2550 Vallejo St | interior remodel only. no exterior work. install personal elevator for the 3 floors. remove one post in garage, and add a beam. remodel bedroom suite and bathroom.Details
interior remodel only. no exterior work. install personal elevator for the 3 floors. remove one post in garage, and add a beam. remodel bedroom suite and bathroom. | $190,000 |
| Oct 5, 2017 | Completed final sign-off Mar 2021 | 2859 Filbert St | minor infill additions @ 1st fl, 2nd & 3rd floor.new exterior finishes, windows & doors throughout. remodel kitchen & (5) bathrooms, add (1)new bathroom & misc interior remodeling.Details
minor infill additions @ 1st fl, 2nd & 3rd floor.new exterior finishes, windows & doors throughout. remodel kitchen & (5) bathrooms, add (1)new bathroom & misc interior remodeling. | $328,000 |
| Jun 22, 2017 | Completed final sign-off Apr 2018 | 2761 Scott St | interior remodel of 800 sf at 4th floor only: master bedroom, bath, closet, office, and library. only exterior changes are 3 new wood windows to match extg. no new sq. ft. repair stucco to match.Details
interior remodel of 800 sf at 4th floor only: master bedroom, bath, closet, office, and library. only exterior changes are 3 new wood windows to match extg. no new sq. ft. repair stucco to match. | $100,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2018 | 3637 Washington St | add office and bathroom. remove columns and replace beams maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengtheningDetails
add office and bathroom. remove columns and replace beams maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengthening | $75,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2018 | 3639 Washington St | new interior concrete wall, full bathroom, partition wall. 1 hr separation at ceiling, beam strengthening maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengtheningDetails
new interior concrete wall, full bathroom, partition wall. 1 hr separation at ceiling, beam strengthening maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengthening | $75,000 |
| Mar 25, 2016 | Completed final sign-off Feb 2018 | 2616 Union St | replace bath window at rear of house. replace dining window & door unit at rear of house. both replacement units fit into existing opening. new units 100% insulated glazing (e) units are mix uninsulated & insulated.Details
replace bath window at rear of house. replace dining window & door unit at rear of house. both replacement units fit into existing opening. new units 100% insulated glazing (e) units are mix uninsulated & insulated. | $20,000 |
| Sep 3, 2015 | Completed final sign-off Feb 2018 | 2616 Union St | interior works only. remodel kitchen and master bathroom. enlarged 3 openings in interior walls. misc. cosmetic work, paint and trim.Details
interior works only. remodel kitchen and master bathroom. enlarged 3 openings in interior walls. misc. cosmetic work, paint and trim. | $575,000 |
| Jan 29, 2015 | Completed final sign-off Jun 2015 | 1209 Green St | unit 1: new fixtures & finishes in 2 (e) bathrooms, new electrical lighting; no doors/windows/walls under this scope comply with cbc 2013-co and smoke alarm requirements.Details
unit 1: new fixtures & finishes in 2 (e) bathrooms, new electrical lighting; no doors/windows/walls under this scope comply with cbc 2013-co and smoke alarm requirements. | $25,000 |
| Jan 16, 2015 | Expired or cancelled expired Jun 2019 | 700 Marina Bl | voluntary ada compliance upgrade of two existing bathrooms within the same space as existing bathrooms. new lighting & controls ot comply with new state of calif. ref'd.Details
voluntary ada compliance upgrade of two existing bathrooms within the same space as existing bathrooms. new lighting & controls ot comply with new state of calif. ref'd. | $46,000 |
| Dec 30, 2014 | Completed final sign-off Oct 2016 | 3524 Jackson St | rev.to #201303222850 & 201307192235:reconfigure front stair, add outdoor bbq. lower fl add bath, relocate laundry, add storage, add utility sink @ garage. 1st fl minor int wall changes. 2nd fl add bath, reconfigure closets & 1 bath. upper fl add fireplace, add 2 windows @ ma. bedrm. struct changesDetails
rev.to #201303222850 & 201307192235:reconfigure front stair, add outdoor bbq. lower fl add bath, relocate laundry, add storage, add utility sink @ garage. 1st fl minor int wall changes. 2nd fl add bath, reconfigure closets & 1 bath. upper fl add fireplace, add 2 windows @ ma. bedrm. struct changes | $40,000 |
| Jan 17, 2014 | Completed final sign-off Jun 2014 | 2921 Jackson St | add wine cellar in garage. new interior walls at living room and dining room at main dwelling.relocate bathroom at second floor of main dwelling and new washer and dryer linen/cabnet at 2nd floor main dwelling. seperate permit for installing elevator.Details
add wine cellar in garage. new interior walls at living room and dining room at main dwelling.relocate bathroom at second floor of main dwelling and new washer and dryer linen/cabnet at 2nd floor main dwelling. seperate permit for installing elevator. | $50,000 |
| Feb 8, 2013 | Completed final sign-off Jan 2014 | 1940 Broadway | remodel kitchen & 2.5 baths, remove 1 bath, replace existing single glazed wood window sashes with new double - glazed wood window sashes in kind configurations. reconfigure misc, non-load bearing walls and provide misc interior improvement. no structwork. all new doors 2b 20 min. except pocket drDetails
remodel kitchen & 2.5 baths, remove 1 bath, replace existing single glazed wood window sashes with new double - glazed wood window sashes in kind configurations. reconfigure misc, non-load bearing walls and provide misc interior improvement. no structwork. all new doors 2b 20 min. except pocket dr | $200,000 |
| Dec 13, 2012 | Completed final sign-off Apr 2013 | 28 Allen St | revision to app#201210303171. 2nd level:reconfigure bath #2 lay out including removing extg french doors and replaceing with smaller window.Details
revision to app#201210303171. 2nd level:reconfigure bath #2 lay out including removing extg french doors and replaceing with smaller window. | $6,500 |
| Oct 30, 2012 | Completed final sign-off Apr 2013 | 28 Allen St | 1st fl reconfigure bedroom closet, renovate bath #1, new cabinets at kitchen. 2nd fl: reconfigure study, new powder room. reconfigure closets at bedroom 2, renovate bath 2. no new conditioned space. no increase in evelope . no alteration of facade, no structuralDetails
1st fl reconfigure bedroom closet, renovate bath #1, new cabinets at kitchen. 2nd fl: reconfigure study, new powder room. reconfigure closets at bedroom 2, renovate bath 2. no new conditioned space. no increase in evelope . no alteration of facade, no structural | $45,000 |
| Jun 28, 2012 | Completed final sign-off Jun 2013 | 2615 Union St | kitchen and 3 bath remodel, new cabinets and finishes no structural workDetails
kitchen and 3 bath remodel, new cabinets and finishes no structural work | $95,000 |
| Apr 3, 2012 | Completed final sign-off Jun 2013 | 2615 Union St | addition at top level including bathroom relocationDetails
addition at top level including bathroom relocation | $75,000 |
| Jan 18, 2012 | Completed final sign-off Aug 2012 | 59 Woodland Av | remodel kitchen & 2-1/2 bathrooms. no structural work @ 2nd. & 3rd. flr. comply with cec 150(k) lighting requirementsDetails
remodel kitchen & 2-1/2 bathrooms. no structural work @ 2nd. & 3rd. flr. comply with cec 150(k) lighting requirements | $75,000 |
| Dec 15, 2011 | Completed final sign-off Jun 2012 | 155 Jackson St | unit #2502-interior remodel, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitoons, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 complaint lighting. no changes to hvac.Details
unit #2502-interior remodel, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitoons, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 complaint lighting. no changes to hvac. | $107,800 |
| Jan 11, 2011 | Completed final sign-off Jul 2011 | 201 Locust St | remodel master bath and master closet and misc. interior improvements. remove 4 windows and replace on window with dual glazed to match (e). no struc workDetails
remodel master bath and master closet and misc. interior improvements. remove 4 windows and replace on window with dual glazed to match (e). no struc work | $35,000 |
| Aug 13, 2010 | Completed final sign-off Oct 2010 | 3647 Washington St | bathroom remodel on level twoDetails
bathroom remodel on level two | $18,000 |
| Jun 16, 2010 | Completed final sign-off Sep 2011 | 1916 Lyon St | addition @ rear & side. remodel kitchen, remodel bathroom @ master bath & misc interior improvement.Details
addition @ rear & side. remodel kitchen, remodel bathroom @ master bath & misc interior improvement. | $98,000 |
| Apr 1, 2010 | Completed final sign-off May 2011 | 75 Folsom St | unit#1204: relocate master suite & bar. remodel kitchen & master bathroom, reconfigure misc. non-load bearing wall and provide misc. interior improvements.Details
unit#1204: relocate master suite & bar. remodel kitchen & master bathroom, reconfigure misc. non-load bearing wall and provide misc. interior improvements. | $150,000 |
| Mar 17, 2010 | Completed final sign-off Dec 2010 | 3647 Washington St | enlarge garage, new garage door, new intenal stairs, add bathroom, replace windows in-kind.Details
enlarge garage, new garage door, new intenal stairs, add bathroom, replace windows in-kind. | $150,000 |
| Feb 22, 2010 | Completed final sign-off Mar 2010 | 2434 Broadway | replace existing tub in 2nd floor master bath with new whirlpool tub in same location.Details
replace existing tub in 2nd floor master bath with new whirlpool tub in same location. | $4,500 |