Block 1252, lot 016
163 Belvedere St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 3,900 sq ft
- Lot
- 2,970 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 163 Belvedere St | Silver Arrows Paint Restoration | partial foundation replacement of common wall on this property (south pl 15' @ front sec)Details
partial foundation replacement of common wall on this property (south pl 15' @ front sec) | $8,000 |
| Mar 16, 2023 | Completed final sign-off Mar 2024 | 163 Belvedere St | Silver Arrows Paint Restoration | revision from original 202211045927 w/plans. consolidate work in permit 202011249586, 202208170689, 202201276736, 202207219046 (no plans)Details
revision from original 202211045927 w/plans. consolidate work in permit 202011249586, 202208170689, 202201276736, 202207219046 (no plans) | $5,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2024 | 163 Belvedere St | Silver Arrows Paint Restoration | level 3 - no work to exterior facade, no horizontal extension to building footprint. removing interior wall at level 3. demolish full bathroom at extg attic space. attic to remain non-conditioned storage. remove chimney in basement.Details
level 3 - no work to exterior facade, no horizontal extension to building footprint. removing interior wall at level 3. demolish full bathroom at extg attic space. attic to remain non-conditioned storage. remove chimney in basement. | $85,000 |
| Aug 17, 2022 | Completed final sign-off Jul 2023 | 167 Belvedere St | Silver Arrows Paint Restoration | remodel of kitchen and bathroom. upgrade electrical wiring and electrical panel, remove lath and plaster and replace with sheetrock walls and ceilings. kitchen & bathroom remodel in-kind. no wall alteration.Details
remodel of kitchen and bathroom. upgrade electrical wiring and electrical panel, remove lath and plaster and replace with sheetrock walls and ceilings. kitchen & bathroom remodel in-kind. no wall alteration. | $75,000 |
| Jul 21, 2022 | Completed final sign-off Aug 2023 | 163 Belvedere St | Silver Arrows Paint Restoration | (e) renewed unit, permiting sheet rock, insullation, electrical, plumbing and mech. no walls moved. two bathroom and one kitchen remodel.Details
(e) renewed unit, permiting sheet rock, insullation, electrical, plumbing and mech. no walls moved. two bathroom and one kitchen remodel. | $15,800 |
| Jan 27, 2022 | Completed final sign-off Aug 2023 | 165 Belvedere St | Silver Arrows Paint Restoration | replace lath and plaster walls with sheetrock, upgrade electrical entire unit replacing knob and tube. original building permit# 202011249586.Details
replace lath and plaster walls with sheetrock, upgrade electrical entire unit replacing knob and tube. original building permit# 202011249586. | $25,000 |
| Nov 24, 2020 | Completed final sign-off Aug 2023 | 165 Belvedere St | Silver Arrows Paint Restoration | 2nd flr unit - remodel of kitchen and bathroom, upgrade electrical panelDetails
2nd flr unit - remodel of kitchen and bathroom, upgrade electrical panel | $70,000 |
| Sep 16, 2010 | Completed final sign-off Oct 2010 | 163 Belvedere St | add handrail to rear exterior stairway in conformance with 2007cbc. height above tread nosing: 34" to 38". grapabilit: 1-1/2" diameterDetails
add handrail to rear exterior stairway in conformance with 2007cbc. height above tread nosing: 34" to 38". grapabilit: 1-1/2" diameter | $250 | |
| Mar 6, 2009 | Never finaled issued Mar 2009, no final | 163 Belvedere St | street space & sidewalk repair.Details
street space & sidewalk repair. | ||
| Apr 7, 2003 | Completed final sign-off Aug 2003 | 165 Belvedere St | Woodstone Construction | enlarge bathroom, relocate toilet, hand wash & tub install new cabinets in kitchenDetails
enlarge bathroom, relocate toilet, hand wash & tub install new cabinets in kitchen | $17,000 |
| Nov 26, 2001 | Completed final sign-off Apr 2002 | 163 Belvedere St | Woodstone Construction | replace existing front stairs dryrottedDetails
replace existing front stairs dryrotted | $2,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.