Prime Construction & Renovation Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jun 2026
- Last 24 months
- 21 permits filed
75 permits since 2000: 58 completed, 10 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 in progress. Typically 44 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2024 | Completed final sign-off Mar 2026 | 1902 Baker St | (e) wall between detached garage to be removed. convert (e) 2 garage doors into one within the same opening. install (n) 6ft iron fence at front. add (n) staircase and guardrail inside garage. add new staircase and guardrail inside garage. add 42" height guardrail at front of deck. add 8' 1 hr ratedDetails
(e) wall between detached garage to be removed. convert (e) 2 garage doors into one within the same opening. install (n) 6ft iron fence at front. add (n) staircase and guardrail inside garage. add new staircase and guardrail inside garage. add 42" height guardrail at front of deck. add 8' 1 hr rated | $50,000 |
| Jul 3, 2024 | In progress issued Sep 2024 | 944 Rockdale Dr | residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required.Details
residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required. | $192,000 |
| Jun 9, 2022 | Completed final sign-off Jul 2022 | 160 Swiss Av | replacement of deck boards at ground level deck. less than 50% deck replacement (at rear of building).Details
replacement of deck boards at ground level deck. less than 50% deck replacement (at rear of building). | $7,000 |