Block 0026, lot 015
850 Bay St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 2
- Rooms
- 6 bedrooms, 5 bathrooms
- Building
- 5,783 sq ft
- Lot
- 3,436 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2022 | Completed final sign-off Apr 2022 | 850 Bay St | Devlin/Mcnally Construction | to obtain final inspection for work approved under permit application no. 201805219711. all work is complete.Details
to obtain final inspection for work approved under permit application no. 201805219711. all work is complete. | |
| Dec 16, 2021 | Completed final sign-off Mar 2022 | 850 Bay St | Van Acker Const Assoc Inc | new 100 sf garden shed per sf planning code 13b(c) 22. revision to pa 2019-0801-7559 to reposition sheld to comply with complaint 202060811Details
new 100 sf garden shed per sf planning code 13b(c) 22. revision to pa 2019-0801-7559 to reposition sheld to comply with complaint 202060811 | |
| Aug 1, 2019 | Completed final sign-off Jan 2022 | 850 Bay St | Van Acker Const Assoc Inc | garden shed per sf planning code 136(c)22. no work to existing residence.Details
garden shed per sf planning code 136(c)22. no work to existing residence. | $2,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2018 | 850 Bay St | Olcan Construction Inc | replace dryrot siding at rear of house and framing members at rear of house. partial rear elevation, not visible from street.Details
replace dryrot siding at rear of house and framing members at rear of house. partial rear elevation, not visible from street. | $9,000 |
| May 21, 2018 | Completed final sign-off Apr 2022 | 850 Bay St | Devlin/Mcnally Construction | retrofit of rear yard retaining wall. install 6 tie-backs at wall. install wall anchors. installation to happen at 869 north point street (pa# 201806111552).Details
retrofit of rear yard retaining wall. install 6 tie-backs at wall. install wall anchors. installation to happen at 869 north point street (pa# 201806111552). | $20,000 |
| Jul 27, 2017 | Completed final sign-off Dec 2017 | 848 Bay St | Devlin/Mcnally Construction | revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded.Details
revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded. | $20,000 |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 850 Bay St | street spaceDetails
street space | ||
| Feb 9, 2016 | Completed final sign-off Dec 2017 | 848 Bay St | Northcoast Remodeling & Construction, Devlin/Mcnally Construction | extending elevator to roof. existing roof deck will be brought into current code complianceDetails
extending elevator to roof. existing roof deck will be brought into current code compliance | $100,000 |
| Apr 24, 2012 | Expired or cancelled cancelled Jan 2026 | 848 Bay St | Mcguire & Sons | new enetry gate at street entrance. approx 3' in height, 9' wide including return fenceDetails
new enetry gate at street entrance. approx 3' in height, 9' wide including return fence | $12,000 |
| May 18, 2011 | Completed final sign-off Jul 2011 | 850 Bay St | Sf Twin Boys Corp. Dba Master Builders | add 2 bedrooms 1 bath within e bldg envelope. no modifications in sq footage, exterior elevations, strucutral. all work in unit 850, floors 2 and 3. no work in gr fl unit.Details
add 2 bedrooms 1 bath within e bldg envelope. no modifications in sq footage, exterior elevations, strucutral. all work in unit 850, floors 2 and 3. no work in gr fl unit. | $30,000 |
| Feb 4, 2009 | Completed final sign-off Feb 2009 | 848 Bay St | Sf Twin Boys Corp. Dba Master Builders | to remove violation 200564276 for construction of retaining wall max. 3 ft above grade constructed without permit, and removal of temporary structure in rear yard to comply with nov #200788599.Details
to remove violation 200564276 for construction of retaining wall max. 3 ft above grade constructed without permit, and removal of temporary structure in rear yard to comply with nov #200788599. | $5,000 |
| Oct 9, 2007 | Never finaled issued Oct 2007, no final | 848 Bay St | street spaceDetails
street space | ||
| Jul 18, 2007 | Expired or cancelled expired Jul 2011 | 848 Bay St | Sf Twin Boys Corp. Dba Master Builders | per appl#200506155199 work in progress elevator shaft to be constructed 4 feet above the roof line. planning code sec. 260 par b allows for the shaft to be 16 feet tall.Details
per appl#200506155199 work in progress elevator shaft to be constructed 4 feet above the roof line. planning code sec. 260 par b allows for the shaft to be 16 feet tall. | $500 |
| Sep 19, 2005 | Never finaled issued Sep 2005, no final | 848 Bay St | street space permitDetails
street space permit | ||
| Jun 15, 2005 | Completed final sign-off Aug 2008 | 848 Bay St | Sf Twin Boys Corp. Dba Master Builders | add a garage,remodel,extend building.replace front alum windows back to wood frame casement windows. design complies with planning design guideline of 40' ht limit & 45% rear yard req.Details
add a garage,remodel,extend building.replace front alum windows back to wood frame casement windows. design complies with planning design guideline of 40' ht limit & 45% rear yard req. | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Devlin/Mcnally Construction (4), Sf Twin Boys Corp. Dba Master Builders (4), Van Acker Const Assoc Inc (2), Mcguire & Sons, Northcoast Remodeling & Construction, Olcan Construction Inc
- Architects
- Daniel Perez (2), John Ike (2), Jeanne Liem, Lawrence Liao