Back to bathroom remodel contractors
Soon Ye Louie/Dba Soon Louie Const.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Dec 2022
- Last 24 months
- 0 permits filed
78 permits since 2000: 66 completed, 12 never finaled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 40 completed, 7 never finaled. Typically 3 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2022 | Completed final sign-off Feb 2023 | 51 Fortuna Av | interior alteration of existing apartment unit. including conversion of existing master bedroom closet to master bathroom and new closet at existing master bedroom.Details
interior alteration of existing apartment unit. including conversion of existing master bedroom closet to master bathroom and new closet at existing master bedroom. | $26,600 |
| Sep 14, 2021 | Completed final sign-off Aug 2022 | 117 Stanyan St | interior remodel: 1/f: add bedroom, family room, (2) full baths, exercise room w/wet bar; 2/f: relocate kitchen, add study room, bathroom, & powder roomDetails
interior remodel: 1/f: add bedroom, family room, (2) full baths, exercise room w/wet bar; 2/f: relocate kitchen, add study room, bathroom, & powder room | $110,000 |
| Aug 6, 2019 | Completed final sign-off Sep 2019 | 1641 31st Av | revision to 201802131126 minor change to interior stair and bathroom in 1st floorDetails
revision to 201802131126 minor change to interior stair and bathroom in 1st floor | |
| Feb 13, 2018 | Completed final sign-off Sep 2019 | 1641 31st Av | 1st fl add family rm, 2 bedrms, 2 full baths, laundry rm, wetbar, replace e interior stair with new open stairDetails
1st fl add family rm, 2 bedrms, 2 full baths, laundry rm, wetbar, replace e interior stair with new open stair | $60,000 |
| Nov 28, 2017 | Completed final sign-off Apr 2018 | 931 Athens St | add 2 each bathrooms, 2 each bedrooms, 1 each laundry rm on 1st flDetails
add 2 each bathrooms, 2 each bedrooms, 1 each laundry rm on 1st fl | $40,000 |
| Oct 23, 2017 | Completed final sign-off Jan 2018 | 210 Broderick St | unit #1: remodel one kitchen and one bathroom on the 2nd floorDetails
unit #1: remodel one kitchen and one bathroom on the 2nd floor | $20,000 |
| Sep 14, 2017 | Completed final sign-off Jan 2018 | 210 Broderick St | apt 4: remodel kitchen and 2 bathrooms on the 3/f. replacfe the dry wall. replace furnace.Details
apt 4: remodel kitchen and 2 bathrooms on the 3/f. replacfe the dry wall. replace furnace. | $40,000 |
| Apr 18, 2017 | Completed final sign-off Jul 2017 | 647 Masonic Av | interior remodel on 2/f, add 1 bathroom.Details
interior remodel on 2/f, add 1 bathroom. | $10,000 |
| Jan 13, 2017 | Completed final sign-off Jul 2017 | 647 Masonic Av | one kitchen & one bathroom in kind remodel, r&r in kind 6000 sf of wall/ceiling coverings, new insulation for all exterior walls/ceilingsDetails
one kitchen & one bathroom in kind remodel, r&r in kind 6000 sf of wall/ceiling coverings, new insulation for all exterior walls/ceilings | $30,000 |
| Dec 29, 2016 | Completed final sign-off Jun 2017 | 834 Niagara Av | remodel kitchen and bathroom on 2nd flr. remove and reinstall sheetrock on 2nd flrDetails
remodel kitchen and bathroom on 2nd flr. remove and reinstall sheetrock on 2nd flr | $20,000 |
| Dec 23, 2016 | Completed final sign-off Mar 2017 | 152 Marview Wy | remodel (e) kitchen & bathroom on 2nd flr same locationDetails
remodel (e) kitchen & bathroom on 2nd flr same location | $20,000 |
| Aug 12, 2016 | Completed final sign-off Jan 2017 | 2027 18th Av | inerior remodeling: add 2 bedrooms, 1 bathroom and one playroon on 1st flr, remodel kitchen & 2 bathrooms on 2nd flr.Details
inerior remodeling: add 2 bedrooms, 1 bathroom and one playroon on 1st flr, remodel kitchen & 2 bathrooms on 2nd flr. | $60,000 |
| Jun 9, 2016 | Completed final sign-off Oct 2016 | 1535 17th Av | interior remodeling on 2nd floor - remodel 2 (e) bathrooms and 1 kitchen. new partition way; add (n) half-bath.Details
interior remodeling on 2nd floor - remodel 2 (e) bathrooms and 1 kitchen. new partition way; add (n) half-bath. | $20,000 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 1931 28th Av | interior remodel of 1st floor. relocate bathroom, new storage room, partition walls, new washer & dryer, relocate water heaterDetails
interior remodel of 1st floor. relocate bathroom, new storage room, partition walls, new washer & dryer, relocate water heater | $30,000 |
| Mar 16, 2016 | Completed final sign-off Dec 2016 | 1962 23rd Av | add one bedroom, one family room and one bathroom on ground floor.Details
add one bedroom, one family room and one bathroom on ground floor. | $40,000 |
| Feb 26, 2016 | Completed final sign-off Aug 2016 | 2375 28th Av | remodel of existing bathroom on 2nd floor, no change in wall and opening layout, no lighting changeDetails
remodel of existing bathroom on 2nd floor, no change in wall and opening layout, no lighting change | $3,000 |
| Feb 24, 2016 | Completed final sign-off Aug 2016 | 2375 28th Av | interior alteration on 1st and 2nd floor.add 1 new bathroom. relocate 2 ea. bathroom. new deck at the rear.Details
interior alteration on 1st and 2nd floor.add 1 new bathroom. relocate 2 ea. bathroom. new deck at the rear. | $80,000 |
| Feb 2, 2016 | Completed final sign-off Jul 2016 | 1630 30th Av | relocate (e) full bath on 1st floor; add family room & one bedroom on 1st floor; remodel kitchen & (e) full bath on 2nd floor; add one full bath on 2nd floor per plan.Details
relocate (e) full bath on 1st floor; add family room & one bedroom on 1st floor; remodel kitchen & (e) full bath on 2nd floor; add one full bath on 2nd floor per plan. | $40,000 |
| Jan 8, 2016 | Completed final sign-off Apr 2016 | 1403 27th Av | construct new bathroom & closet at 2/fDetails
construct new bathroom & closet at 2/f | $12,000 |
| Dec 8, 2015 | Completed final sign-off Mar 2016 | 1420 11th Av | add 1 one powder on 2nd floor per plan. add 1 full bathroom on 3rd floor per planDetails
add 1 one powder on 2nd floor per plan. add 1 full bathroom on 3rd floor per plan | $20,000 |
| Nov 12, 2015 | Completed final sign-off Apr 2016 | 1947 Funston Av | 2/f: remodel bathroom & kitchen. no structural work.Details
2/f: remodel bathroom & kitchen. no structural work. | $12,000 |
| Jul 30, 2015 | Completed final sign-off Sep 2015 | 610 38th Av | 2nd floor: replace existing bathtub, sink, toilet and tiles in upstairs bathroom. no walls to be moved. no structuralDetails
2nd floor: replace existing bathtub, sink, toilet and tiles in upstairs bathroom. no walls to be moved. no structural | $3,000 |
| May 29, 2015 | Completed final sign-off Sep 2015 | 2471 16th Av | add one family room, one living room, one bathroom on 1st flroor per plan.Details
add one family room, one living room, one bathroom on 1st flroor per plan. | $20,000 |
| Mar 18, 2015 | Completed final sign-off Feb 2016 | 2446 46th Av | remodel bathroom - replace patio doors in rear bedrooms in-kind. remove patio doors in front facade of home. change to new windows. all work on 2nd floor only.Details
remodel bathroom - replace patio doors in rear bedrooms in-kind. remove patio doors in front facade of home. change to new windows. all work on 2nd floor only. | $15,000 |
| Dec 11, 2014 | Completed final sign-off Feb 2015 | 417 Paris St | replace the downstairs bathroom with new sink, toilet and flooring (tiles)Details
replace the downstairs bathroom with new sink, toilet and flooring (tiles) | $3,000 |
| Dec 9, 2014 | Completed final sign-off Aug 2015 | 135 Madrone Av | 3/f- construct (n) bathroom at bedroom 2, replace in kind (e) window with tempered glass, relocate tub @ (e) bathroom 1.Details
3/f- construct (n) bathroom at bedroom 2, replace in kind (e) window with tempered glass, relocate tub @ (e) bathroom 1. | $9,000 |
| Aug 20, 2014 | Never finaled issued Sep 2014, no final | 1154 Plymouth Av | ref app#201407302513 for bath and kitchen remodel. provide plans of lower unit at 1154 plymouth ave. to document layout and floor plan. close off window installed without permit.Details
ref app#201407302513 for bath and kitchen remodel. provide plans of lower unit at 1154 plymouth ave. to document layout and floor plan. close off window installed without permit. | |
| Aug 14, 2014 | Never finaled issued Aug 2014, no final | 1746 28th Av | level 1: add entry foyer and laundry room, level 2: demolish existing lightwell, and powder bathDetails
level 1: add entry foyer and laundry room, level 2: demolish existing lightwell, and powder bath | $18,000 |
| Jul 30, 2014 | Never finaled issued Jul 2014, no final | 1154 Plymouth Av | to comply w/ complaint#201486231. remodel kitchen & bathroom.Details
to comply w/ complaint#201486231. remodel kitchen & bathroom. | $20,000 |
| May 13, 2014 | Completed final sign-off Oct 2014 | 2654 21st Av | legalize existing recreation room & add one new full bath at ground floor, relcoate (e) washer & dryer. no structural work, all work on ground floor.Details
legalize existing recreation room & add one new full bath at ground floor, relcoate (e) washer & dryer. no structural work, all work on ground floor. | $4,000 |
| Apr 15, 2014 | Never finaled issued May 2014, no final | 2129 18th Av | remodel ground floor - add entertainment room, bedroom, media room, & bathroom, laundry room, foyer. remodle kitchen & guest room on 2nd floor.Details
remodel ground floor - add entertainment room, bedroom, media room, & bathroom, laundry room, foyer. remodle kitchen & guest room on 2nd floor. | $124,000 |
| Mar 28, 2014 | Completed final sign-off Dec 2014 | 2516 16th Av | g/f:constr2(n)bedrms&clsets,(n)family rm,(n)study rm,2(n)bathrms,remv(e)slab&pour(n)slab,remv(e)post,reloc(e)furnace,wtr heater,insl(n)4x3wndw,reloc stair to2/f,reloc(e)wndw&dr@so wall.2/f:reloc kitcn,2(n)baths,reloc(e)stair to g/f,remv bearing wall@dining rm,reloc&repl(e)windw&add(n)wnd@bath.Details
g/f:constr2(n)bedrms&clsets,(n)family rm,(n)study rm,2(n)bathrms,remv(e)slab&pour(n)slab,remv(e)post,reloc(e)furnace,wtr heater,insl(n)4x3wndw,reloc stair to2/f,reloc(e)wndw&dr@so wall.2/f:reloc kitcn,2(n)baths,reloc(e)stair to g/f,remv bearing wall@dining rm,reloc&repl(e)windw&add(n)wnd@bath. | $55,000 |
| Dec 16, 2013 | Completed final sign-off Oct 2014 | 135 Madrone Av | ground fl, remove (e) half bath, relocate (e) furnace to garage, (n) 2 bedrms & (n) 2 bathrms, replace (e) window in-kind. convert portion of(e) family rm to 2 (n) laundry rm. 2nd fl, (n) deck @ rear of bldg. remove (e) wall dividing kitchen & dining. (n) 6'door & window. close off (e)window(e)door,Details
ground fl, remove (e) half bath, relocate (e) furnace to garage, (n) 2 bedrms & (n) 2 bathrms, replace (e) window in-kind. convert portion of(e) family rm to 2 (n) laundry rm. 2nd fl, (n) deck @ rear of bldg. remove (e) wall dividing kitchen & dining. (n) 6'door & window. close off (e)window(e)door, | $15,000 |
| Dec 6, 2013 | Never finaled issued Jun 2014, no final | 161 23rd Av | 1)construct new elevator shaft from ground floor to 3rd floor. relocate extg furnace and replace extg water heater with new tankless. remove extg laundry room at 2nd floor. remove extg full bath at 3rd floor and construct new half bath.Details
1)construct new elevator shaft from ground floor to 3rd floor. relocate extg furnace and replace extg water heater with new tankless. remove extg laundry room at 2nd floor. remove extg full bath at 3rd floor and construct new half bath. | $9,000 |
| Oct 16, 2013 | Never finaled issued Oct 2013, no final | 1510 22nd Av | construct new full bathroom at ground floor. re-construct staircase at (e) lightwellDetails
construct new full bathroom at ground floor. re-construct staircase at (e) lightwell | $9,000 |
| Sep 19, 2013 | Never finaled issued Sep 2013, no final | 2223 20th Av | add power room. remodel kitchen on 2nd fl. add bedroom, bath, mudroom and storage on 1st flDetails
add power room. remodel kitchen on 2nd fl. add bedroom, bath, mudroom and storage on 1st fl | $58,000 |
| Apr 26, 2013 | Completed final sign-off Jun 2013 | 1641 31st Av | alteration to (e) 2nd floor-remodel (e) toilet room with new sink, replace (e) sheetrock & flooring. enlarge & remodel (e) bathroom with new toilet & shower room. replace (e) sheetrock & flooringDetails
alteration to (e) 2nd floor-remodel (e) toilet room with new sink, replace (e) sheetrock & flooring. enlarge & remodel (e) bathroom with new toilet & shower room. replace (e) sheetrock & flooring | $10,000 |
| Jul 9, 2012 | Completed final sign-off Jan 2013 | 462 Ulloa St | replace all upstairs floor windows, remodel kitchen and two full bathroom. no structural work. window u-factor is less than 0.40. window in rear, (3) and side (1) side window. vinyl slider.Details
replace all upstairs floor windows, remodel kitchen and two full bathroom. no structural work. window u-factor is less than 0.40. window in rear, (3) and side (1) side window. vinyl slider. | $25,000 |
| Dec 21, 2011 | Completed final sign-off Mar 2012 | 535 Ulloa St | 1. add one family room, bedroom and bathroom on 1st floor per plan. 2. add new windows (3) on 1st floor at front.Details
1. add one family room, bedroom and bathroom on 1st floor per plan. 2. add new windows (3) on 1st floor at front. | $30,000 |
| Apr 25, 2011 | Completed final sign-off Jun 2011 | 19 Florentine Av | all works on 2nd. floor only; to combine (e) two bedrooms into master bedroom with (n) full bathroom. remodel (e) kitchen, rewire elec. in two bedroom.Details
all works on 2nd. floor only; to combine (e) two bedrooms into master bedroom with (n) full bathroom. remodel (e) kitchen, rewire elec. in two bedroom. | $30,000 |
| Jan 6, 2011 | Completed final sign-off Feb 2011 | 775 33rd Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $8,000 |
| May 17, 2010 | Completed final sign-off Sep 2010 | 22 Howth St | to add two bedroom. one full bathroom & laundry room on (e) ground floor per plan.Details
to add two bedroom. one full bathroom & laundry room on (e) ground floor per plan. | $30,000 |
| Jan 4, 2010 | Completed final sign-off Jul 2010 | 297 Maynard St | add one bedroom, one playroom/laundry & one full bathroom on existing ground floor.Details
add one bedroom, one playroom/laundry & one full bathroom on existing ground floor. | $25,000 |
| May 27, 2008 | Completed final sign-off Oct 2008 | 1100 Brussels St | replace ex. foundation footing on the left side of ex. garage and at the rear portion of bldg. replace roof framing over ex. playroom and bathroom at the rear portion of the bldg. remodel ex. kitchen and 2 bathrooms on the 2nd floor.Details
replace ex. foundation footing on the left side of ex. garage and at the rear portion of bldg. replace roof framing over ex. playroom and bathroom at the rear portion of the bldg. remodel ex. kitchen and 2 bathrooms on the 2nd floor. | $68,000 |
| May 1, 2007 | Completed final sign-off Jun 2007 | 673 Morse St | remodel existing kitchen and bathroom on existing 2nd floor per plan.Details
remodel existing kitchen and bathroom on existing 2nd floor per plan. | $12,000 |
| Feb 14, 2006 | Completed final sign-off Apr 2006 | 1717 Yosemite Av | alteration to extg 2nd floor per plan: 1) relocate extg kchn, 2) add one full bath room, 3)remodel extg bath room, 4) to add one new bed room, 5)covert extg kchn to new bed roomDetails
alteration to extg 2nd floor per plan: 1) relocate extg kchn, 2) add one full bath room, 3)remodel extg bath room, 4) to add one new bed room, 5)covert extg kchn to new bed room | $18,000 |
| Sep 16, 2004 | Completed final sign-off Feb 2005 | 1295 30th Av | toadd two bedroom, one full bathroom, one storage and laundry are on existing grd flr per plan.Details
toadd two bedroom, one full bathroom, one storage and laundry are on existing grd flr per plan. | $25,000 |