Block 0864, lot 014
62 Carmelita St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 2
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,838 sq ft
- Lot
- 2,375 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2026 | Completed final sign-off May 2026 | 62 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | to obtain final inspection for work approved under pa# 202404290957. all work is complete.Details
to obtain final inspection for work approved under pa# 202404290957. all work is complete. | |
| Jul 21, 2025 | Completed final sign-off Apr 2026 | 60 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | fire damage repairs and restoration of finishes. replace all drywall, replace all recessed can lights and pendant fixtures. replace all bathroom finishes in both units. no adding or removing walls.Details
fire damage repairs and restoration of finishes. replace all drywall, replace all recessed can lights and pendant fixtures. replace all bathroom finishes in both units. no adding or removing walls. | $200,000 |
| Aug 9, 2024 | Completed final sign-off Apr 2026 | 60 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | new dormer at gable roof at rear of property with one new window facing rear yard. new handrail and guardrail at front stair.Details
new dormer at gable roof at rear of property with one new window facing rear yard. new handrail and guardrail at front stair. | $45,000 |
| Apr 29, 2024 | Expired or cancelled expired May 2026 | 62 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | fire damage repair for wall adjacent to 58 carmelita. remove and replace approx 250 sq ft siding and insulation and remove and replace 75 sw ft stucco like and kind.fire damage repair for wall adjacent to 58 carmelita.Details
fire damage repair for wall adjacent to 58 carmelita. remove and replace approx 250 sq ft siding and insulation and remove and replace 75 sw ft stucco like and kind.fire damage repair for wall adjacent to 58 carmelita. | $30,000 |
| Mar 21, 2022 | Completed final sign-off Jul 2022 | 60 Carmelita St | Bc United Construction Inc | revision to 202107134256 3rd fl: relocate elec panel, closet, skylight. roof relocate solar panelDetails
revision to 202107134256 3rd fl: relocate elec panel, closet, skylight. roof relocate solar panel | |
| Dec 9, 2021 | Completed final sign-off Jul 2022 | 60 Carmelita St | Bc United Construction Inc | revision to permit 202107134256. revise roof framing between grid line b to c. reinforce roof joist between grid line c to e.Details
revision to permit 202107134256. revise roof framing between grid line b to c. reinforce roof joist between grid line c to e. | |
| Oct 7, 2021 | Completed final sign-off Feb 2022 | 60 Carmelita St | New High Protection Roofing | reroofingDetails
reroofing | $16,000 |
| Aug 6, 2021 | Completed final sign-off Feb 2022 | 62 Carmelita St | Window Station Inc | replace 22 windows, 7 front facing windows, wood/wood integraded ogees. 15 non visible windows wood to alum wood clad. u factor less than or equal to 0.3Details
replace 22 windows, 7 front facing windows, wood/wood integraded ogees. 15 non visible windows wood to alum wood clad. u factor less than or equal to 0.3 | $58,000 |
| Jul 13, 2021 | Completed final sign-off Jul 2022 | 60 Carmelita St | Bc United Construction Inc | 3rd fl: convert e living rm into mstr bdrm with 4 fix bath and wic. remove wall at rear of unit to create open kitchen/lr, kitchen remode. add skylight abv stairwell.new laundry unit. new ele wall heat system for all habitable space. new domestic tankless whtr at rear of bldg.wndw replacement rear.Details
3rd fl: convert e living rm into mstr bdrm with 4 fix bath and wic. remove wall at rear of unit to create open kitchen/lr, kitchen remode. add skylight abv stairwell.new laundry unit. new ele wall heat system for all habitable space. new domestic tankless whtr at rear of bldg.wndw replacement rear. | $50,000 |
| May 8, 2018 | Completed final sign-off Dec 2018 | 60 Carmelita St | Green Bay Remodeling Inc. | remove existing pavers & reconstruct new driveway with permeable concrete driveway extending 3'-3" into public right of wayDetails
remove existing pavers & reconstruct new driveway with permeable concrete driveway extending 3'-3" into public right of way | $15,000 |
| Oct 13, 2017 | Never finaled issued Oct 2017, no final | 60 Carmelita St | street space permitDetails
street space permit | ||
| Sep 11, 2017 | Never finaled issued Sep 2017, no final | 60 Carmelita St | street spaceDetails
street space | ||
| Mar 2, 2017 | Completed final sign-off Apr 2018 | 60 Carmelita St | Green Bay Remodeling Inc. | install new garage and curbcut. create new driveway and landscape in front setback.Details
install new garage and curbcut. create new driveway and landscape in front setback. | $20,000 |
| Oct 28, 2016 | Never finaled issued Oct 2016, no final | 62 Carmelita St | street spaceDetails
street space | ||
| Sep 15, 2016 | Never finaled issued Sep 2016, no final | 62 Carmelita St | street spaceDetails
street space | ||
| Jul 26, 2016 | Never finaled issued Jul 2016, no final | 60 Carmelita St | street space permitDetails
street space permit | ||
| Apr 14, 2016 | Never finaled issued Apr 2016, no final | 60 Carmelita St | street spaceDetails
street space | ||
| Feb 9, 2016 | Completed final sign-off Jun 2016 | 60 Carmelita St | Bc United Construction Inc | revision to pa#201511051830 foundation revision @ south property line.Details
revision to pa#201511051830 foundation revision @ south property line. | |
| Jan 29, 2016 | Never finaled issued Jan 2016, no final | 60 Carmelita St | street spaceDetails
street space | ||
| Dec 10, 2015 | Completed final sign-off Sep 2016 | 60 Carmelita St | Bc United Construction Inc | revision to pa#201511051830. remodel (e) basement to create master bedroom. remodel main floor, upgrae structure, new foundation infill at rear. new window & doors at rear, new property line window at south property line.Details
revision to pa#201511051830. remodel (e) basement to create master bedroom. remodel main floor, upgrae structure, new foundation infill at rear. new window & doors at rear, new property line window at south property line. | $100,000 |
| Nov 5, 2015 | Completed final sign-off Sep 2016 | 60 Carmelita St | build new internal stairs to new ground floor living space. upgrade foundation and complete structural upgrades.Details
build new internal stairs to new ground floor living space. upgrade foundation and complete structural upgrades. | $150,000 | |
| Oct 23, 2015 | Completed final sign-off Sep 2016 | 60 Carmelita St | exploratory work for dryrot; open six 2'x2' opening in walls; open six 2'x2' openings in floor; work on basement level onlyDetails
exploratory work for dryrot; open six 2'x2' opening in walls; open six 2'x2' openings in floor; work on basement level only | $500 | |
| Oct 15, 2015 | Completed final sign-off Oct 2015 | 60 Carmelita St | administrative permit to reflect the legal use of this property as a 2 residential unit dwelling with 3 stories. based on city records & site visit by senior inspectors. curran.Details
administrative permit to reflect the legal use of this property as a 2 residential unit dwelling with 3 stories. based on city records & site visit by senior inspectors. curran. | ||
| Feb 11, 2009 | Completed final sign-off Mar 2009 | 62 Carmelita St | repair rotted wood from stairs in kind from stairs leak. replace sheet rock wall & ceiling . not visible from street. 20x8 + ceiling. district inspection to conduct site visit at start of work. see complaint #200989996Details
repair rotted wood from stairs in kind from stairs leak. replace sheet rock wall & ceiling . not visible from street. 20x8 + ceiling. district inspection to conduct site visit at start of work. see complaint #200989996 | $5,000 | |
| Sep 22, 2004 | Never finaled issued Sep 2004, no final | 60 Carmelita St | street space for scaffoldDetails
street space for scaffold | ||
| Jul 18, 2003 | Never finaled issued Jul 2003, no final | 60 Carmelita St | M M Roofing Co | reroofingDetails
reroofing | $7,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bc United Construction Inc (5), Richard Avelar &Assoc Reconstr/Dba Recon (4), Green Bay Remodeling Inc. (2), M M Roofing Co, New High Protection Roofing, Window Station Inc
- Engineers
- Erevan O'neill (4), Jeff Chow (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.