Block 6537, lot 011
4028 25th St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 5 bedrooms, 3 bathrooms
- Building
- 3,511 sq ft
- Lot
- 2,848 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | renovate guest bathroom and laundry room for the purpose of installing an infrared sauna as per the attached design plans.Details
renovate guest bathroom and laundry room for the purpose of installing an infrared sauna as per the attached design plans. | $80,000 |
| Aug 29, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | primary bathroom renovation, no layout changes. like for like work.Details
primary bathroom renovation, no layout changes. like for like work. | $10,000 |
| Mar 13, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace like and in-kind all 9 exterior windows and 3 sliding doors to correct water damage from leaking units. remove and replace stucco and siding like and in-kind to properly flash new windows. interior drywall repairs as needed to replace water damaged areas adjacent to windows..Details
remove and replace like and in-kind all 9 exterior windows and 3 sliding doors to correct water damage from leaking units. remove and replace stucco and siding like and in-kind to properly flash new windows. interior drywall repairs as needed to replace water damaged areas adjacent to windows.. | $800,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 4028 25th St | street spaceDetails
street space | ||
| May 15, 2017 | Completed final sign-off Oct 2017 | 4028 25th St | Eastwood Development Incorporated | window repair. replace leaking metal pan under 2nd floor bay window at front facade. demo stucco, remove windows, replace metal pan, reinstall windows ad replace stucco in-kind. u-factor 0.32 maxDetails
window repair. replace leaking metal pan under 2nd floor bay window at front facade. demo stucco, remove windows, replace metal pan, reinstall windows ad replace stucco in-kind. u-factor 0.32 max | $3,500 |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 4028 25th St | street spaceDetails
street space | ||
| Aug 6, 2015 | Completed final sign-off Mar 2016 | 4028 25th St | Jim Parr Dba Plumbing | install (46) sprinklers per nfpa #13-r & 2-inch combo fire underground per nfpa #24. ti. 201404294504Details
install (46) sprinklers per nfpa #13-r & 2-inch combo fire underground per nfpa #24. ti. 201404294504 | $13,000 |
| Jul 16, 2015 | Never finaled issued Jul 2015, no final | 4028 25th St | street space permit - rnewal of permit # 201501266619Details
street space permit - rnewal of permit # 201501266619 | ||
| Jan 26, 2015 | Completed final sign-off May 2016 | 4028 25th St | Eastwood Development Incorporated | provide temporary shoring to facilitate excavation & construction of the proposed garage additoin per approved pa#2014.0429.4504 for east property line only. north and west retaining wall shoring under separate addendum as necessary as determined by soils engineer.Details
provide temporary shoring to facilitate excavation & construction of the proposed garage additoin per approved pa#2014.0429.4504 for east property line only. north and west retaining wall shoring under separate addendum as necessary as determined by soils engineer. | $15,000 |
| Apr 29, 2014 | Completed final sign-off May 2016 | 4028 25th St | Eastwood Development Incorporated | remodel, alterations, & addition to (e) two story single family res'd. including:conversion of (e) 1st story from storage to habitalbe space, 3rd story vertical addition, addition of basement level w/garage, rear yard horiz addition. new front facade, interior remodel throughout . excavation & fullDetails
remodel, alterations, & addition to (e) two story single family res'd. including:conversion of (e) 1st story from storage to habitalbe space, 3rd story vertical addition, addition of basement level w/garage, rear yard horiz addition. new front facade, interior remodel throughout . excavation & full | $300,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Eastwood Development Incorporated (3), Richard Avelar &Assoc Reconstr/Dba Recon (3), Jim Parr Dba Plumbing
- Architects
- John Maniscalco
- Engineers
- Benjamin Lai
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.