Block 5643, lot 029
231 Coleridge St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2019 | Completed final sign-off Apr 2019 | 231 Coleridge St | Spectrum Development Co. | to comply w/physical inspection report #cc-8328Details
to comply w/physical inspection report #cc-8328 | $6,000 |
| Mar 28, 2017 | Completed final sign-off Apr 2017 | 231 Coleridge St | Silver Arrows Paint Restoration | anchor bolting foundation, 32" on center, sister studs existing 2"x6" rotten damaged studs and replace rotten sill plate.Details
anchor bolting foundation, 32" on center, sister studs existing 2"x6" rotten damaged studs and replace rotten sill plate. | $2,000 |
| Dec 13, 2016 | Completed final sign-off Apr 2017 | 231 Coleridge St | Silver Arrows Paint Restoration | 2nd fl bathroom remodel, reconfigure kitchen layout, cabinets, high eff lighting, new closet in e bedroom, new door to switch e closet access. n ew wood floors, french door at rearDetails
2nd fl bathroom remodel, reconfigure kitchen layout, cabinets, high eff lighting, new closet in e bedroom, new door to switch e closet access. n ew wood floors, french door at rear | $50,000 |
| Aug 10, 2012 | Completed final sign-off Dec 2012 | 231 Coleridge St | tear out & repair of stairs, upper deck & lowewr deck. all work in kind. total replacement under 50%Details
tear out & repair of stairs, upper deck & lowewr deck. all work in kind. total replacement under 50% | $8,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.