Back to kitchen remodel contractors
Pro Design Builders
- Based in
- Brisbane
- On San Francisco permits
- Oct 2008 to Feb 2015
- Last 24 months
- 0 permits filed
28 permits since 2000: 25 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 never finaled. Typically 2 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2015 | Completed final sign-off Aug 2015 | 1714 24th Av | at garage level 1st floor - legalize (e) 2 bedrooms, construct walls for new bath, family, great room, wet bar & laundry. at 2nd flr-remodel (e) kitchen & dining, relocate (e) bathroom. new bathroom & den, new interior stair, replace side & back windows, relocate furnace & water heater.Details
at garage level 1st floor - legalize (e) 2 bedrooms, construct walls for new bath, family, great room, wet bar & laundry. at 2nd flr-remodel (e) kitchen & dining, relocate (e) bathroom. new bathroom & den, new interior stair, replace side & back windows, relocate furnace & water heater. | $40,000 |
| Mar 25, 2014 | Completed final sign-off Jul 2014 | 217 Octavia St | remodel existing kitchen & bathroom. convert laundry room to full bathroom, replace furnace, add recess lights, add door & closet to dining room to bedroom.Details
remodel existing kitchen & bathroom. convert laundry room to full bathroom, replace furnace, add recess lights, add door & closet to dining room to bedroom. | $25,000 |
| Nov 22, 2013 | Completed final sign-off Oct 2014 | 1770 10th Av | at first floor, remodel (e) flr space w/ bathroom, family, playroom, and bedroom. at second floor infill (e) interior lightwell, remodel (e) bathroom and kitchen and new home office and bathroom. new rear deck. repair (e) rear deck and new interior stair per plan.Details
at first floor, remodel (e) flr space w/ bathroom, family, playroom, and bedroom. at second floor infill (e) interior lightwell, remodel (e) bathroom and kitchen and new home office and bathroom. new rear deck. repair (e) rear deck and new interior stair per plan. | $100,000 |
| Aug 12, 2013 | Completed final sign-off Mar 2014 | 1766 10th Av | alter (e) floor layout including construction of interior walls, new elec, outlets & light fixtures. 1st flr: new bedroom,bathroom,family, playroom, laundry & new deck. 2nd flr: remodel kitchen, new bath, remodel bath, new home office, infill lightwells, new int stair.Details
alter (e) floor layout including construction of interior walls, new elec, outlets & light fixtures. 1st flr: new bedroom,bathroom,family, playroom, laundry & new deck. 2nd flr: remodel kitchen, new bath, remodel bath, new home office, infill lightwells, new int stair. | $48,000 |
| Jun 13, 2013 | Completed final sign-off Sep 2013 | 865 Vallejo St | remodel kitchen and bath plumbing to remain in same location. no structural work to be done. replace windows and 2 glass doors same for same.Details
remodel kitchen and bath plumbing to remain in same location. no structural work to be done. replace windows and 2 glass doors same for same. | $25,000 |
| Jul 9, 2012 | Completed final sign-off Nov 2012 | 1870 Jackson St | work in unit 203: remodel kitchen and (3) full bathrooms, add recessed lighting in living room and dining room.Details
work in unit 203: remodel kitchen and (3) full bathrooms, add recessed lighting in living room and dining room. | $30,000 |
| Feb 3, 2012 | Completed final sign-off Aug 2012 | 3678 23rd St | general remodel, retile bathroom and kitchen, replace cabinets, drywall, paint, add lighting, plumbing changes, replace 3 windows, not visable from street, u factor=0.40. lighting shall comply with title 24.Details
general remodel, retile bathroom and kitchen, replace cabinets, drywall, paint, add lighting, plumbing changes, replace 3 windows, not visable from street, u factor=0.40. lighting shall comply with title 24. | $20,000 |
| Nov 23, 2011 | Completed final sign-off Jan 2013 | 1598 15th Av | remodel kitchen, remodel 2 full bathrooms, no structural work, repl 6 windows lighting to comply with cec 150k, max u factor .40 for windowDetails
remodel kitchen, remodel 2 full bathrooms, no structural work, repl 6 windows lighting to comply with cec 150k, max u factor .40 for window | $25,000 |
| Apr 25, 2011 | Completed final sign-off Aug 2013 | 1204 Treat Av | interior remodel of existing two unit residence to include new kitchen and bathrooms, cabinetry in both units. no alternation to exterior of building.Details
interior remodel of existing two unit residence to include new kitchen and bathrooms, cabinetry in both units. no alternation to exterior of building. | $235,000 |
| Jul 6, 2010 | Completed final sign-off Dec 2010 | 3580 Folsom St | remodel 2 baths, remodel kitchen, add staits to downstairs, add new heat furnaceDetails
remodel 2 baths, remodel kitchen, add staits to downstairs, add new heat furnace | $30,000 |
| May 24, 2010 | Completed final sign-off May 2011 | 2445 Washington St | remodel 1st and 2nd floor. repair and extend (e) deck at rear. replace windows. remodel kitchen and baths. add skylight. new electrical service. replace furnace. add new full bath on 2nd floorDetails
remodel 1st and 2nd floor. repair and extend (e) deck at rear. replace windows. remodel kitchen and baths. add skylight. new electrical service. replace furnace. add new full bath on 2nd floor | $150,000 |
| Oct 2, 2009 | Never finaled issued Nov 2009, no final | 759 06th Av | interior remodel of unit 4 to comply with nov 200921157 dated 9-30-09. convert (e) kitchen to den and convert (e) to kitchen.Details
interior remodel of unit 4 to comply with nov 200921157 dated 9-30-09. convert (e) kitchen to den and convert (e) to kitchen. | $3,000 |