Pro Design Builders
- Based in
- Brisbane
- On San Francisco permits
- Oct 2008 to Feb 2015
- Last 24 months
- 0 permits filed
28 permits since 2000: 25 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 8 days from filing to permit and 207 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2015 | Completed final sign-off Aug 2015 | 1714 24th Av | at garage level 1st floor - legalize (e) 2 bedrooms, construct walls for new bath, family, great room, wet bar & laundry. at 2nd flr-remodel (e) kitchen & dining, relocate (e) bathroom. new bathroom & den, new interior stair, replace side & back windows, relocate furnace & water heater.Details
at garage level 1st floor - legalize (e) 2 bedrooms, construct walls for new bath, family, great room, wet bar & laundry. at 2nd flr-remodel (e) kitchen & dining, relocate (e) bathroom. new bathroom & den, new interior stair, replace side & back windows, relocate furnace & water heater. | $40,000 |
| Nov 22, 2013 | Completed final sign-off Oct 2014 | 1770 10th Av | at first floor, remodel (e) flr space w/ bathroom, family, playroom, and bedroom. at second floor infill (e) interior lightwell, remodel (e) bathroom and kitchen and new home office and bathroom. new rear deck. repair (e) rear deck and new interior stair per plan.Details
at first floor, remodel (e) flr space w/ bathroom, family, playroom, and bedroom. at second floor infill (e) interior lightwell, remodel (e) bathroom and kitchen and new home office and bathroom. new rear deck. repair (e) rear deck and new interior stair per plan. | $100,000 |
| Aug 12, 2013 | Completed final sign-off Mar 2014 | 1766 10th Av | alter (e) floor layout including construction of interior walls, new elec, outlets & light fixtures. 1st flr: new bedroom,bathroom,family, playroom, laundry & new deck. 2nd flr: remodel kitchen, new bath, remodel bath, new home office, infill lightwells, new int stair.Details
alter (e) floor layout including construction of interior walls, new elec, outlets & light fixtures. 1st flr: new bedroom,bathroom,family, playroom, laundry & new deck. 2nd flr: remodel kitchen, new bath, remodel bath, new home office, infill lightwells, new int stair. | $48,000 |
| Sep 15, 2011 | Completed final sign-off Mar 2012 | 444 Roosevelt Wy | revision to permit app#201001154831. revision to interior remodel to include relocation of interior stairs, relocation of bathroom, removal of interior stair and non structural walls.Details
revision to permit app#201001154831. revision to interior remodel to include relocation of interior stairs, relocation of bathroom, removal of interior stair and non structural walls. | |
| May 13, 2011 | Completed final sign-off Aug 2013 | 1204 Treat Av | new 3 story horizontal addition @ rear including new rear decks. new stair @ side. new windows & doors. area to be excavated @ ground floor.Details
new 3 story horizontal addition @ rear including new rear decks. new stair @ side. new windows & doors. area to be excavated @ ground floor. | $155,000 |