Back to bathroom remodel contractors
Sf Twin Boys Corp. Dba Master Builders
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Apr 2026
- Last 24 months
- 7 permits filed
198 permits since 2000: 167 completed, 4 in progress, 15 never finaled, 12 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 7 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
71 bathroom remodel permits: 59 completed, 3 in progress, 1 never finaled, 8 expired or cancelled. Typically 2 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2026 | In progress issued May 2026 | 348 Chestnut St | revise to previous permit # 202603107219: revise all windows height from 6'-8" to 5'-10". remove (e) fireplace. no header is reqd in bedroom #3 between bathroom, closet & bedroom. add sink, refrigerator, bbq stove & a/c @ rear yard (not enclosed).Details
revise to previous permit # 202603107219: revise all windows height from 6'-8" to 5'-10". remove (e) fireplace. no header is reqd in bedroom #3 between bathroom, closet & bedroom. add sink, refrigerator, bbq stove & a/c @ rear yard (not enclosed). | $100 |
| Mar 10, 2026 | In progress issued Mar 2026 | 348 Chestnut St | 1st flr: convert (e) kitchen to masterbedroom w/full bath. relocate kitchen to living room. relocate half bath and narrow (e) interior stair from 45" to 36" & build counter above. lower flr: add full bath and walk in closet to bedroom#3. remodel (e) full bath #2 add stair to laundry room andDetails
1st flr: convert (e) kitchen to masterbedroom w/full bath. relocate kitchen to living room. relocate half bath and narrow (e) interior stair from 45" to 36" & build counter above. lower flr: add full bath and walk in closet to bedroom#3. remodel (e) full bath #2 add stair to laundry room and | $75,000 |
| Feb 13, 2026 | In progress issued Feb 2026 | 1 Stark St | back unit: all interior work, all in kind replacement, no structural work. remodel kitchen and 3 baths. replace 9 interior doors, 5 windows (rear, not street visible), patch repair smooth walls and ceilings, install fire rated recessed lights and outlets throughout, install new wood floor.Details
back unit: all interior work, all in kind replacement, no structural work. remodel kitchen and 3 baths. replace 9 interior doors, 5 windows (rear, not street visible), patch repair smooth walls and ceilings, install fire rated recessed lights and outlets throughout, install new wood floor. | $50,000 |
| Oct 27, 2022 | Completed final sign-off Dec 2022 | 1943 Stockton St | at rear cottage only: replace existing fixtures in rxisting kitchen and existing bath, 1 sink, 1 shower, 1 toiletDetails
at rear cottage only: replace existing fixtures in rxisting kitchen and existing bath, 1 sink, 1 shower, 1 toilet | $15,000 |
| Jul 18, 2022 | Completed final sign-off Nov 2022 | 315 Chestnut St | add recessed lights. convert (e) closet to (n) full bathroom with 1 shower, 1 toilet, 1 sink.Details
add recessed lights. convert (e) closet to (n) full bathroom with 1 shower, 1 toilet, 1 sink. | $25,000 |
| Feb 7, 2022 | Completed final sign-off Oct 2022 | 1943 Stockton St | ada bathroom, improvements as required for path of travel no modification to 2/f or building in rear of property. fire alarm & mech under separate permit.Details
ada bathroom, improvements as required for path of travel no modification to 2/f or building in rear of property. fire alarm & mech under separate permit. | $15,000 |
| Dec 6, 2021 | Expired or cancelled cancelled Jan 2023 | 1943 Stockton St | 1st floor & basement: t.i to extg office space(1943 stockton), full ada compliance including new ada bath and nw acces. platform lift, remodel (e) bathroom, replace & expanding extg storage platform, lower slab on lower floor by 18", no modification of dwelling unit.seismic upgradeDetails
1st floor & basement: t.i to extg office space(1943 stockton), full ada compliance including new ada bath and nw acces. platform lift, remodel (e) bathroom, replace & expanding extg storage platform, lower slab on lower floor by 18", no modification of dwelling unit.seismic upgrade | $200,000 |
| Oct 27, 2021 | Completed final sign-off Aug 2022 | 352 Chestnut St | remodel (e) kitchen; remodel two (e) bathrooms and convert (e) closet to (n) full bathroom. total of (1) shower with preformed pan, (2) tubs, (3) toilets, and (3) sinks.Details
remodel (e) kitchen; remodel two (e) bathrooms and convert (e) closet to (n) full bathroom. total of (1) shower with preformed pan, (2) tubs, (3) toilets, and (3) sinks. | $45,000 |
| Oct 4, 2021 | Completed final sign-off Oct 2021 | 175 Bluxome St | unit 205: repair damaged sheetrock and tile at bathroom; all fixtures to remain in their original locations.Details
unit 205: repair damaged sheetrock and tile at bathroom; all fixtures to remain in their original locations. | $2,000 |
| Sep 17, 2021 | Completed final sign-off May 2022 | 1943 Stockton St | front building: unit 1947 stockton st: remodel (e) kitchen; remodel (e) bathroom and convert (e) split bath to (n) full bath. total 1 shower, 1 tub,2 sinks; remove non-structural walls at (e) closet; upddate bedroom closets; replace cracked glazing in (e) wood frame.Details
front building: unit 1947 stockton st: remodel (e) kitchen; remodel (e) bathroom and convert (e) split bath to (n) full bath. total 1 shower, 1 tub,2 sinks; remove non-structural walls at (e) closet; upddate bedroom closets; replace cracked glazing in (e) wood frame. | $42,000 |
| Jul 14, 2021 | Completed final sign-off Feb 2022 | 3577 22nd St | add new bath in extg closet; 1 sink, 1 toilet, 1 shower over tub bathroom to comply with cec 150.01 (k)5; no structural.Details
add new bath in extg closet; 1 sink, 1 toilet, 1 shower over tub bathroom to comply with cec 150.01 (k)5; no structural. | $12,000 |
| Jun 22, 2021 | Completed final sign-off Feb 2022 | 3577 22nd St | remove unused decoratie brick chimney inside house. remodel bath in kind. no structural workDetails
remove unused decoratie brick chimney inside house. remodel bath in kind. no structural work | $12,500 |
| Jun 18, 2021 | Completed final sign-off Nov 2021 | 2232 Jackson St | remodel (e) bath in kind; 1 sink, 1 toilet, 1 shower. non structuralDetails
remodel (e) bath in kind; 1 sink, 1 toilet, 1 shower. non structural | $12,000 |
| Oct 2, 2020 | Completed final sign-off Mar 2021 | 1639 Washington St | 1639 in-kind; replace (8) interior doors and (1) door to emergency stairs; in existing openings; replace engineered wood flooring; remodel (3) bathrooms (ba1: 4'x8'; ba2: 5'x5'; ba3: 5'x5') all with (n) toilets, sinks, showers; replace old furnace and old water heater. all work in kind.Details
1639 in-kind; replace (8) interior doors and (1) door to emergency stairs; in existing openings; replace engineered wood flooring; remodel (3) bathrooms (ba1: 4'x8'; ba2: 5'x5'; ba3: 5'x5') all with (n) toilets, sinks, showers; replace old furnace and old water heater. all work in kind. | $60,000 |
| Jul 13, 2020 | Completed final sign-off Nov 2020 | 1637 Washington St | #1637: replace (8)interior doors and (1) door to emergency stairs, in existing openings. replace engineered wood flooring. remodel three bathrooms (bathroom 1: 4' x 8'; bathroom 2: 5' x 5'; bathroom 3: 5' x 5') all bathrooms with new toilets, sinks, showers, all in kind.Details
#1637: replace (8)interior doors and (1) door to emergency stairs, in existing openings. replace engineered wood flooring. remodel three bathrooms (bathroom 1: 4' x 8'; bathroom 2: 5' x 5'; bathroom 3: 5' x 5') all bathrooms with new toilets, sinks, showers, all in kind. | $18,000 |
| Nov 14, 2019 | Completed final sign-off Aug 2020 | 644 Lombard St | rear bldg only #644 & #648: remodel kitchen and bath. add insulations at #644 & #648Details
rear bldg only #644 & #648: remodel kitchen and bath. add insulations at #644 & #648 | $15,000 |
| Oct 2, 2019 | Expired or cancelled withdrawn Dec 2024 | 642 Lombard St | rear bldg - add 1 residential unit @ rear building w/in density unit; relocate 1 residential unit from front building to rear building (front bldg modification is under separate permit); remodel kitchen, bath, add insulation at #644 1/2 and 648 1/2Details
rear bldg - add 1 residential unit @ rear building w/in density unit; relocate 1 residential unit from front building to rear building (front bldg modification is under separate permit); remodel kitchen, bath, add insulation at #644 1/2 and 648 1/2 | $80,000 |
| Jun 3, 2019 | Completed final sign-off Nov 2019 | 1201 California St | remodel kitchen and 1 bath, replace cabinets and appliances/fixtures in (e) locations; add outlets and lighting. kitchen & bath remodel in-kindDetails
remodel kitchen and 1 bath, replace cabinets and appliances/fixtures in (e) locations; add outlets and lighting. kitchen & bath remodel in-kind | $80,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2024 | 1845 Grant Av | renovation of (e) 1617 sq ft 3rd fl unit - kitchen, bathroom 1&2, (n) spiral stairs & (n) penthouse at roof, renovation of (e) penthouse, (n) 240 sq ft roof deck.Details
renovation of (e) 1617 sq ft 3rd fl unit - kitchen, bathroom 1&2, (n) spiral stairs & (n) penthouse at roof, renovation of (e) penthouse, (n) 240 sq ft roof deck. | $150,000 |
| Aug 14, 2018 | Completed final sign-off Mar 2019 | 3 Stark St | t.i. - add accessible ramp and platform lift; remoel (e) bathrooms and food prep area. n/a for maher.Details
t.i. - add accessible ramp and platform lift; remoel (e) bathrooms and food prep area. n/a for maher. | $80,000 |
| Jan 12, 2018 | Completed final sign-off Aug 2018 | 1635 Washington St | remodel (e) kitchen & bath; add 2 new bath w/showerpanDetails
remodel (e) kitchen & bath; add 2 new bath w/showerpan | $15,000 |
| Jul 12, 2017 | Completed final sign-off Aug 2018 | 460 Vallejo St | revision to pa #201512165310 - relocate (e) stair between 3rd floor & private roof deck; add (n) 1/2 bath at garage, add bedroom and bath at 2nd floor; add wood paneling to front facade at 1st floor; add parapet at stair opening, ref pa# 201609147636Details
revision to pa #201512165310 - relocate (e) stair between 3rd floor & private roof deck; add (n) 1/2 bath at garage, add bedroom and bath at 2nd floor; add wood paneling to front facade at 1st floor; add parapet at stair opening, ref pa# 201609147636 | $2,500 |
| Jan 24, 2017 | Completed final sign-off Feb 2020 | 1633 Washington St | add 3 accessory dwelling units per ordinake no. 162.16 all 1 bed/1 bath.Details
add 3 accessory dwelling units per ordinake no. 162.16 all 1 bed/1 bath. | $150,000 |
| Dec 28, 2016 | Completed final sign-off Mar 2019 | 2159 California St | units #8,9a & 9b: demolish rear deck & storage room, remodel/reconfigure three (3) apartment units @ ground floor incl kitchens,baths,windows finishes & fixtures. mep and f/a under separate permit.Details
units #8,9a & 9b: demolish rear deck & storage room, remodel/reconfigure three (3) apartment units @ ground floor incl kitchens,baths,windows finishes & fixtures. mep and f/a under separate permit. | $100,000 |
| Nov 23, 2016 | Expired or cancelled cancelled Oct 2022 | 1485 Clay St | add 3 accessory dwelling units (1 bedroom & 1 bath each) per ordinance# 162-16. remodel existing laundromatDetails
add 3 accessory dwelling units (1 bedroom & 1 bath each) per ordinance# 162-16. remodel existing laundromat | $120,000 |
| Aug 2, 2016 | Completed final sign-off Jun 2017 | 964 Central Av | remodel bedrooms, add n bathrooms, e kitchens & baths remodel under approved app#201607213029. in kind replacement of front windows(all wood pella arch), add n wndws at side and rear & replace extg, add insulation at walls & ceiling & replace dry rot where necessary to address 50+ years of def. mainDetails
remodel bedrooms, add n bathrooms, e kitchens & baths remodel under approved app#201607213029. in kind replacement of front windows(all wood pella arch), add n wndws at side and rear & replace extg, add insulation at walls & ceiling & replace dry rot where necessary to address 50+ years of def. main | $280,000 |
| Jul 21, 2016 | Completed final sign-off Jun 2017 | 964 Central Av | remodel of (e) kitchens and (e) baths in kind in all 4 units. replace (e) flooring, doors, moulding and trim in entire unit for all 4 units. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
remodel of (e) kitchens and (e) baths in kind in all 4 units. replace (e) flooring, doors, moulding and trim in entire unit for all 4 units. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $44,000 |
| Jul 15, 2016 | Completed final sign-off May 2023 | 942 Noe St | addition to rear of buidling @ (e) 1st & 2nd floors. interior remodel of (e) kitchen. add 2 bathrooms with shower. add guard rail @ front stair for safety.Details
addition to rear of buidling @ (e) 1st & 2nd floors. interior remodel of (e) kitchen. add 2 bathrooms with shower. add guard rail @ front stair for safety. | $88,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2016 | 942 Noe St | remodel (e) bathroom at the third floor - replace (e) single pane windows with new wood windows (og lugs) to comply with current energy requiremtns in kind in existing openings - repair stucco paint at the front exterior.Details
remodel (e) bathroom at the third floor - replace (e) single pane windows with new wood windows (og lugs) to comply with current energy requiremtns in kind in existing openings - repair stucco paint at the front exterior. | $17,000 |
| Feb 4, 2016 | Completed final sign-off Jun 2017 | 964 Central Av | seismic upgrade; add windows to garage on side and rear walls(not visible from right of way); add 1/2 bath in garage for convenience; kitchen and bathroom remodel at 3rd floor; no modification on square footage.Details
seismic upgrade; add windows to garage on side and rear walls(not visible from right of way); add 1/2 bath in garage for convenience; kitchen and bathroom remodel at 3rd floor; no modification on square footage. | $85,000 |
| Dec 16, 2015 | Completed final sign-off Aug 2018 | 460 Vallejo St | add private roof deck for 460 only. infill lightwell against blank wall, interior remodel, both units. add media room, wet bar, powder room to e basement, add bathroom to 462, add powder rooom to 460Details
add private roof deck for 460 only. infill lightwell against blank wall, interior remodel, both units. add media room, wet bar, powder room to e basement, add bathroom to 462, add powder rooom to 460 | $180,000 |
| Dec 10, 2015 | Expired or cancelled withdrawn Jan 2017 | 15 Kramer Pl | add 1/2 bath to (e) garageDetails
add 1/2 bath to (e) garage | $1,500 |
| May 26, 2015 | Completed final sign-off Sep 2015 | 1327 Kearny St | front bldg -construct 6' fence at rear yard; add 1/2 bath at 1st floor; demo (e) common connecting stairs & replace private stair leading to 1st floor of 1327 - 1329 kearny to comply with pre-applicatoin meeting dated march 13, 2013; ab-009 add property line windows.Details
front bldg -construct 6' fence at rear yard; add 1/2 bath at 1st floor; demo (e) common connecting stairs & replace private stair leading to 1st floor of 1327 - 1329 kearny to comply with pre-applicatoin meeting dated march 13, 2013; ab-009 add property line windows. | $14,500 |
| May 6, 2015 | Completed final sign-off Oct 2015 | 1329 Kearny St | replace cabinets & counter tops in kitchen & bath in-kind in each unit. replace 8 aluminum-framed windows on the front facade with new aluminum-clad, wood-framed windows with ogee lug details to match historic windows; interior alterations; and rear window replacement.Details
replace cabinets & counter tops in kitchen & bath in-kind in each unit. replace 8 aluminum-framed windows on the front facade with new aluminum-clad, wood-framed windows with ogee lug details to match historic windows; interior alterations; and rear window replacement. | $18,000 |
| Dec 16, 2014 | Completed final sign-off Mar 2015 | 54 Gilbert St | reframe opening at 1nd and 2nd fl. replace e skylights. replace e bath and kitchen fixutres in kind. new elec meter,replace e water heater, replace e light fixtures in kind. add french drain at garage entrance. n/a ordinance #155-13Details
reframe opening at 1nd and 2nd fl. replace e skylights. replace e bath and kitchen fixutres in kind. new elec meter,replace e water heater, replace e light fixtures in kind. add french drain at garage entrance. n/a ordinance #155-13 | $35,000 |
| Sep 15, 2014 | Never finaled issued May 2015, no final | 62 Glover St | add 4th story & private roof deck. add living space & bathroom. infill lightwell (against blank walls). interior remodel. sprinkler building under seperate permit.Details
add 4th story & private roof deck. add living space & bathroom. infill lightwell (against blank walls). interior remodel. sprinkler building under seperate permit. | $96,000 |
| Aug 6, 2014 | Completed final sign-off Jan 2016 | 533 Greenwich St | front bldg:minor revision to app#201303192513. scope of revision: replace dryrot framing at rear bathrooms:remove extg lath and plaster throughout. replace with 5/8" gypDetails
front bldg:minor revision to app#201303192513. scope of revision: replace dryrot framing at rear bathrooms:remove extg lath and plaster throughout. replace with 5/8" gyp | $5,000 |
| Feb 5, 2014 | Completed final sign-off Feb 2015 | 341 Filbert St | add private roof deck and stair access for 341 only. add 1/2 bath at 4th fl. minor interior alteration at (e) dining roomDetails
add private roof deck and stair access for 341 only. add 1/2 bath at 4th fl. minor interior alteration at (e) dining room | $20,000 |
| Feb 5, 2014 | Expired or cancelled expired Aug 2017 | 727 Chenery St | kitchen & bath remodel @ units 727 and 729 replace existing plumbing & fixtures in kind, no structrual or wall workDetails
kitchen & bath remodel @ units 727 and 729 replace existing plumbing & fixtures in kind, no structrual or wall work | $15,000 |
| Oct 31, 2013 | Completed final sign-off Feb 2015 | 341 Filbert St | replace cabinets and appliances in kitchen; replace tile and fixtures in bathrooms; replace carpet with hardwoodDetails
replace cabinets and appliances in kitchen; replace tile and fixtures in bathrooms; replace carpet with hardwood | $75,000 |
| Oct 31, 2013 | Completed final sign-off Feb 2015 | 339 Filbert St | replace cabinets and appliances in kitchen, replace tile and fixtures in bathrooms, convert 1 tub to walk in shower, replace carpet with hardwoodDetails
replace cabinets and appliances in kitchen, replace tile and fixtures in bathrooms, convert 1 tub to walk in shower, replace carpet with hardwood | $25,000 |
| Jul 2, 2013 | Completed final sign-off Mar 2014 | 1239 Union St | add 2 new full bathrooms in (e) closetsDetails
add 2 new full bathrooms in (e) closets | $25,000 |
| Mar 19, 2013 | Completed final sign-off Jan 2016 | 533 Greenwich St | infill lightwell against blank wall; add decks within the buildable area; add private roof deck for #537 greenwich only; in-kind replacement of windows; add 1 bathroom #533,#535,#537.Details
infill lightwell against blank wall; add decks within the buildable area; add private roof deck for #537 greenwich only; in-kind replacement of windows; add 1 bathroom #533,#535,#537. | $150,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2013 | 855 Folsom St | bathroom remodel - remove and replace cabinets, fixtures & tileDetails
bathroom remodel - remove and replace cabinets, fixtures & tile | $9,000 |
| Dec 6, 2012 | Completed final sign-off Feb 2013 | 169 Eastwood Dr | bathroom remodel - remove and replace cabinets and fixtures. bathroom is on upper level. permanent bathroom lighting shall be either of hig-efficiency or controlled by manual occupancy sensors.Details
bathroom remodel - remove and replace cabinets and fixtures. bathroom is on upper level. permanent bathroom lighting shall be either of hig-efficiency or controlled by manual occupancy sensors. | $8,000 |
| Jul 5, 2012 | Completed final sign-off Apr 2016 | 1763 Stockton St | replace all (e) windows with wood frame in kind, reconfigure interior walls and stair, replace (e) roof joists with tji's reroof, and windows at west elevation, add private roof deck, add skylights, remodel bathrooms and kitchen, comply with complaint no 200994000Details
replace all (e) windows with wood frame in kind, reconfigure interior walls and stair, replace (e) roof joists with tji's reroof, and windows at west elevation, add private roof deck, add skylights, remodel bathrooms and kitchen, comply with complaint no 200994000 | $340,000 |
| Aug 24, 2011 | Completed final sign-off Mar 2013 | 525 Greenwich St | remodel bathrooms&kitchen,infill light well at bsmnt lvl&right side against a blank wall. replace frt windows w/in-kind(wood,dbl-hung,pane),repalce roof joists.structural strengthening.reconfigure interior ,new garage & exii door(wood)remove front egress(metal stairs).add roof deck w/railing,skylit.Details
remodel bathrooms&kitchen,infill light well at bsmnt lvl&right side against a blank wall. replace frt windows w/in-kind(wood,dbl-hung,pane),repalce roof joists.structural strengthening.reconfigure interior ,new garage & exii door(wood)remove front egress(metal stairs).add roof deck w/railing,skylit. | $200,000 |
| May 18, 2011 | Completed final sign-off Jul 2011 | 850 Bay St | add 2 bedrooms 1 bath within e bldg envelope. no modifications in sq footage, exterior elevations, strucutral. all work in unit 850, floors 2 and 3. no work in gr fl unit.Details
add 2 bedrooms 1 bath within e bldg envelope. no modifications in sq footage, exterior elevations, strucutral. all work in unit 850, floors 2 and 3. no work in gr fl unit. | $30,000 |
| Feb 7, 2011 | Completed final sign-off May 2011 | 150 Lombard St | kitchen and bath (2) remodel, hi -efficacy lighting on kitchen bath per cal title 24, no walls, doors, windows under this permitDetails
kitchen and bath (2) remodel, hi -efficacy lighting on kitchen bath per cal title 24, no walls, doors, windows under this permit | $20,000 |
| Feb 4, 2011 | Completed final sign-off May 2016 | 524 Vallejo St | interior reconfiguration (grd, first, second flr). expand third floor. replace all windows with in kind. add 1 bath @ unit#526.legalize 2 existing units to reflect 4 total. bldg will be fully sprinklered (under sep. permit)Details
interior reconfiguration (grd, first, second flr). expand third floor. replace all windows with in kind. add 1 bath @ unit#526.legalize 2 existing units to reflect 4 total. bldg will be fully sprinklered (under sep. permit) | $60,000 |
| Aug 12, 2010 | Completed final sign-off Jan 2012 | 1826 Mason St | revision to 201005132394: reconfigure interior walls. add 1/2 baths, struct modifications at basement to allow wider span (keep exterior wall)Details
revision to 201005132394: reconfigure interior walls. add 1/2 baths, struct modifications at basement to allow wider span (keep exterior wall) | $20,000 |
| Jun 30, 2010 | Completed final sign-off Jan 2012 | 250 Cervantes Bl | remodel kitchen & 2 bathrooms on 2nd floor, add 1 bathroom, convert storage to living space in garage. replace windows in kind. add skylightsDetails
remodel kitchen & 2 bathrooms on 2nd floor, add 1 bathroom, convert storage to living space in garage. replace windows in kind. add skylights | $150,000 |
| May 13, 2010 | Completed final sign-off Jan 2012 | 1826 Mason St | frnt bldg-remodel kit and baths, add 3 baths, repl all frnt wind w/ new in kind. , repe roof joists with tji's, reroof, ext parapet to 42" w setback from the facade rear bldg- remodel kits and baths, repl all windows, restore roof deck, relocate unit 1832 to basement. expand unit 1832a to 1st flrDetails
frnt bldg-remodel kit and baths, add 3 baths, repl all frnt wind w/ new in kind. , repe roof joists with tji's, reroof, ext parapet to 42" w setback from the facade rear bldg- remodel kits and baths, repl all windows, restore roof deck, relocate unit 1832 to basement. expand unit 1832a to 1st flr | $80,000 |
| May 13, 2010 | Expired or cancelled withdrawn May 2010 | 1832 Mason St | rear-bldg - remodel kitchens and bathrooms, replace all windows w casement, replace reoof joists with tji's, remove e roof to restore e deck, relocate unit 1832 to basement, expand unit 1832a to 1st floorDetails
rear-bldg - remodel kitchens and bathrooms, replace all windows w casement, replace reoof joists with tji's, remove e roof to restore e deck, relocate unit 1832 to basement, expand unit 1832a to 1st floor | $60,000 |
| Nov 18, 2009 | Completed final sign-off Mar 2010 | 262 15th Av | convert (e) inconditiones space at ground floor to a bathroom & storage. add door & closet to plyroom to became a bedroom. demo slabe tile @ (e) patio. put new wood deck, (e) good frame to remain.rebuild exterior stair with fir wall.Details
convert (e) inconditiones space at ground floor to a bathroom & storage. add door & closet to plyroom to became a bedroom. demo slabe tile @ (e) patio. put new wood deck, (e) good frame to remain.rebuild exterior stair with fir wall. | $30,000 |
| Nov 10, 2009 | Expired or cancelled cancelled Jan 2026 | 1763 Stockton St | reconfigure interior walls of bedroom, living rm, kitchen , bathrooms for all units. remodel kitchens and bathrooms. no exterior work.Details
reconfigure interior walls of bedroom, living rm, kitchen , bathrooms for all units. remodel kitchens and bathrooms. no exterior work. | $50,000 |
| Jan 28, 2009 | Completed final sign-off Aug 2009 | 2900 Pierce St | revision to appl #200807237435, complaint #200886231: eliminate interior stairway from unit #5 (3rd flr) to loft;relocate (e) 1/2 bath at loft; replace steel beam on unit #5 to a larger beam to eliminate a post;replace all roof joists & reroof;replace window of loft w/french doo;add eave, skylightsDetails
revision to appl #200807237435, complaint #200886231: eliminate interior stairway from unit #5 (3rd flr) to loft;relocate (e) 1/2 bath at loft; replace steel beam on unit #5 to a larger beam to eliminate a post;replace all roof joists & reroof;replace window of loft w/french doo;add eave, skylights | $20,000 |
| Oct 7, 2008 | Completed final sign-off May 2010 | 2101 20th Av | remodel 2 kitchen, remodel 4 bathrooms, add 2 1/2 bath to each unit. re-partition interior walls. change window with double pane replacement. remove unused curb cut on 20th aveDetails
remodel 2 kitchen, remodel 4 bathrooms, add 2 1/2 bath to each unit. re-partition interior walls. change window with double pane replacement. remove unused curb cut on 20th ave | $80,000 |
| Oct 3, 2008 | Completed final sign-off Mar 2009 | 844 Bay St | ref. appl#200410076269 r3-5 sh-5, interior improvement-no bearing wall. add wine cellar on 1st flr, re-tile bathrooms (3 1/2 bath), remove stairway in master bedroom, add closet in master bed/bathDetails
ref. appl#200410076269 r3-5 sh-5, interior improvement-no bearing wall. add wine cellar on 1st flr, re-tile bathrooms (3 1/2 bath), remove stairway in master bedroom, add closet in master bed/bath | $5,000 |
| Jul 23, 2008 | Completed final sign-off Aug 2009 | 2900 Pierce St | kitchen and bathroom remodel on all 6 units. add 1 bathroom per unit, relocate laundry rooms, upgrade (e) stair enclosure and bathroom in kind. replacement of all windows.Details
kitchen and bathroom remodel on all 6 units. add 1 bathroom per unit, relocate laundry rooms, upgrade (e) stair enclosure and bathroom in kind. replacement of all windows. | $210,000 |
| Apr 21, 2008 | Expired or cancelled expired Jan 2012 | 1264 Bush St | revision to 2008.02.07.4272 (no plans). plans are provided for bath and kitchen remodeling on all units requested by bldg inspector. replace drywlls for units of 1,3,5. replacement in kind windows at rear and side only ( none on front windows). non-structural wall removal & infill(n)int. walls.Details
revision to 2008.02.07.4272 (no plans). plans are provided for bath and kitchen remodeling on all units requested by bldg inspector. replace drywlls for units of 1,3,5. replacement in kind windows at rear and side only ( none on front windows). non-structural wall removal & infill(n)int. walls. | $48,000 |
| Mar 13, 2008 | Completed final sign-off Nov 2008 | 450 Vallejo St | front building: remodel kitchen and bath. upgrade plumbing and electrical. kitchen 50% flourescent, bath motion sensor light. total 3 kitchens and 3 bathroom.Details
front building: remodel kitchen and bath. upgrade plumbing and electrical. kitchen 50% flourescent, bath motion sensor light. total 3 kitchens and 3 bathroom. | $30,000 |
| Feb 7, 2008 | Completed final sign-off Aug 2008 | 1264 Bush St | kitchen and bath remodelDetails
kitchen and bath remodel | $60,000 |
| Dec 19, 2007 | Completed final sign-off Nov 2008 | 450 Vallejo St | #450a- convert existing storage on the ground floor to living space. this will add 1 bedroom & 1 bath to be connected to unit 450a with mew interior stairs. remodel existing bath and kitchen, replace fixtures and cabinets on #450a,Details
#450a- convert existing storage on the ground floor to living space. this will add 1 bedroom & 1 bath to be connected to unit 450a with mew interior stairs. remodel existing bath and kitchen, replace fixtures and cabinets on #450a, | $30,000 |
| Nov 8, 2007 | Completed final sign-off Jul 2008 | 469 South Van Ness Av | add 3 bathrooms in each unit. combine kitchen and dining rm (strutural dwg provided), replace all interior doors, replacement window in-kind, wood double hung.all interior lathe and plaster will replaced by 5/8" sheetrock type xDetails
add 3 bathrooms in each unit. combine kitchen and dining rm (strutural dwg provided), replace all interior doors, replacement window in-kind, wood double hung.all interior lathe and plaster will replaced by 5/8" sheetrock type x | $180,000 |
| Nov 7, 2007 | Completed final sign-off Jan 2009 | 450 Vallejo St | rear bldg. - work on #452a vallejo st. remodel kitchen, bath. plumbing. no structural. 50 % wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor.Details
rear bldg. - work on #452a vallejo st. remodel kitchen, bath. plumbing. no structural. 50 % wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $15,000 |
| Sep 24, 2007 | Completed final sign-off Nov 2007 | 1180 Greenwich St | remodel (two) bathrooms and replace gas fireplace with new gas fireplace. no exterior work. focus model: meiji focus ul#737 report#304-f-14-2 mebu t-24 energy compliance for lighting @ bathrooms.Details
remodel (two) bathrooms and replace gas fireplace with new gas fireplace. no exterior work. focus model: meiji focus ul#737 report#304-f-14-2 mebu t-24 energy compliance for lighting @ bathrooms. | $20,000 |
| Oct 26, 2006 | Completed final sign-off Mar 2007 | 333 Bush St | tenant improvement no structural work, kitchen cabinet replacement, bath, retileDetails
tenant improvement no structural work, kitchen cabinet replacement, bath, retile | $15,000 |
| Aug 23, 2005 | Completed final sign-off Nov 2005 | 1854 15th Av | remodel bathroom (downstair) & family room (downstair)Details
remodel bathroom (downstair) & family room (downstair) | $12,000 |
| Jul 8, 2005 | Completed final sign-off Sep 2005 | 333 Bush St | add lite switches 3 kitchen.remove & replace bathroom value(2). replace kitchen counter top.Details
add lite switches 3 kitchen.remove & replace bathroom value(2). replace kitchen counter top. | $3,000 |
| May 24, 2005 | Completed final sign-off Oct 2005 | 74 Brady St | remodel kitchen & bath.replace cabinet,countertop.replace sink,toilet,door.install flourescent lightDetails
remodel kitchen & bath.replace cabinet,countertop.replace sink,toilet,door.install flourescent light | $12,500 |