Back to kitchen remodel contractors
Soon Ye Louie/Dba Soon Louie Const.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Dec 2022
- Last 24 months
- 0 permits filed
78 permits since 2000: 66 completed, 12 never finaled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 17 completed, 5 never finaled. Typically 1 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2021 | Completed final sign-off Aug 2022 | 117 Stanyan St | interior remodel: 1/f: add bedroom, family room, (2) full baths, exercise room w/wet bar; 2/f: relocate kitchen, add study room, bathroom, & powder roomDetails
interior remodel: 1/f: add bedroom, family room, (2) full baths, exercise room w/wet bar; 2/f: relocate kitchen, add study room, bathroom, & powder room | $110,000 |
| Oct 23, 2017 | Completed final sign-off Jan 2018 | 210 Broderick St | unit #1: remodel one kitchen and one bathroom on the 2nd floorDetails
unit #1: remodel one kitchen and one bathroom on the 2nd floor | $20,000 |
| Sep 14, 2017 | Completed final sign-off Jan 2018 | 210 Broderick St | apt 4: remodel kitchen and 2 bathrooms on the 3/f. replacfe the dry wall. replace furnace.Details
apt 4: remodel kitchen and 2 bathrooms on the 3/f. replacfe the dry wall. replace furnace. | $40,000 |
| Jan 13, 2017 | Completed final sign-off Jul 2017 | 647 Masonic Av | one kitchen & one bathroom in kind remodel, r&r in kind 6000 sf of wall/ceiling coverings, new insulation for all exterior walls/ceilingsDetails
one kitchen & one bathroom in kind remodel, r&r in kind 6000 sf of wall/ceiling coverings, new insulation for all exterior walls/ceilings | $30,000 |
| Dec 29, 2016 | Completed final sign-off Jun 2017 | 834 Niagara Av | remodel kitchen and bathroom on 2nd flr. remove and reinstall sheetrock on 2nd flrDetails
remodel kitchen and bathroom on 2nd flr. remove and reinstall sheetrock on 2nd flr | $20,000 |
| Dec 23, 2016 | Completed final sign-off Mar 2017 | 152 Marview Wy | remodel (e) kitchen & bathroom on 2nd flr same locationDetails
remodel (e) kitchen & bathroom on 2nd flr same location | $20,000 |
| Aug 12, 2016 | Completed final sign-off Jan 2017 | 2027 18th Av | inerior remodeling: add 2 bedrooms, 1 bathroom and one playroon on 1st flr, remodel kitchen & 2 bathrooms on 2nd flr.Details
inerior remodeling: add 2 bedrooms, 1 bathroom and one playroon on 1st flr, remodel kitchen & 2 bathrooms on 2nd flr. | $60,000 |
| Jun 9, 2016 | Completed final sign-off Oct 2016 | 1535 17th Av | interior remodeling on 2nd floor - remodel 2 (e) bathrooms and 1 kitchen. new partition way; add (n) half-bath.Details
interior remodeling on 2nd floor - remodel 2 (e) bathrooms and 1 kitchen. new partition way; add (n) half-bath. | $20,000 |
| Feb 2, 2016 | Completed final sign-off Jul 2016 | 1630 30th Av | relocate (e) full bath on 1st floor; add family room & one bedroom on 1st floor; remodel kitchen & (e) full bath on 2nd floor; add one full bath on 2nd floor per plan.Details
relocate (e) full bath on 1st floor; add family room & one bedroom on 1st floor; remodel kitchen & (e) full bath on 2nd floor; add one full bath on 2nd floor per plan. | $40,000 |
| Nov 12, 2015 | Completed final sign-off Apr 2016 | 1947 Funston Av | 2/f: remodel bathroom & kitchen. no structural work.Details
2/f: remodel bathroom & kitchen. no structural work. | $12,000 |
| Apr 16, 2015 | Never finaled issued Apr 2015, no final | 2006 18th Av | kitchen remodel - replace cabinets, dishwasher - to comply with cec150.0(k)3Details
kitchen remodel - replace cabinets, dishwasher - to comply with cec150.0(k)3 | $5,000 |
| Aug 20, 2014 | Never finaled issued Sep 2014, no final | 1154 Plymouth Av | ref app#201407302513 for bath and kitchen remodel. provide plans of lower unit at 1154 plymouth ave. to document layout and floor plan. close off window installed without permit.Details
ref app#201407302513 for bath and kitchen remodel. provide plans of lower unit at 1154 plymouth ave. to document layout and floor plan. close off window installed without permit. | |
| Jul 30, 2014 | Never finaled issued Jul 2014, no final | 1154 Plymouth Av | to comply w/ complaint#201486231. remodel kitchen & bathroom.Details
to comply w/ complaint#201486231. remodel kitchen & bathroom. | $20,000 |
| Apr 15, 2014 | Never finaled issued May 2014, no final | 2129 18th Av | remodel ground floor - add entertainment room, bedroom, media room, & bathroom, laundry room, foyer. remodle kitchen & guest room on 2nd floor.Details
remodel ground floor - add entertainment room, bedroom, media room, & bathroom, laundry room, foyer. remodle kitchen & guest room on 2nd floor. | $124,000 |
| Dec 16, 2013 | Completed final sign-off Oct 2014 | 135 Madrone Av | ground fl, remove (e) half bath, relocate (e) furnace to garage, (n) 2 bedrms & (n) 2 bathrms, replace (e) window in-kind. convert portion of(e) family rm to 2 (n) laundry rm. 2nd fl, (n) deck @ rear of bldg. remove (e) wall dividing kitchen & dining. (n) 6'door & window. close off (e)window(e)door,Details
ground fl, remove (e) half bath, relocate (e) furnace to garage, (n) 2 bedrms & (n) 2 bathrms, replace (e) window in-kind. convert portion of(e) family rm to 2 (n) laundry rm. 2nd fl, (n) deck @ rear of bldg. remove (e) wall dividing kitchen & dining. (n) 6'door & window. close off (e)window(e)door, | $15,000 |
| Sep 19, 2013 | Never finaled issued Sep 2013, no final | 2223 20th Av | add power room. remodel kitchen on 2nd fl. add bedroom, bath, mudroom and storage on 1st flDetails
add power room. remodel kitchen on 2nd fl. add bedroom, bath, mudroom and storage on 1st fl | $58,000 |
| Jul 9, 2012 | Completed final sign-off Jan 2013 | 462 Ulloa St | replace all upstairs floor windows, remodel kitchen and two full bathroom. no structural work. window u-factor is less than 0.40. window in rear, (3) and side (1) side window. vinyl slider.Details
replace all upstairs floor windows, remodel kitchen and two full bathroom. no structural work. window u-factor is less than 0.40. window in rear, (3) and side (1) side window. vinyl slider. | $25,000 |
| May 4, 2011 | Completed final sign-off Jun 2011 | 3448 Balboa St | as built plan sheet a-2 and a-3: in second, third and four floor for unit#1,2,3 - relocate kitchen per plan.Details
as built plan sheet a-2 and a-3: in second, third and four floor for unit#1,2,3 - relocate kitchen per plan. | |
| Apr 25, 2011 | Completed final sign-off Jun 2011 | 19 Florentine Av | all works on 2nd. floor only; to combine (e) two bedrooms into master bedroom with (n) full bathroom. remodel (e) kitchen, rewire elec. in two bedroom.Details
all works on 2nd. floor only; to combine (e) two bedrooms into master bedroom with (n) full bathroom. remodel (e) kitchen, rewire elec. in two bedroom. | $30,000 |
| Jan 6, 2011 | Completed final sign-off Feb 2011 | 775 33rd Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $8,000 |
| May 27, 2008 | Completed final sign-off Oct 2008 | 1100 Brussels St | replace ex. foundation footing on the left side of ex. garage and at the rear portion of bldg. replace roof framing over ex. playroom and bathroom at the rear portion of the bldg. remodel ex. kitchen and 2 bathrooms on the 2nd floor.Details
replace ex. foundation footing on the left side of ex. garage and at the rear portion of bldg. replace roof framing over ex. playroom and bathroom at the rear portion of the bldg. remodel ex. kitchen and 2 bathrooms on the 2nd floor. | $68,000 |
| May 1, 2007 | Completed final sign-off Jun 2007 | 673 Morse St | remodel existing kitchen and bathroom on existing 2nd floor per plan.Details
remodel existing kitchen and bathroom on existing 2nd floor per plan. | $12,000 |