Soon Ye Louie/Dba Soon Louie Const.

Contractor license
825575
State license record
Based in
San Francisco
On San Francisco permits
Sep 2003 to Dec 2022
Last 24 months
0 permits filed

78 permits since 2000: 66 completed, 12 never finaled.

Of the 12 never-finaled permits, 12 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllDeck 6Stairs 12Kitchen remodel 22Bathroom remodel 47

12 stairs permits: 9 completed, 3 never finaled. Typically 0 days from filing to permit and 49 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 6, 2019Completed
final sign-off Sep 2019
1641 31st Avrevision to 201802131126 minor change to interior stair and bathroom in 1st floor
Details
Permit
201908068061
Status
complete
Filed
Aug 6, 2019
Permit issued
Sep 13, 2019
Final sign-off
Sep 26, 2019
Address
1641 31st Av

revision to 201802131126 minor change to interior stair and bathroom in 1st floor

Open the permit page

Feb 13, 2018Completed
final sign-off Sep 2019
1641 31st Av1st fl add family rm, 2 bedrms, 2 full baths, laundry rm, wetbar, replace e interior stair with new open stair
Details
Permit
201802131126
Status
complete
Filed
Feb 13, 2018
Permit issued
Feb 21, 2019
Final sign-off
Sep 26, 2019
Declared cost
$60,000
Address
1641 31st Av

1st fl add family rm, 2 bedrms, 2 full baths, laundry rm, wetbar, replace e interior stair with new open stair

Open the permit page

$60,000
May 21, 2015Never finaled
issued May 2015, no final
135 Madrone Avrepair existing front stairs within same inkind
Details
Permit
201505216936
Status
issued
Filed
May 21, 2015
Permit issued
May 21, 2015
Declared cost
$3,000
Address
135 Madrone Av

repair existing front stairs within same inkind

Open the permit page

$3,000
Apr 16, 2015Completed
final sign-off May 2015
780 47th Avput window unit in the existing opening at the top of the exterior stair on the right side of building; visible from street.
Details
Permit
201504163865
Status
complete
Filed
Apr 16, 2015
Permit issued
Apr 17, 2015
Final sign-off
May 11, 2015
Declared cost
$1,000
Address
780 47th Av

put window unit in the existing opening at the top of the exterior stair on the right side of building; visible from street.

Open the permit page

$1,000
Mar 28, 2014Completed
final sign-off Dec 2014
2516 16th Avg/f:constr2(n)bedrms&clsets,(n)family rm,(n)study rm,2(n)bathrms,remv(e)slab&pour(n)slab,remv(e)post,reloc(e)furnace,wtr heater,insl(n)4x3wndw,reloc stair to2/f,reloc(e)wndw&dr@so wall.2/f:reloc kitcn,2(n)baths,reloc(e)stair to g/f,remv bearing wall@dining rm,reloc&repl(e)windw&add(n)wnd@bath.
Details
Permit
201403281914
Status
complete
Filed
Mar 28, 2014
Permit issued
May 7, 2014
Final sign-off
Dec 1, 2014
Declared cost
$55,000
Address
2516 16th Av

g/f:constr2(n)bedrms&clsets,(n)family rm,(n)study rm,2(n)bathrms,remv(e)slab&pour(n)slab,remv(e)post,reloc(e)furnace,wtr heater,insl(n)4x3wndw,reloc stair to2/f,reloc(e)wndw&dr@so wall.2/f:reloc kitcn,2(n)baths,reloc(e)stair to g/f,remv bearing wall@dining rm,reloc&repl(e)windw&add(n)wnd@bath.

Open the permit page

$55,000
Oct 16, 2013Never finaled
issued Oct 2013, no final
1510 22nd Avconstruct new full bathroom at ground floor. re-construct staircase at (e) lightwell
Details
Permit
201310169425
Status
issued
Filed
Oct 16, 2013
Permit issued
Oct 16, 2013
Declared cost
$9,000
Address
1510 22nd Av

construct new full bathroom at ground floor. re-construct staircase at (e) lightwell

Open the permit page

$9,000
May 31, 2013Completed
final sign-off Jun 2013
1918 Mission Stprovide guard rails as required and provide additional handrail support hard ware at the handrail at the top of the stair run. to comply with nov 201399512
Details
Permit
201305318397
Status
complete
Filed
May 31, 2013
Permit issued
May 31, 2013
Final sign-off
Jun 10, 2013
Declared cost
$1,200
Address
1918 Mission St

provide guard rails as required and provide additional handrail support hard ware at the handrail at the top of the stair run. to comply with nov 201399512

Open the permit page

$1,200
Jun 6, 2012Completed
final sign-off Jul 2012
1246 32nd Avrepair stairs less than 50% at front.
Details
Permit
201206061940
Status
complete
Filed
Jun 6, 2012
Permit issued
Jun 6, 2012
Final sign-off
Jul 10, 2012
Declared cost
$4,000
Address
1246 32nd Av

repair stairs less than 50% at front.

Open the permit page

$4,000
Feb 24, 2010Never finaled
issued Feb 2010, no final
431 26th Avas built plans: 1) relocate storage room at first floor. 2) relocate stairway from 1st thru 4th floor level. referenced to bpa #200309265941.
Details
Permit
201002247093
Status
issued
Filed
Feb 24, 2010
Permit issued
Feb 25, 2010
Declared cost
$3,000
Address
431 26th Av

as built plans: 1) relocate storage room at first floor. 2) relocate stairway from 1st thru 4th floor level. referenced to bpa #200309265941.

Open the permit page

$3,000
Feb 2, 2010Completed
final sign-off Mar 2010
1295 30th Avrepair stairs @ front less than 50% of total structure in-kind with brick or granite steps.
Details
Permit
201002025747
Status
complete
Filed
Feb 2, 2010
Permit issued
Feb 2, 2010
Final sign-off
Mar 23, 2010
Declared cost
$3,000
Address
1295 30th Av

repair stairs @ front less than 50% of total structure in-kind with brick or granite steps.

Open the permit page

$3,000
Oct 19, 2009Completed
final sign-off Jan 2010
231 Holloway Avconvert existing dining room to new bedroom & remove non-bearing wall on (e) 2nd floor. replace (e) damaged handrail & walls of (e) front stairs in kind (e) steps to remains.
Details
Permit
200910199206
Status
complete
Filed
Oct 19, 2009
Permit issued
Oct 19, 2009
Final sign-off
Jan 5, 2010
Declared cost
$10,000
Address
231 Holloway Av

convert existing dining room to new bedroom & remove non-bearing wall on (e) 2nd floor. replace (e) damaged handrail & walls of (e) front stairs in kind (e) steps to remains.

Open the permit page

$10,000
Jun 30, 2004Completed
final sign-off Sep 2004
3115 Irving Ststairs less than 50 percent below replace w/o drawings, repair front entrance staircases. repair dry
Details
Permit
200406307668
Status
complete
Filed
Jun 30, 2004
Permit issued
Jun 30, 2004
Final sign-off
Sep 1, 2004
Declared cost
$12,000
Address
3115 Irving St

stairs less than 50 percent below replace w/o drawings, repair front entrance staircases. repair dry

Open the permit page

$12,000