Back to bathroom remodel contractors
Shun Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Dec 2017
- Last 24 months
- 0 permits filed
79 permits since 2000: 67 completed, 11 never finaled, 1 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 37 completed, 3 never finaled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2014 | Completed final sign-off Feb 2016 | 1663 44th Av | per plan.add 2 bedrooms, 2 storages, 2 baths, laundry, utility, mud room on 1st fl per plan, infill under sundroom add 2 bedroos, 2 storage, 2 baths on 2nd fl. relocate 2 bedroos and add 7 skylights on 2nd fl. e kitchen and e bath remodel on 2nd flDetails
per plan.add 2 bedrooms, 2 storages, 2 baths, laundry, utility, mud room on 1st fl per plan, infill under sundroom add 2 bedroos, 2 storage, 2 baths on 2nd fl. relocate 2 bedroos and add 7 skylights on 2nd fl. e kitchen and e bath remodel on 2nd fl | $90,000 |
| Jul 9, 2014 | Never finaled issued Nov 2014, no final | 115 Maywood Dr | remove existing master bedroom and closet and convert into new master bedroom walk in closet. remodel e master and new bath. kitchen remodel. infill 2 window openings in kitchen and breakfast nook, create new window opening.replace e heater/ductwork,new force air central heat, insulated ductwork.Details
remove existing master bedroom and closet and convert into new master bedroom walk in closet. remodel e master and new bath. kitchen remodel. infill 2 window openings in kitchen and breakfast nook, create new window opening.replace e heater/ductwork,new force air central heat, insulated ductwork. | $50,000 |
| Dec 27, 2012 | Completed final sign-off May 2013 | 771 34th Av | interior remodel: 1st floor: add a family room, a bedroom, a guestroom, two baths. 2nd floor: add a bath, remodel kitchen.Details
interior remodel: 1st floor: add a family room, a bedroom, a guestroom, two baths. 2nd floor: add a bath, remodel kitchen. | $58,000 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 2930 Clay St | kitchen and 2 bathroom remodel.Details
kitchen and 2 bathroom remodel. | $28,000 |
| Sep 20, 2012 | Completed final sign-off Nov 2012 | 765 Arguello Bl | add 1 bathroom, laundry room, remodel existing bathroom at 4th floor unit 8 per planDetails
add 1 bathroom, laundry room, remodel existing bathroom at 4th floor unit 8 per plan | $20,000 |
| Aug 24, 2012 | Completed final sign-off Nov 2012 | 2327 25th Av | add 2 bathrooms, 1 play room, 1 study room, 1 storage and 1 bedroom on the 1st fllor per planDetails
add 2 bathrooms, 1 play room, 1 study room, 1 storage and 1 bedroom on the 1st fllor per plan | $30,000 |
| Aug 3, 2012 | Completed final sign-off Nov 2012 | 2327 25th Av | convert sunroom to master bedroom & walk in closet on 2nd floor. kitchen & bathroom remodel on 2nd floor. convert dining room to new bedroom on 2nd floor.Details
convert sunroom to master bedroom & walk in closet on 2nd floor. kitchen & bathroom remodel on 2nd floor. convert dining room to new bedroom on 2nd floor. | $35,000 |
| May 4, 2012 | Completed final sign-off Oct 2012 | 1243 Clayton St | remodel 2 kitchens-repl cabinets, countertops, flring, move stove location & add gas line. move door opening in dining & expand opening to hallwy. remodel 2 bathrooms-remove sinks & add double sinks in powder rm, move toilet to current shower location & shower to toilet location. remodel 2 guest batDetails
remodel 2 kitchens-repl cabinets, countertops, flring, move stove location & add gas line. move door opening in dining & expand opening to hallwy. remodel 2 bathrooms-remove sinks & add double sinks in powder rm, move toilet to current shower location & shower to toilet location. remodel 2 guest bat | $40,000 |
| Feb 7, 2012 | Completed final sign-off Mar 2012 | 1320 Sloat Bl | convert (e) bathroom into 2 bathrooms on upper floor per planDetails
convert (e) bathroom into 2 bathrooms on upper floor per plan | $12,000 |
| Nov 17, 2011 | Completed final sign-off May 2013 | 566 Elizabeth St | bathroom and kitchen remodel per plan. repair deflected beam above living room on 1st fl per plan. repair garden wall and concrete stair and foundation per planDetails
bathroom and kitchen remodel per plan. repair deflected beam above living room on 1st fl per plan. repair garden wall and concrete stair and foundation per plan | $40,000 |
| Nov 17, 2011 | Completed final sign-off May 2013 | 568 Elizabeth St | add new master bedroom and master bath on 3rd fl per plan. add new skylight per plan. kitchen and bath remodel per planDetails
add new master bedroom and master bath on 3rd fl per plan. add new skylight per plan. kitchen and bath remodel per plan | $40,000 |
| Oct 19, 2011 | Completed final sign-off Feb 2012 | 1343 32nd Av | add 1-bathroom, storage room & media room on ground floor. add one bathroom on 2nd. floor. this permit will clear nov#20067481,200731680 penalties paid on pa#200802084386.Details
add 1-bathroom, storage room & media room on ground floor. add one bathroom on 2nd. floor. this permit will clear nov#20067481,200731680 penalties paid on pa#200802084386. | $55,000 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 248 10th Av | add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair.Details
add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair. | $60,000 |
| Oct 6, 2011 | Completed final sign-off Feb 2012 | 248 10th Av | add new bathroom on 3rd floor and remodel (e) bathroom on 3rd floor per plan. and add laundry room on 3rd floor per plan.Details
add new bathroom on 3rd floor and remodel (e) bathroom on 3rd floor per plan. and add laundry room on 3rd floor per plan. | $18,000 |
| Jul 19, 2011 | Completed final sign-off Nov 2011 | 3530 Taraval St | kitchen & (2)bathrooms. remodel & remove non-bearing wall between dining & kitchen @ 3rd fl. 3530 taraval.Details
kitchen & (2)bathrooms. remodel & remove non-bearing wall between dining & kitchen @ 3rd fl. 3530 taraval. | $25,000 |
| Jan 28, 2011 | Completed final sign-off Apr 2011 | 1545 Larkin St | remodel kitchen and bathroom, replace 6 windows, not visable from street on unit #a. remodel living room & dining room at unit #b per correction notice dated 1-28-2011. provide high efficency lights per 150 (k). replacement window u factor =0.40Details
remodel kitchen and bathroom, replace 6 windows, not visable from street on unit #a. remodel living room & dining room at unit #b per correction notice dated 1-28-2011. provide high efficency lights per 150 (k). replacement window u factor =0.40 | $20,000 |
| Dec 24, 2010 | Completed final sign-off Mar 2011 | 1305 Cabrillo St | remodel 4 existing bathrooms & 4 existing kitchen. no change to wall, windows & doors, lighting to comply with cec 150 (k).Details
remodel 4 existing bathrooms & 4 existing kitchen. no change to wall, windows & doors, lighting to comply with cec 150 (k). | $75,000 |
| Dec 15, 2010 | Completed final sign-off Feb 2012 | 608 Kirkham St | remodel one bathroom for 1/f. lighting to comply with cec 150(k).Details
remodel one bathroom for 1/f. lighting to comply with cec 150(k). | $5,000 |
| Nov 15, 2010 | Completed final sign-off Jan 2011 | 3719 Folsom St | remodel upstair kitchen & bathroom - new drywall & insulation, same location. new plbg & electrical, new water heater, water pipe & central heater. repair exterior stucco. new lighting comply wich cec 150(k)Details
remodel upstair kitchen & bathroom - new drywall & insulation, same location. new plbg & electrical, new water heater, water pipe & central heater. repair exterior stucco. new lighting comply wich cec 150(k) | $20,000 |
| Oct 7, 2010 | Completed final sign-off Jan 2011 | 3719 Folsom St | repair existing deck in kind less than 50% at gr fl. repair existing balcony in kind at 2nd fl. enlarge ex bathroom, add 1 storage at gr fl levelDetails
repair existing deck in kind less than 50% at gr fl. repair existing balcony in kind at 2nd fl. enlarge ex bathroom, add 1 storage at gr fl level | $50,000 |
| Sep 21, 2010 | Completed final sign-off Mar 2011 | 3025 22nd Av | add one study room, one full bath room at ground floorDetails
add one study room, one full bath room at ground floor | $12,000 |
| Feb 8, 2010 | Completed final sign-off Apr 2010 | 374 Bright St | add 2 bedrooms, 1 full bathroom on (e) ground floor (garage) per planDetails
add 2 bedrooms, 1 full bathroom on (e) ground floor (garage) per plan | $22,000 |
| Nov 4, 2009 | Completed final sign-off Mar 2010 | 330 Country Club Dr | add two bedrooms, one full bathroom and laundry room on ground floor.Details
add two bedrooms, one full bathroom and laundry room on ground floor. | $40,000 |
| Oct 5, 2009 | Completed final sign-off Mar 2010 | 300 Casitas Av | add two bedrooms, one stucdy room, one full bath room on ground/garage floor. add one full bathroom on 2nd fl.Details
add two bedrooms, one stucdy room, one full bath room on ground/garage floor. add one full bathroom on 2nd fl. | $45,000 |
| Sep 8, 2009 | Completed final sign-off May 2010 | 2530 22nd Av | construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%.Details
construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%. | $56,000 |
| Aug 27, 2009 | Completed final sign-off Jul 2010 | 1661 18th Av | construct rear deck with stairs on ground fl at rear of existing buildidng, add one bed room, family rm, full bathroom and two storage rooms on ground floor.Details
construct rear deck with stairs on ground fl at rear of existing buildidng, add one bed room, family rm, full bathroom and two storage rooms on ground floor. | $50,000 |
| Aug 5, 2009 | Completed final sign-off Nov 2009 | 1585 29th Av | add 1 playroom, laundry, 1 bedroom, 1 full bathroom & 1 storage room on (e) ground floor.Details
add 1 playroom, laundry, 1 bedroom, 1 full bathroom & 1 storage room on (e) ground floor. | $35,000 |
| May 11, 2009 | Completed final sign-off Aug 2009 | 1342 21st Av | add bedrooms, laundry room, and half bath at ground floorDetails
add bedrooms, laundry room, and half bath at ground floor | $25,000 |
| Sep 11, 2008 | Completed final sign-off Feb 2009 | 64 Grand View Av | 1)remodel extg kitchen and 2 bathrooms on 2nd floor. 2)construct new reinforcing concrete retaining wall(max 4'-10" ht) for new patio on rear yard per plan. 3)new 2 french door on extg bedroom on 2nd floorDetails
1)remodel extg kitchen and 2 bathrooms on 2nd floor. 2)construct new reinforcing concrete retaining wall(max 4'-10" ht) for new patio on rear yard per plan. 3)new 2 french door on extg bedroom on 2nd floor | $60,000 |
| Jun 24, 2008 | Completed final sign-off Oct 2008 | 1945 20th Av | 2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7').Details
2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7'). | $65,000 |
| May 5, 2008 | Completed final sign-off Nov 2008 | 408 Edinburgh St | add one new full bathroom on ground floor garage area and one bathroom on 2nd floor family room area.Details
add one new full bathroom on ground floor garage area and one bathroom on 2nd floor family room area. | $20,000 |
| Apr 10, 2008 | Completed final sign-off Sep 2008 | 2218 31st Av | add 2 bedroom, 2 full bath room one storage and laundry area on (e) ground floor per plan. rewire and remodel (e) kichen and 2 full bathroom on 2nd floor. (n) fixtures in the bathroom and (n) cabinets, countertops and new sink in kitchenDetails
add 2 bedroom, 2 full bath room one storage and laundry area on (e) ground floor per plan. rewire and remodel (e) kichen and 2 full bathroom on 2nd floor. (n) fixtures in the bathroom and (n) cabinets, countertops and new sink in kitchen | $100,000 |
| Feb 4, 2008 | Completed final sign-off Mar 2008 | 1236 Leavenworth St | remodel 1 bathroom, replace kitchen cabinets and counter top.no structural work.Details
remodel 1 bathroom, replace kitchen cabinets and counter top.no structural work. | $8,000 |
| Apr 13, 2007 | Never finaled issued Apr 2007, no final | 300 03rd St | work @ unit# 610 only. no structural changes. bathroom: update of existing tiling on floor & in shower.Details
work @ unit# 610 only. no structural changes. bathroom: update of existing tiling on floor & in shower. | $1,300 |
| Nov 13, 2006 | Completed final sign-off Mar 2007 | 232 Bowdoin St | to add one play room , one bed room , one study room and one fulll bath room on existing ground floor per paln.Details
to add one play room , one bed room , one study room and one fulll bath room on existing ground floor per paln. | $20,000 |
| Oct 6, 2006 | Completed final sign-off Jan 2007 | 4015 Lincoln Wy | legalize (e) bedroom and 1/2 bath room at rear portion of (e) garage. to comply ces physical inspection report#3r-4597 (report attached).Details
legalize (e) bedroom and 1/2 bath room at rear portion of (e) garage. to comply ces physical inspection report#3r-4597 (report attached). | $15,000 |
| Mar 24, 2006 | Completed final sign-off Jun 2006 | 2444 Anza St | in kind bathroom remodel at 1st floor existing. no change to walls or windows.Details
in kind bathroom remodel at 1st floor existing. no change to walls or windows. | $6,400 |
| Mar 22, 2005 | Completed final sign-off Jun 2005 | 839 London St | add rooms at ground floor fam rm bedrm and full bath storagesDetails
add rooms at ground floor fam rm bedrm and full bath storages | $23,000 |
| Aug 6, 2004 | Completed final sign-off Oct 2004 | 1391 17th Av | repair & remodel kitchen & bathroom. kitchen replace counter & cabinet, flr & sink. (1) bathrm; replDetails
repair & remodel kitchen & bathroom. kitchen replace counter & cabinet, flr & sink. (1) bathrm; repl | $10,000 |
| Jul 21, 2004 | Completed final sign-off Oct 2004 | 735 Portola Dr | repair & remodel kitchen/bathroom & laundryDetails
repair & remodel kitchen/bathroom & laundry | $11,000 |