Prime Construction & Renovation Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jun 2026
- Last 24 months
- 21 permits filed
75 permits since 2000: 58 completed, 10 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 7 completed, 1 in progress, 1 expired or cancelled. Typically 68 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2025 | Completed final sign-off Apr 2026 | 3055 Baker St | 1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor.Details
1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor. | $50,000 |
| Sep 17, 2024 | Completed final sign-off Mar 2026 | 1902 Baker St | (e) wall between detached garage to be removed. convert (e) 2 garage doors into one within the same opening. install (n) 6ft iron fence at front. add (n) staircase and guardrail inside garage. add new staircase and guardrail inside garage. add 42" height guardrail at front of deck. add 8' 1 hr ratedDetails
(e) wall between detached garage to be removed. convert (e) 2 garage doors into one within the same opening. install (n) 6ft iron fence at front. add (n) staircase and guardrail inside garage. add new staircase and guardrail inside garage. add 42" height guardrail at front of deck. add 8' 1 hr rated | $50,000 |
| Jul 3, 2024 | In progress issued Sep 2024 | 944 Rockdale Dr | residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required.Details
residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required. | $192,000 |
| Apr 14, 2022 | Completed final sign-off Apr 2024 | 1466 Jackson St | rev to bpa#201809241227 & 201903266268. replacement of front exterior stair to basement w/new compliant stair w/encroachment.Details
rev to bpa#201809241227 & 201903266268. replacement of front exterior stair to basement w/new compliant stair w/encroachment. | |
| Oct 14, 2020 | Completed final sign-off Sep 2023 | 109 Pierce St | expansion of conditional iv space to basement at 113 w/ (n) stair, bedrm, bath & fam rm. (n) roof deck at attic level w/ int stair@ 109.Details
expansion of conditional iv space to basement at 113 w/ (n) stair, bedrm, bath & fam rm. (n) roof deck at attic level w/ int stair@ 109. | $84,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2019 | 109 Pierce St | emergency partial repair of rear stair. no work visible to street. to comply with nov #201889001 #10.Details
emergency partial repair of rear stair. no work visible to street. to comply with nov #201889001 #10. | $1,000 |
| Feb 22, 2019 | Expired or cancelled cancelled Jul 2019 | 109 Pierce St | expand conditioned living space at unit #109 to basement w.new interior stair, new bedroom, bath & family room; new private roof deck for unit 113 at attic level w/new interior stairs. new dormer. no work at middle unit.Details
expand conditioned living space at unit #109 to basement w.new interior stair, new bedroom, bath & family room; new private roof deck for unit 113 at attic level w/new interior stairs. new dormer. no work at middle unit. | $40,000 |
| Jul 23, 2018 | Completed final sign-off Oct 2023 | 109 Pierce St | replacement in kind of rear egress stair at all floor level for required means of egress; repair less than 50% structure laundry roomsDetails
replacement in kind of rear egress stair at all floor level for required means of egress; repair less than 50% structure laundry rooms | $100,000 |
| Feb 28, 2017 | Completed final sign-off Feb 2018 | 3247 Steiner St | convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversionDetails
convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversion | $100,000 |