Back to kitchen remodel contractors
Silver Arrows Paint Restoration
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Nov 2023
- Last 24 months
- 0 permits filed
71 permits since 2000: 45 completed, 1 in progress, 18 never finaled, 7 expired or cancelled.
Of the 18 never-finaled permits, 1 is 3 to 5 years old, 15 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
29 kitchen remodel permits: 21 completed, 8 never finaled. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2022 | Completed final sign-off Nov 2022 | 455 Locust St | remodel one unit permiting sheet rock, insulation, electrical and plumbing, no walls removed, one bathroom, one kitchen 2 bedrooms, living room and hallway. use 5/8" type x min at walls and ceilings between other units.Details
remodel one unit permiting sheet rock, insulation, electrical and plumbing, no walls removed, one bathroom, one kitchen 2 bedrooms, living room and hallway. use 5/8" type x min at walls and ceilings between other units. | $30,000 |
| Aug 17, 2022 | Completed final sign-off Jul 2023 | 167 Belvedere St | remodel of kitchen and bathroom. upgrade electrical wiring and electrical panel, remove lath and plaster and replace with sheetrock walls and ceilings. kitchen & bathroom remodel in-kind. no wall alteration.Details
remodel of kitchen and bathroom. upgrade electrical wiring and electrical panel, remove lath and plaster and replace with sheetrock walls and ceilings. kitchen & bathroom remodel in-kind. no wall alteration. | $75,000 |
| Jul 21, 2022 | Completed final sign-off Aug 2023 | 163 Belvedere St | (e) renewed unit, permiting sheet rock, insullation, electrical, plumbing and mech. no walls moved. two bathroom and one kitchen remodel.Details
(e) renewed unit, permiting sheet rock, insullation, electrical, plumbing and mech. no walls moved. two bathroom and one kitchen remodel. | $15,800 |
| Mar 26, 2021 | Completed final sign-off Oct 2022 | 453 Locust St | upgrading electrical panel, bring 1 kitchen to code and install lighting throughout the home, 1 bathroom remodel. no new wakk & no existing wall relocations. new lighting shall comple with cec 150.0(k)3 & (k)5. all new plumbing fixtures sall be remain at same location.Details
upgrading electrical panel, bring 1 kitchen to code and install lighting throughout the home, 1 bathroom remodel. no new wakk & no existing wall relocations. new lighting shall comple with cec 150.0(k)3 & (k)5. all new plumbing fixtures sall be remain at same location. | $50,000 |
| Mar 26, 2021 | Completed final sign-off Sep 2022 | 451 Locust St | remodel of 1 kitchen and 1 bthroom, upgrade electrical panel & cosmetic work. no new wall & no existing wall relocation. all new plumbing fixtures to be remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
remodel of 1 kitchen and 1 bthroom, upgrade electrical panel & cosmetic work. no new wall & no existing wall relocation. all new plumbing fixtures to be remain at same location. new lighting shall comply with cec 150.0(k)3 & (k)5. | $75,000 |
| Mar 26, 2021 | Completed final sign-off Sep 2022 | 457 Locust St | remodel of 1 full kitchen and 1 bathroom, and upgrade electrical panel. lighting shall comply with cec 150.0(k)3 & (k)5. no new wall & no (e) wall relocation. new plumbing fixtures to be remain at same location.Details
remodel of 1 full kitchen and 1 bathroom, and upgrade electrical panel. lighting shall comply with cec 150.0(k)3 & (k)5. no new wall & no (e) wall relocation. new plumbing fixtures to be remain at same location. | $75,000 |
| Nov 24, 2020 | Completed final sign-off Aug 2023 | 165 Belvedere St | 2nd flr unit - remodel of kitchen and bathroom, upgrade electrical panelDetails
2nd flr unit - remodel of kitchen and bathroom, upgrade electrical panel | $70,000 |
| May 6, 2020 | Never finaled issued May 2020, no final | 1477 Guerrero St | unit #1477 & #1479: remodel kitchen and bathroom, tile work, and painting.like-for-like.Details
unit #1477 & #1479: remodel kitchen and bathroom, tile work, and painting.like-for-like. | $80,000 |
| Dec 21, 2018 | Completed final sign-off Feb 2019 | 925 Corbett Av | unit 201. remodel of 2 full bathrooms and kitchen, no alterations to walls or ceilings. replacing shower valve trims, tile, kitchen cabinets, faucets, lighting. bathroom 1: 40 sqft. bathroom 2: 40 sqft. kitchen: 100 sqft.Details
unit 201. remodel of 2 full bathrooms and kitchen, no alterations to walls or ceilings. replacing shower valve trims, tile, kitchen cabinets, faucets, lighting. bathroom 1: 40 sqft. bathroom 2: 40 sqft. kitchen: 100 sqft. | $50,000 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 1863 44th Av | 2nd floor: remove extg bearing wall between kitchen and living room.Details
2nd floor: remove extg bearing wall between kitchen and living room. | $5,000 |
| Aug 1, 2018 | Completed final sign-off Sep 2020 | 650 Hayes St | reconfigur level 1 kitchen and add pantry. reconfigure level 2 kitchen & bath to relocate laundry room. original pa #201609208262.Details
reconfigur level 1 kitchen and add pantry. reconfigure level 2 kitchen & bath to relocate laundry room. original pa #201609208262. | |
| Jul 16, 2018 | Never finaled issued Jul 2018, no final | 1863 44th Av | kitchen and bathroom remodel. upgrade electrical and furnaceDetails
kitchen and bathroom remodel. upgrade electrical and furnace | $50,000 |
| May 25, 2018 | Never finaled issued Dec 2018, no final | 1863 44th Av | legalize illegal in-law unit per ord# 43-14 w/ living room, bath, bedroom, kitchen.Details
legalize illegal in-law unit per ord# 43-14 w/ living room, bath, bedroom, kitchen. | $44,500 |
| May 23, 2018 | Completed final sign-off May 2020 | 159 Wool St | work is on unit 161. convert extg garage to habitable space. replace footings and slab. new interior renovation with 2 bathrooms, kitchen, and 1 bedroom. secure bike parking, new windows on front and curbcut removal. 2 units dwelling to remain as 2 units.Details
work is on unit 161. convert extg garage to habitable space. replace footings and slab. new interior renovation with 2 bathrooms, kitchen, and 1 bedroom. secure bike parking, new windows on front and curbcut removal. 2 units dwelling to remain as 2 units. | $110,000 |
| Jan 2, 2018 | Completed final sign-off Feb 2018 | 145 Santa Rosa Av | update kitchen, new sink, new countertops, and remodel one and half bathroom. new garbage disposal.Details
update kitchen, new sink, new countertops, and remodel one and half bathroom. new garbage disposal. | $2,000 |
| Jul 11, 2017 | Completed final sign-off Sep 2017 | 1700 Gough St | unit 8 (204): kitchen and bathroom remodel - replace cabinets, new flooring, painting, door replacement. all work to be in kind. n/a maherDetails
unit 8 (204): kitchen and bathroom remodel - replace cabinets, new flooring, painting, door replacement. all work to be in kind. n/a maher | $20,000 |
| Apr 18, 2017 | Never finaled issued May 2017, no final | 576 Folsom St | extg elevators control panels and fl. id signage. relocation & configuration of coffee stations & kitchenette. reconf. enlargement of extg toilets-2nd & 3rd fl. new accessibilty toilet & shower at basement level. new private offices & phone booths. no exterior work.Details
extg elevators control panels and fl. id signage. relocation & configuration of coffee stations & kitchenette. reconf. enlargement of extg toilets-2nd & 3rd fl. new accessibilty toilet & shower at basement level. new private offices & phone booths. no exterior work. | $138,000 |
| Dec 15, 2016 | Never finaled issued Nov 2017, no final | 69 Winfield St | repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd.Details
repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd. | $100,000 |
| Dec 13, 2016 | Completed final sign-off Apr 2017 | 231 Coleridge St | 2nd fl bathroom remodel, reconfigure kitchen layout, cabinets, high eff lighting, new closet in e bedroom, new door to switch e closet access. n ew wood floors, french door at rearDetails
2nd fl bathroom remodel, reconfigure kitchen layout, cabinets, high eff lighting, new closet in e bedroom, new door to switch e closet access. n ew wood floors, french door at rear | $50,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 1700 Gough St | #7 - kitchen remodel: cabinet replacement, floor installation & paint. no walls add or removed. n/a maher ordinanceDetails
#7 - kitchen remodel: cabinet replacement, floor installation & paint. no walls add or removed. n/a maher ordinance | $35,000 |
| Oct 7, 2016 | Never finaled issued Oct 2016, no final | 1 Daniel Burnham Ct | kitchen remodel (1) cabinet replacement, tile install & new appliances installation, (1) bathorom remodel, cabinet replacement tile install, & closet ,painting, installation of tile floor in whole aprt.Details
kitchen remodel (1) cabinet replacement, tile install & new appliances installation, (1) bathorom remodel, cabinet replacement tile install, & closet ,painting, installation of tile floor in whole aprt. | $55,000 |
| Oct 7, 2016 | Completed final sign-off Jan 2017 | 1200 Gough St | kitchen remodel, cabinet replacement, tile install & new appliances bathroom remodel (1) , cabinet replacemebt, tile install & paintingDetails
kitchen remodel, cabinet replacement, tile install & new appliances bathroom remodel (1) , cabinet replacemebt, tile install & painting | $30,000 |
| Aug 18, 2016 | Completed final sign-off Jul 2017 | 423 Duboce Av | remodel of kitchen: install new cabinets, tile, contertops, hardwood floors, paint etc. remodel of bathroom: install new cabinets, re route vent ducts, tile floors and wall, and waterproof floor subfloor etc. install new outside door and new window (not visible to the street)Details
remodel of kitchen: install new cabinets, tile, contertops, hardwood floors, paint etc. remodel of bathroom: install new cabinets, re route vent ducts, tile floors and wall, and waterproof floor subfloor etc. install new outside door and new window (not visible to the street) | $65,000 |
| Aug 11, 2016 | Completed final sign-off Dec 2016 | 36 Terra Vista Av | unit #2 remodel kitchen, add new bathroom, new lighting, new flooring, no exterior work. this is a revision to app#201607213026 adding $20k in construction cost (total $80,000.00.Details
unit #2 remodel kitchen, add new bathroom, new lighting, new flooring, no exterior work. this is a revision to app#201607213026 adding $20k in construction cost (total $80,000.00. | $80,000 |
| Jul 21, 2016 | Completed final sign-off Dec 2016 | 36 Terra Vista Av | remodel of kitchen; new cabinets install appliances, counter tops, tile and backsplash, tile floor, etc. remodel of bathroom; new cabinets, tile on shower and floor, shower tub, etc. install new hardwood floor and restore entrance deck. waterproof patio deck roof. work for front deck is less than 50Details
remodel of kitchen; new cabinets install appliances, counter tops, tile and backsplash, tile floor, etc. remodel of bathroom; new cabinets, tile on shower and floor, shower tub, etc. install new hardwood floor and restore entrance deck. waterproof patio deck roof. work for front deck is less than 50 | $60,000 |
| May 6, 2016 | Completed final sign-off Jul 2016 | 355 Buena Vista East Av | kitchen remodel: replace cabinets, countertops and appliances. bathroom remodel: replace cabinets, faucets, sink, install tile on shower area and floor. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
kitchen remodel: replace cabinets, countertops and appliances. bathroom remodel: replace cabinets, faucets, sink, install tile on shower area and floor. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $22,000 |
| Apr 28, 2016 | Completed final sign-off Jul 2016 | 654 23rd Av | remodel of bathroom and kitchen: bathroom - removal of tile and replacing it, replace bath tub, cabinets and paint. kitchen - removal of old cabinets, reframe wall for support and paint counter top, replace tile install on floor and backsplash.Details
remodel of bathroom and kitchen: bathroom - removal of tile and replacing it, replace bath tub, cabinets and paint. kitchen - removal of old cabinets, reframe wall for support and paint counter top, replace tile install on floor and backsplash. | $42,000 |
| Aug 18, 2015 | Completed final sign-off Oct 2016 | 1200 Gough St | unit 9d: install new kitchen cabinets, laminated hard wood floor, carpet. install tile on walk in sshower, bathroom floor, up laundry rm and install 5/8" gyp board where removed. interior partitions - maintain fire rating.Details
unit 9d: install new kitchen cabinets, laminated hard wood floor, carpet. install tile on walk in sshower, bathroom floor, up laundry rm and install 5/8" gyp board where removed. interior partitions - maintain fire rating. | $22,000 |
| Jun 16, 2015 | Completed final sign-off Aug 2015 | 244 Juanita Wy | paint interior at home, install kitchen cabinets, refinish hardwood floors. replace paving stone path 10'x'4', install tile on kitchen.Details
paint interior at home, install kitchen cabinets, refinish hardwood floors. replace paving stone path 10'x'4', install tile on kitchen. | $40,000 |