San Francisco Commercial Builders Inc
- Based in
- Lafayette
- On San Francisco permits
- Mar 2002 to Apr 2026
- Last 24 months
- 17 permits filed
218 permits since 2000: 186 completed, 2 in progress, 14 never finaled, 16 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 59 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 580 California St | 23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.Details
23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit. | $190,000 |
| Mar 2, 2021 | Completed final sign-off Oct 2021 | 220 Bush St | 1/f: demolition of non structural partitions, stairs, millwork, light fixtures and finishes. construct non structural partitions, stairs, millwork. new power door operator and actuation bars at entry doors to remain lockers, ceilings, light fixtures and finishes.Details
1/f: demolition of non structural partitions, stairs, millwork, light fixtures and finishes. construct non structural partitions, stairs, millwork. new power door operator and actuation bars at entry doors to remain lockers, ceilings, light fixtures and finishes. | $367,000 |
| Oct 12, 2016 | Completed final sign-off Apr 2017 | 220 Montgomery St | arch full floor 20th: non-structural demo of extg tenant space. construct non-structural partitions, doors, lighting, electrical, ceiling and finishes. restroom upgrades. 90 min doors in direction of egress for exit stairs and 20 min doors for elevator lobby. mep and fire under separate permit.Details
arch full floor 20th: non-structural demo of extg tenant space. construct non-structural partitions, doors, lighting, electrical, ceiling and finishes. restroom upgrades. 90 min doors in direction of egress for exit stairs and 20 min doors for elevator lobby. mep and fire under separate permit. | $570,000 |
| Sep 20, 2012 | Completed final sign-off Jun 2013 | 50 Post St | renovation to (e) ground floor and lower level retail space. accessibility upgrades to tenant entry door, restrooms and stair replacement. installation of commericial kitchen, construction of new partitions, door, electrical plumbing and mech.Details
renovation to (e) ground floor and lower level retail space. accessibility upgrades to tenant entry door, restrooms and stair replacement. installation of commericial kitchen, construction of new partitions, door, electrical plumbing and mech. | $450,000 |
| Sep 30, 2003 | Completed final sign-off Feb 2004 | 240 Stockton St | 5th floor restroom upgrades. stairway lobby upgrade. no increase in office spaceDetails
5th floor restroom upgrades. stairway lobby upgrade. no increase in office space | $55,000 |
| Apr 3, 2003 | Completed final sign-off Nov 2003 | 240 Stockton St | upgrade restrooms on 2nd and 3rd floors, add handrail to stairs, change ceiling, floorDetails
upgrade restrooms on 2nd and 3rd floors, add handrail to stairs, change ceiling, floor | $75,000 |