Pro Design Builders
- Based in
- Brisbane
- On San Francisco permits
- Oct 2008 to Feb 2015
- Last 24 months
- 0 permits filed
28 permits since 2000: 25 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 7 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2013 | Completed final sign-off Oct 2014 | 1770 10th Av | at first floor, remodel (e) flr space w/ bathroom, family, playroom, and bedroom. at second floor infill (e) interior lightwell, remodel (e) bathroom and kitchen and new home office and bathroom. new rear deck. repair (e) rear deck and new interior stair per plan.Details
at first floor, remodel (e) flr space w/ bathroom, family, playroom, and bedroom. at second floor infill (e) interior lightwell, remodel (e) bathroom and kitchen and new home office and bathroom. new rear deck. repair (e) rear deck and new interior stair per plan. | $100,000 |
| Aug 12, 2013 | Completed final sign-off Mar 2014 | 1766 10th Av | alter (e) floor layout including construction of interior walls, new elec, outlets & light fixtures. 1st flr: new bedroom,bathroom,family, playroom, laundry & new deck. 2nd flr: remodel kitchen, new bath, remodel bath, new home office, infill lightwells, new int stair.Details
alter (e) floor layout including construction of interior walls, new elec, outlets & light fixtures. 1st flr: new bedroom,bathroom,family, playroom, laundry & new deck. 2nd flr: remodel kitchen, new bath, remodel bath, new home office, infill lightwells, new int stair. | $48,000 |
| May 13, 2011 | Completed final sign-off Aug 2013 | 1204 Treat Av | new 3 story horizontal addition @ rear including new rear decks. new stair @ side. new windows & doors. area to be excavated @ ground floor.Details
new 3 story horizontal addition @ rear including new rear decks. new stair @ side. new windows & doors. area to be excavated @ ground floor. | $155,000 |
| May 24, 2010 | Completed final sign-off May 2011 | 2445 Washington St | remodel 1st and 2nd floor. repair and extend (e) deck at rear. replace windows. remodel kitchen and baths. add skylight. new electrical service. replace furnace. add new full bath on 2nd floorDetails
remodel 1st and 2nd floor. repair and extend (e) deck at rear. replace windows. remodel kitchen and baths. add skylight. new electrical service. replace furnace. add new full bath on 2nd floor | $150,000 |