Shun Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Dec 2017
- Last 24 months
- 0 permits filed
79 permits since 2000: 67 completed, 11 never finaled, 1 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
10 deck permits: 10 completed. Typically 0 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2012 | Completed final sign-off Dec 2012 | 1243 Clayton St | to comply with inspection report cc-7151: upgrade existing guardrail with 4" max spacing railing, install handrail at stairway of rear deck (one side only).Details
to comply with inspection report cc-7151: upgrade existing guardrail with 4" max spacing railing, install handrail at stairway of rear deck (one side only). | $1,600 |
| Sep 13, 2012 | Completed final sign-off Nov 2012 | 2327 25th Av | add 6'x15' wood deck on 2nd floor at rear per plan.Details
add 6'x15' wood deck on 2nd floor at rear per plan. | $8,000 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 248 10th Av | add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair.Details
add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair. | $60,000 |
| Jul 7, 2011 | Completed final sign-off Aug 2011 | 363 Madrid St | repair deck and sidings - less than 50%. change windows double hung oa front bay: 3 fiberglass.Details
repair deck and sidings - less than 50%. change windows double hung oa front bay: 3 fiberglass. | $5,000 |
| Oct 7, 2010 | Completed final sign-off Jan 2011 | 3719 Folsom St | repair existing deck in kind less than 50% at gr fl. repair existing balcony in kind at 2nd fl. enlarge ex bathroom, add 1 storage at gr fl levelDetails
repair existing deck in kind less than 50% at gr fl. repair existing balcony in kind at 2nd fl. enlarge ex bathroom, add 1 storage at gr fl level | $50,000 |
| Jul 8, 2010 | Completed final sign-off Jul 2010 | 43 Miramar Av | remove existing rear stairs and reduce rear deck to 8' x 5'. rebuild new stairs from rear deck down to rear yard. existing deck joist and decking to remainDetails
remove existing rear stairs and reduce rear deck to 8' x 5'. rebuild new stairs from rear deck down to rear yard. existing deck joist and decking to remain | $3,000 |
| Sep 8, 2009 | Completed final sign-off May 2010 | 2530 22nd Av | construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%.Details
construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%. | $56,000 |
| Aug 27, 2009 | Completed final sign-off Jul 2010 | 1661 18th Av | construct rear deck with stairs on ground fl at rear of existing buildidng, add one bed room, family rm, full bathroom and two storage rooms on ground floor.Details
construct rear deck with stairs on ground fl at rear of existing buildidng, add one bed room, family rm, full bathroom and two storage rooms on ground floor. | $50,000 |
| Jun 24, 2008 | Completed final sign-off Oct 2008 | 1945 20th Av | 2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7').Details
2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7'). | $65,000 |
| Oct 6, 2004 | Completed final sign-off Nov 2004 | 225 Pacheco St | front-remove existing wood deck at surface & replace w/flr material, remove dry rockwall as necessarDetails
front-remove existing wood deck at surface & replace w/flr material, remove dry rockwall as necessar | $8,000 |