Silver Arrows Paint Restoration
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Nov 2023
- Last 24 months
- 0 permits filed
71 permits since 2000: 45 completed, 1 in progress, 18 never finaled, 7 expired or cancelled.
Of the 18 never-finaled permits, 1 is 3 to 5 years old, 15 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 254 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2023 | Completed final sign-off Mar 2024 | 451 Locust St | replace front terrazo stair in-kind with concrete stair due to significant deterioration. stair layout to remain the same as the existing stair.Details
replace front terrazo stair in-kind with concrete stair due to significant deterioration. stair layout to remain the same as the existing stair. | $15,000 |
| Dec 15, 2016 | Never finaled issued Nov 2017, no final | 69 Winfield St | repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd.Details
repair roofs, new flooring, replace windows and skylight. replace (e) floor heater, replace exist. water heater; replace treads and risers at (e) interior stair, remodel 2nd floor including kitchen remodel. replace bathroom fixtures in kind. patch & repair facade as req'd. | $100,000 |
| Nov 29, 2016 | Completed final sign-off Feb 2018 | 1915 14th Av | remodel lower level bathroom, relocate exterior stair to yard & build (n) deck.Details
remodel lower level bathroom, relocate exterior stair to yard & build (n) deck. | $18,000 |
| Sep 20, 2016 | Expired or cancelled expired Dec 2023 | 652 Hayes St | replace retaining walls in rear yard, replace fence, demolish slab & lower 24". new footings, new conditioned basement with 2 new baths, family room, laundry room, mech. room & stairs to connect floor in unit. main floor: new study room, new closet, update lighting, new fireplace built-ins.Details
replace retaining walls in rear yard, replace fence, demolish slab & lower 24". new footings, new conditioned basement with 2 new baths, family room, laundry room, mech. room & stairs to connect floor in unit. main floor: new study room, new closet, update lighting, new fireplace built-ins. | $350,000 |