Block 6981, lot 044
231 Holloway Ave
- City’s use
- Single Family Residential
- Built
- 1913
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,343 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 231 Holloway Av | Soon Ye Louie/Dba Soon Louie Const. | convert existing dining room to new bedroom & remove non-bearing wall on (e) 2nd floor. replace (e) damaged handrail & walls of (e) front stairs in kind (e) steps to remains.Details
convert existing dining room to new bedroom & remove non-bearing wall on (e) 2nd floor. replace (e) damaged handrail & walls of (e) front stairs in kind (e) steps to remains. | $10,000 |
| Mar 25, 2008 | Never finaled issued Mar 2008, no final | 231 Holloway Av | All Four Season's Roofing | reroofingDetails
reroofing | $5,500 |
| Mar 7, 2008 | Never finaled issued Mar 2008, no final | 231 Holloway Av | street spaceDetails
street space | ||
| Feb 20, 2008 | Completed final sign-off Jul 2008 | 231 Holloway Av | Modern Design Construction | remodel (e) toilet room on 1st fl. bathroom & kitchen (2nd fl. replace existing front stairs, replace (e) rear stair. repair foundation. (e) front stairs are linear, replace back stairs are "l" sheaped plan. the rear (n) stairs has a new deck.Details
remodel (e) toilet room on 1st fl. bathroom & kitchen (2nd fl. replace existing front stairs, replace (e) rear stair. repair foundation. (e) front stairs are linear, replace back stairs are "l" sheaped plan. the rear (n) stairs has a new deck. | $20,000 |
| Jan 16, 2008 | Completed final sign-off Jul 2008 | 231 Holloway Av | Modern Design Construction | demolition and disposal of interior drywall in living room, bedroom, dining room. removal of existing carpet and hardwood flooring. install new typboard over existing walls locations. use 5/8 type x gyp at walls less than 5 ft from property line. his-nov 200721711.Details
demolition and disposal of interior drywall in living room, bedroom, dining room. removal of existing carpet and hardwood flooring. install new typboard over existing walls locations. use 5/8 type x gyp at walls less than 5 ft from property line. his-nov 200721711. | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Modern Design Construction (2), All Four Season's Roofing, Soon Ye Louie/Dba Soon Louie Const.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.