Block 0151, lot 046
62 Glover St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 2
- Units
- 2
- Rooms
- 5 bedrooms, 2 bathrooms
- Building
- 2,288 sq ft
- Lot
- 1,380 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 7, 2020 | Never finaled issued Feb 2020, no final | 62 Glover St | commencement of work not started under previously approved permit application pa# 2017-0726-3001.Details
commencement of work not started under previously approved permit application pa# 2017-0726-3001. | $20,000 | |
| Dec 5, 2019 | Completed final sign-off Aug 2021 | 62 Glover St | construct of new roof deck @ 3rd fl roof. (this work supersedes the approval under pa 2014 0914 6328 & 2017 0726 3001 as no work performed under these permits)Details
construct of new roof deck @ 3rd fl roof. (this work supersedes the approval under pa 2014 0914 6328 & 2017 0726 3001 as no work performed under these permits) | $30,000 | |
| Jul 26, 2017 | Never finaled issued Aug 2017, no final | 62 Glover St | reduce the size of existing roof deck from 600 sf to 300 sf add" ht railing. ref bpn 2014-0915-6327Details
reduce the size of existing roof deck from 600 sf to 300 sf add" ht railing. ref bpn 2014-0915-6327 | $20,000 | |
| Apr 3, 2015 | Never finaled issued Apr 2015, no final | 64 Glover St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Sep 15, 2014 | Never finaled issued May 2015, no final | 62 Glover St | Sf Twin Boys Corp. Dba Master Builders | add 4th story & private roof deck. add living space & bathroom. infill lightwell (against blank walls). interior remodel. sprinkler building under seperate permit.Details
add 4th story & private roof deck. add living space & bathroom. infill lightwell (against blank walls). interior remodel. sprinkler building under seperate permit. | $96,000 |
| Aug 14, 2007 | Never finaled issued Aug 2007, no final | 64 Glover St | street spaceDetails
street space | ||
| Jul 25, 2003 | Completed final sign-off Sep 2003 | 62 Glover St | per n.o.v#200342380. replace dry-rot rear yard exterion stairs, use all exterior grade lumber. inDetails
per n.o.v#200342380. replace dry-rot rear yard exterion stairs, use all exterior grade lumber. in | $13,000 | |
| Aug 1, 2001 | Expired or cancelled expired Dec 2001 | 62 Glover St | Excellent Technical Roofing Co, Inc. | reroofingDetails
reroofing | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Excellent Technical Roofing Co, Inc., Sf Twin Boys Corp. Dba Master Builders
- Architects
- Jeanne Liem
- Engineers
- Lawrence Liao
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.