Back to kitchen remodel contractors
Shun Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Dec 2017
- Last 24 months
- 0 permits filed
79 permits since 2000: 67 completed, 11 never finaled, 1 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 19 completed, 5 never finaled. Typically 0 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2014 | Completed final sign-off Feb 2016 | 1663 44th Av | per plan.add 2 bedrooms, 2 storages, 2 baths, laundry, utility, mud room on 1st fl per plan, infill under sundroom add 2 bedroos, 2 storage, 2 baths on 2nd fl. relocate 2 bedroos and add 7 skylights on 2nd fl. e kitchen and e bath remodel on 2nd flDetails
per plan.add 2 bedrooms, 2 storages, 2 baths, laundry, utility, mud room on 1st fl per plan, infill under sundroom add 2 bedroos, 2 storage, 2 baths on 2nd fl. relocate 2 bedroos and add 7 skylights on 2nd fl. e kitchen and e bath remodel on 2nd fl | $90,000 |
| Aug 18, 2014 | Never finaled issued May 2015, no final | 645 Faxon Av | legalize in law unit per ordinance 43-14 on 1st floor per plan. legalize kitchen on 1st floor per plan.Details
legalize in law unit per ordinance 43-14 on 1st floor per plan. legalize kitchen on 1st floor per plan. | $35,000 |
| Jul 9, 2014 | Never finaled issued Nov 2014, no final | 115 Maywood Dr | remove existing master bedroom and closet and convert into new master bedroom walk in closet. remodel e master and new bath. kitchen remodel. infill 2 window openings in kitchen and breakfast nook, create new window opening.replace e heater/ductwork,new force air central heat, insulated ductwork.Details
remove existing master bedroom and closet and convert into new master bedroom walk in closet. remodel e master and new bath. kitchen remodel. infill 2 window openings in kitchen and breakfast nook, create new window opening.replace e heater/ductwork,new force air central heat, insulated ductwork. | $50,000 |
| Jan 9, 2013 | Never finaled issued Jan 2013, no final | 2930 Clay St | windows and skylights replacement in kind (7 windows & 3 skylights), not visible from street. reinforce deflected beam at kitchen ceiling.Details
windows and skylights replacement in kind (7 windows & 3 skylights), not visible from street. reinforce deflected beam at kitchen ceiling. | $8,000 |
| Jan 4, 2013 | Never finaled issued Jan 2013, no final | 290 Collingwood St | remove allinterior doors,trims, moldings & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation which under separate permit, soft demo only, no structural workDetails
remove allinterior doors,trims, moldings & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation which under separate permit, soft demo only, no structural work | $2,000 |
| Dec 27, 2012 | Completed final sign-off May 2013 | 771 34th Av | interior remodel: 1st floor: add a family room, a bedroom, a guestroom, two baths. 2nd floor: add a bath, remodel kitchen.Details
interior remodel: 1st floor: add a family room, a bedroom, a guestroom, two baths. 2nd floor: add a bath, remodel kitchen. | $58,000 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 2930 Clay St | kitchen and 2 bathroom remodel.Details
kitchen and 2 bathroom remodel. | $28,000 |
| Aug 3, 2012 | Completed final sign-off Nov 2012 | 2327 25th Av | convert sunroom to master bedroom & walk in closet on 2nd floor. kitchen & bathroom remodel on 2nd floor. convert dining room to new bedroom on 2nd floor.Details
convert sunroom to master bedroom & walk in closet on 2nd floor. kitchen & bathroom remodel on 2nd floor. convert dining room to new bedroom on 2nd floor. | $35,000 |
| May 4, 2012 | Completed final sign-off Oct 2012 | 1243 Clayton St | remodel 2 kitchens-repl cabinets, countertops, flring, move stove location & add gas line. move door opening in dining & expand opening to hallwy. remodel 2 bathrooms-remove sinks & add double sinks in powder rm, move toilet to current shower location & shower to toilet location. remodel 2 guest batDetails
remodel 2 kitchens-repl cabinets, countertops, flring, move stove location & add gas line. move door opening in dining & expand opening to hallwy. remodel 2 bathrooms-remove sinks & add double sinks in powder rm, move toilet to current shower location & shower to toilet location. remodel 2 guest bat | $40,000 |
| Nov 17, 2011 | Completed final sign-off May 2013 | 566 Elizabeth St | bathroom and kitchen remodel per plan. repair deflected beam above living room on 1st fl per plan. repair garden wall and concrete stair and foundation per planDetails
bathroom and kitchen remodel per plan. repair deflected beam above living room on 1st fl per plan. repair garden wall and concrete stair and foundation per plan | $40,000 |
| Nov 17, 2011 | Completed final sign-off May 2013 | 568 Elizabeth St | add new master bedroom and master bath on 3rd fl per plan. add new skylight per plan. kitchen and bath remodel per planDetails
add new master bedroom and master bath on 3rd fl per plan. add new skylight per plan. kitchen and bath remodel per plan | $40,000 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 248 10th Av | add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair.Details
add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair. | $60,000 |
| Jul 19, 2011 | Completed final sign-off Nov 2011 | 3530 Taraval St | kitchen & (2)bathrooms. remodel & remove non-bearing wall between dining & kitchen @ 3rd fl. 3530 taraval.Details
kitchen & (2)bathrooms. remodel & remove non-bearing wall between dining & kitchen @ 3rd fl. 3530 taraval. | $25,000 |
| Jan 28, 2011 | Completed final sign-off Apr 2011 | 1545 Larkin St | remodel kitchen and bathroom, replace 6 windows, not visable from street on unit #a. remodel living room & dining room at unit #b per correction notice dated 1-28-2011. provide high efficency lights per 150 (k). replacement window u factor =0.40Details
remodel kitchen and bathroom, replace 6 windows, not visable from street on unit #a. remodel living room & dining room at unit #b per correction notice dated 1-28-2011. provide high efficency lights per 150 (k). replacement window u factor =0.40 | $20,000 |
| Dec 24, 2010 | Completed final sign-off Mar 2011 | 1305 Cabrillo St | remodel 4 existing bathrooms & 4 existing kitchen. no change to wall, windows & doors, lighting to comply with cec 150 (k).Details
remodel 4 existing bathrooms & 4 existing kitchen. no change to wall, windows & doors, lighting to comply with cec 150 (k). | $75,000 |
| Nov 15, 2010 | Completed final sign-off Jan 2011 | 3719 Folsom St | remodel upstair kitchen & bathroom - new drywall & insulation, same location. new plbg & electrical, new water heater, water pipe & central heater. repair exterior stucco. new lighting comply wich cec 150(k)Details
remodel upstair kitchen & bathroom - new drywall & insulation, same location. new plbg & electrical, new water heater, water pipe & central heater. repair exterior stucco. new lighting comply wich cec 150(k) | $20,000 |
| Sep 8, 2009 | Completed final sign-off May 2010 | 2530 22nd Av | construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%.Details
construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%. | $56,000 |
| Sep 11, 2008 | Completed final sign-off Feb 2009 | 64 Grand View Av | 1)remodel extg kitchen and 2 bathrooms on 2nd floor. 2)construct new reinforcing concrete retaining wall(max 4'-10" ht) for new patio on rear yard per plan. 3)new 2 french door on extg bedroom on 2nd floorDetails
1)remodel extg kitchen and 2 bathrooms on 2nd floor. 2)construct new reinforcing concrete retaining wall(max 4'-10" ht) for new patio on rear yard per plan. 3)new 2 french door on extg bedroom on 2nd floor | $60,000 |
| Jun 24, 2008 | Completed final sign-off Oct 2008 | 1945 20th Av | 2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7').Details
2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7'). | $65,000 |
| Apr 10, 2008 | Completed final sign-off Sep 2008 | 2218 31st Av | add 2 bedroom, 2 full bath room one storage and laundry area on (e) ground floor per plan. rewire and remodel (e) kichen and 2 full bathroom on 2nd floor. (n) fixtures in the bathroom and (n) cabinets, countertops and new sink in kitchenDetails
add 2 bedroom, 2 full bath room one storage and laundry area on (e) ground floor per plan. rewire and remodel (e) kichen and 2 full bathroom on 2nd floor. (n) fixtures in the bathroom and (n) cabinets, countertops and new sink in kitchen | $100,000 |
| Feb 4, 2008 | Completed final sign-off Mar 2008 | 1236 Leavenworth St | remodel 1 bathroom, replace kitchen cabinets and counter top.no structural work.Details
remodel 1 bathroom, replace kitchen cabinets and counter top.no structural work. | $8,000 |
| Oct 12, 2006 | Completed final sign-off Dec 2006 | 130 Havenside Dr | remodel 1 kitchen only. no new appliances.Details
remodel 1 kitchen only. no new appliances. | $5,000 |
| Aug 6, 2004 | Completed final sign-off Oct 2004 | 1391 17th Av | repair & remodel kitchen & bathroom. kitchen replace counter & cabinet, flr & sink. (1) bathrm; replDetails
repair & remodel kitchen & bathroom. kitchen replace counter & cabinet, flr & sink. (1) bathrm; repl | $10,000 |
| Jul 21, 2004 | Completed final sign-off Oct 2004 | 735 Portola Dr | repair & remodel kitchen/bathroom & laundryDetails
repair & remodel kitchen/bathroom & laundry | $11,000 |