Back to bathroom remodel contractors
Richard Avelar &Assoc Reconstr/Dba Recon
- Based in
- Concord
- On San Francisco permits
- Oct 2002 to Sep 2026
- Last 24 months
- 18 permits filed
195 permits since 2000: 142 completed, 13 in progress, 28 never finaled, 12 expired or cancelled.
Of the 28 never-finaled permits, 2 are 3 to 5 years old, 25 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 22 completed, 1 in progress, 11 never finaled. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2025 | Completed final sign-off Apr 2026 | 60 Carmelita St | fire damage repairs and restoration of finishes. replace all drywall, replace all recessed can lights and pendant fixtures. replace all bathroom finishes in both units. no adding or removing walls.Details
fire damage repairs and restoration of finishes. replace all drywall, replace all recessed can lights and pendant fixtures. replace all bathroom finishes in both units. no adding or removing walls. | $200,000 |
| Jul 10, 2024 | Completed final sign-off Jun 2025 | 2610 Post St | repair water damage & replace finishes on two small side yarddecks, 11x5 and 13x5. remove and reinstall (e) glass guardrails and replace in kind bathroom shower wall finishes and shower bench.Details
repair water damage & replace finishes on two small side yarddecks, 11x5 and 13x5. remove and reinstall (e) glass guardrails and replace in kind bathroom shower wall finishes and shower bench. | $120,000 |
| Dec 15, 2023 | In progress issued Jan 2024 | 4529 25th St | build new ground floor bathroom in existing storage room.Details
build new ground floor bathroom in existing storage room. | $40,000 |
| Oct 4, 2023 | Completed final sign-off Feb 2024 | 630 27th St | remodel existing kitchen, master bedroom and bathroom, new electrical and plumbing as required.Details
remodel existing kitchen, master bedroom and bathroom, new electrical and plumbing as required. | $90,000 |
| Sep 21, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | renovate guest bathroom and laundry room for the purpose of installing an infrared sauna as per the attached design plans.Details
renovate guest bathroom and laundry room for the purpose of installing an infrared sauna as per the attached design plans. | $80,000 |
| Aug 29, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | primary bathroom renovation, no layout changes. like for like work.Details
primary bathroom renovation, no layout changes. like for like work. | $10,000 |
| Oct 12, 2022 | Completed final sign-off Mar 2024 | 4529 25th St | replace weaterproofing system: repace in kind windows repair water damaged drywall and tile in master bedroom, media room, bathroom and both second floor bathrooms. also replaced damaged drywall in garage.Details
replace weaterproofing system: repace in kind windows repair water damaged drywall and tile in master bedroom, media room, bathroom and both second floor bathrooms. also replaced damaged drywall in garage. | $2,000,000 |
| Jan 19, 2022 | Completed final sign-off Mar 2024 | 630 27th St | remove and replace like for like stucco, lapsides and wood trim. replace like for like window and sliding door. reroof main roof. replace deck finishes. repair finishes in lower lever jack/jill bathroom.Details
remove and replace like for like stucco, lapsides and wood trim. replace like for like window and sliding door. reroof main roof. replace deck finishes. repair finishes in lower lever jack/jill bathroom. | $550,000 |
| Jan 10, 2022 | Completed final sign-off Sep 2022 | 24 White St | replace drywall, bathroom finishes in kind. electrical replacement in kind. repair existing flooring. drywall in 2nd floor bedroom & adjacent wall in master br & portion of cieling of hallway on 1st floor along with 1st floor bathroom below & adjacent drywall locations on 1st floor hallway & bedroomDetails
replace drywall, bathroom finishes in kind. electrical replacement in kind. repair existing flooring. drywall in 2nd floor bedroom & adjacent wall in master br & portion of cieling of hallway on 1st floor along with 1st floor bathroom below & adjacent drywall locations on 1st floor hallway & bedroom | $300,000 |
| Jun 15, 2021 | Never finaled issued Jun 2021, no final | 2424 Buchanan St | remove and reinstall bathroom fixtures. shower and toilet and vanity on 4th floor bath. no change in fixture count. same locations. non structural.Details
remove and reinstall bathroom fixtures. shower and toilet and vanity on 4th floor bath. no change in fixture count. same locations. non structural. | $25,000 |
| Mar 18, 2021 | Never finaled issued Mar 2021, no final | 348 Lombard St | remove and replace in kind bahroom fixtures, finishes in 2 bathrooms. 1-f toilet sink and shower. 2-f toilet, sink, tub, shower.Details
remove and replace in kind bahroom fixtures, finishes in 2 bathrooms. 1-f toilet sink and shower. 2-f toilet, sink, tub, shower. | $66,000 |
| Sep 29, 2020 | Completed final sign-off Jun 2024 | 324 Locust St | enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes.Details
enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes. | $28,000 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | hall bath, master bedroom, master bathroom, drywall repair and insulation replace due to water damage. repair in kind.Details
hall bath, master bedroom, master bathroom, drywall repair and insulation replace due to water damage. repair in kind. | $12,552 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | master bedroom, closet, laundry room, master vanity, master bath, repair to drywall and insulation due to water damage. repair in kind.Details
master bedroom, closet, laundry room, master vanity, master bath, repair to drywall and insulation due to water damage. repair in kind. | $26,700 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | living room, kitchen master bed closet, master hall, laundry room, master vanity, master bath repairs to drywall and insulation due to water damage.Details
living room, kitchen master bed closet, master hall, laundry room, master vanity, master bath repairs to drywall and insulation due to water damage. | $15,227 |
| Jan 10, 2019 | Completed final sign-off Jan 2019 | 501 Crescent Ct | revision to bldg app#2017-12-08-5966. additional work as follows: replace drywall, insulation and flooring, kitchen cabinets, shower pan/bath tub in guest bath, master bath, (2) bedrooms, kitchen, living room and laundry room. like for like materialsDetails
revision to bldg app#2017-12-08-5966. additional work as follows: replace drywall, insulation and flooring, kitchen cabinets, shower pan/bath tub in guest bath, master bath, (2) bedrooms, kitchen, living room and laundry room. like for like materials | $10,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 401 Crescent Wy | revision to bldg app#2017-12-13-6398. additional work as follows: replace drywall and flooring in (3) bedrroms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking.Details
revision to bldg app#2017-12-13-6398. additional work as follows: replace drywall and flooring in (3) bedrroms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. | $10,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 401 Crescent Wy | revision to bldg app#2017-12-13-6397. additional work as follows: replace drywall in (3) bedrooms, laundry, kitchen, living room and (2) bathrooms. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materialsDetails
revision to bldg app#2017-12-13-6397. additional work as follows: replace drywall in (3) bedrooms, laundry, kitchen, living room and (2) bathrooms. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materials | $10,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 401 Crescent Wy | revision to bldg app#2017-12-13-6400. additional work as follows: replace drywall and flooring in (3) bedrooms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materialsDetails
revision to bldg app#2017-12-13-6400. additional work as follows: replace drywall and flooring in (3) bedrooms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materials | $10,000 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 101 Crescent Wy | replace installation and drywall in bathroom. water leak caused by damage to drywall and installation. mitigation company already removed affected materials like for like.Details
replace installation and drywall in bathroom. water leak caused by damage to drywall and installation. mitigation company already removed affected materials like for like. | $7,583 |
| Aug 22, 2018 | Completed final sign-off Feb 2019 | 101 Crescent Wy | replace insulation and drywall in bathroom. water leak caused damage drywall and insulation. mitigation company already removed affected materials like for like.Details
replace insulation and drywall in bathroom. water leak caused damage drywall and insulation. mitigation company already removed affected materials like for like. | $7,583 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 401 Crescent Ct | repair work only. damage due to flooding. areas affected: master bedroom, master bathroom, master closet, living room and kitchen. replacing light fixtures in-kindDetails
repair work only. damage due to flooding. areas affected: master bedroom, master bathroom, master closet, living room and kitchen. replacing light fixtures in-kind | $52,114 |
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 401 Crescent Wy | unit 4409: repair water damage from leak in hallway laundry room, kitchen bedroom 3, bathroom 2, master closet, vanityDetails
unit 4409: repair water damage from leak in hallway laundry room, kitchen bedroom 3, bathroom 2, master closet, vanity | $17,854 |
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 401 Crescent Wy | unit 4209: repair water damage from lea in hallway, laundry room, kitchen, bedroom 3, bedroom 2, living room, master bathroom, master closet, master vanityDetails
unit 4209: repair water damage from lea in hallway, laundry room, kitchen, bedroom 3, bedroom 2, living room, master bathroom, master closet, master vanity | $33,867 |
| Dec 8, 2017 | Completed final sign-off Oct 2018 | 501 Crescent Wy | unit 5213. repairs in master bath, hallway, laundry room, kitchen, bathoom, bedroom 3, bedroom 2, living room and master bedroom. water damage drywall ceilings, floors.Details
unit 5213. repairs in master bath, hallway, laundry room, kitchen, bathoom, bedroom 3, bedroom 2, living room and master bedroom. water damage drywall ceilings, floors. | $116,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 501 Crescent Ct | repairs in master bath, hallway, laundry room, kitchen, bathroom, bedroom 3, bedroom 2, living room, master bedroom. water damaged walls, ceilings, floors, drywallDetails
repairs in master bath, hallway, laundry room, kitchen, bathroom, bedroom 3, bedroom 2, living room, master bedroom. water damaged walls, ceilings, floors, drywall | $92,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 501 Crescent Wy | unit 5113. repairs in living room,kitchen, master br, master bath, laundry room, bedroom 3, bathroom, bedroom 2, hallway, water damge wall ceilings, floors.Details
unit 5113. repairs in living room,kitchen, master br, master bath, laundry room, bedroom 3, bathroom, bedroom 2, hallway, water damge wall ceilings, floors. | $98,000 |
| Dec 8, 2017 | Completed final sign-off Nov 2018 | 501 Crescent Wy | unit 5313. repairs in master bath, hallway, laundry room, kitchen, bathoom, bedroom 3, bedroom 2, living room and master bedroom. water damage drywall ceilings, floors.Details
unit 5313. repairs in master bath, hallway, laundry room, kitchen, bathoom, bedroom 3, bedroom 2, living room and master bedroom. water damage drywall ceilings, floors. | $106,000 |
| Oct 6, 2017 | Completed final sign-off Aug 2018 | 3108 Jackson St | remodel 4th floor bathroom; n/a maherDetails
remodel 4th floor bathroom; n/a maher | $15,000 |
| Jun 1, 2017 | Completed final sign-off Aug 2018 | 3108 Jackson St | remodel interior bathrooms.Details
remodel interior bathrooms. | $30,000 |
| May 25, 2016 | Completed final sign-off Jun 2016 | 2062 Jackson St | remediate plumbing noise, remove tile and substrate at guest bath shower, remove plumbing pipes, increase diameter of plumbing penetrations in framing, add isolators, reinstall plumbing and tile. n/a ordinance #155-13Details
remediate plumbing noise, remove tile and substrate at guest bath shower, remove plumbing pipes, increase diameter of plumbing penetrations in framing, add isolators, reinstall plumbing and tile. n/a ordinance #155-13 | $6,000 |
| Aug 6, 2015 | Completed final sign-off Sep 2015 | 501 Crescent Ct | conduit repair @ unit 5206 due to defects resulting in water intrusion and related damage. inspect and repair damage @5206 shower and bath tub-gypsum wallboard, tile, water-proofing, surround, wood sheathing and framing.Details
conduit repair @ unit 5206 due to defects resulting in water intrusion and related damage. inspect and repair damage @5206 shower and bath tub-gypsum wallboard, tile, water-proofing, surround, wood sheathing and framing. | $36,500 |
| Aug 6, 2015 | Completed final sign-off Sep 2015 | 501 Crescent Ct | repair unit 5106 due to defects resulting in water intrusion and related damage. inspect and repair damage @5106 shower and bath tub-gypsum wallboard, tile, water-proofing, surround, wood sheathing and framing. remove or treat damaged materials to match existing.Details
repair unit 5106 due to defects resulting in water intrusion and related damage. inspect and repair damage @5106 shower and bath tub-gypsum wallboard, tile, water-proofing, surround, wood sheathing and framing. remove or treat damaged materials to match existing. | $8,850 |
| Dec 11, 2013 | Completed final sign-off Dec 2013 | 401 Crescent Ct | replace interior gyp @ ceiling of bathroom, texture and paint. 3 layers of 5/8" type "x" gyp. bd.Details
replace interior gyp @ ceiling of bathroom, texture and paint. 3 layers of 5/8" type "x" gyp. bd. | $2,500 |