Back to kitchen remodel contractors
Prime Construction & Renovation Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jun 2026
- Last 24 months
- 21 permits filed
75 permits since 2000: 58 completed, 10 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 19 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | In progress issued May 2026 | 3779 25th St | the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom.Details
the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom. | $225,000 |
| Dec 2, 2025 | Completed final sign-off May 2026 | 47 Fair Oaks St | unit b: remodel 1 bathroom 1 kitchen in kind like for like. no other work under this permit. no alteration of wall, window or door.Details
unit b: remodel 1 bathroom 1 kitchen in kind like for like. no other work under this permit. no alteration of wall, window or door. | $100,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 3743 20th St | unit b upper: paint (e) kitchen cabs, replace countertops, new undermount sink. paint bathroom, replace (e) surface light fixtures in bathr.. refinish floors, paint remainder of unit. all work in-kind, no structural work.Details
unit b upper: paint (e) kitchen cabs, replace countertops, new undermount sink. paint bathroom, replace (e) surface light fixtures in bathr.. refinish floors, paint remainder of unit. all work in-kind, no structural work. | $3,500 |
| Oct 9, 2025 | Completed final sign-off Dec 2025 | 176 Escolta Wy | replace kitchen cabinets, and appliances. remove and replace insulation, and sheetrock damaged by moisture in hall and bedrooms. replace knob and tubes electrical. resurface bathroom tiles, new vanity, plumbing fixtures. no layout change.Details
replace kitchen cabinets, and appliances. remove and replace insulation, and sheetrock damaged by moisture in hall and bedrooms. replace knob and tubes electrical. resurface bathroom tiles, new vanity, plumbing fixtures. no layout change. | $100,000 |
| Aug 11, 2025 | Completed final sign-off Apr 2026 | 843 35th Av | 2nd floor: remodel kitchen in kind. kitchen approx. 130 sq ft. 1st floor: repair water damaged sheet rock. approx 200 sq ft of ceiling and 200 sq ft of walls. all sheet rock to be 5/8" type xDetails
2nd floor: remodel kitchen in kind. kitchen approx. 130 sq ft. 1st floor: repair water damaged sheet rock. approx 200 sq ft of ceiling and 200 sq ft of walls. all sheet rock to be 5/8" type x | $50,000 |
| Jun 24, 2025 | Completed final sign-off Apr 2026 | 3055 Baker St | 1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor.Details
1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor. | $50,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 3817 22nd St | kitchen remodel in kind and bathroom remodel with new layout on 3rd floor., replace 2 windows at rear within same openingDetails
kitchen remodel in kind and bathroom remodel with new layout on 3rd floor., replace 2 windows at rear within same opening | $75,000 |
| Aug 27, 2024 | Completed final sign-off Oct 2024 | 1317 Hyde St | unit #4: kitchen remodel inkind, replace light fixtures, refinish floor, paint. all work repair in kind; no structural changes.Details
unit #4: kitchen remodel inkind, replace light fixtures, refinish floor, paint. all work repair in kind; no structural changes. | $100,000 |
| Aug 13, 2024 | Expired or cancelled expired Apr 2026 | 1902 Baker St | remodel in kind one bathroom and one kitchen. exploratory demo of garage roof deck and roof membrane to determine extents of dryrot damage - 15 sq. ft max- patch/repair exploratory demo area roof membrane and decking in kind and maintain fire rating.Details
remodel in kind one bathroom and one kitchen. exploratory demo of garage roof deck and roof membrane to determine extents of dryrot damage - 15 sq. ft max- patch/repair exploratory demo area roof membrane and decking in kind and maintain fire rating. | $75,000 |
| Jul 3, 2024 | In progress issued Sep 2024 | 944 Rockdale Dr | residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required.Details
residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required. | $192,000 |
| Jul 2, 2024 | Completed final sign-off Mar 2025 | 14 Costa St | water damage repair: replace in kind, 2 bathrooms, one kitchen, 1st floor sheetrock. no visible work from street.Details
water damage repair: replace in kind, 2 bathrooms, one kitchen, 1st floor sheetrock. no visible work from street. | $90,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2025 | 1517 08th Av | remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior workDetails
remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior work | $100,000 |
| Dec 1, 2022 | Completed final sign-off Jul 2024 | 48 Retiro Wy | expand conditioned space to 1/f for common room and bath. renovate unit 48 and 50 with reconfigured kitchens, baths, and 2nd bath at each unit. remove walls b/t living and dining rooms at both units. replace (e) windows on front; in-kind, wood, true divided lite, match pattern.Details
expand conditioned space to 1/f for common room and bath. renovate unit 48 and 50 with reconfigured kitchens, baths, and 2nd bath at each unit. remove walls b/t living and dining rooms at both units. replace (e) windows on front; in-kind, wood, true divided lite, match pattern. | $225,000 |
| Oct 12, 2022 | Completed final sign-off Jun 2023 | 3440 19th St | remodel rear kitchen "nook" in unit 3440 19th st (3rd fl). remove non-structural wall between nook & kitchen. replace existing door + window w/ new sliding glass door; max u val = 0.3. no work to front of building.Details
remodel rear kitchen "nook" in unit 3440 19th st (3rd fl). remove non-structural wall between nook & kitchen. replace existing door + window w/ new sliding glass door; max u val = 0.3. no work to front of building. | $15,000 |
| Sep 20, 2022 | Completed final sign-off Nov 2022 | 722 Balboa St | 1 (e) kitchen: replace ktichen counters & plumbing fixtures. 1 (e) bathroom: replce 1 vanity & toilet. refinish floors & paint interior. all work in kind. no structural.Details
1 (e) kitchen: replace ktichen counters & plumbing fixtures. 1 (e) bathroom: replce 1 vanity & toilet. refinish floors & paint interior. all work in kind. no structural. | $10,000 |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 651 Central Av | revision to pa# 202105250941. renovation to kitchen & bathrooom at 3rd fl. remove (e) non-bearing walls. add plywood sheathed wall.Details
revision to pa# 202105250941. renovation to kitchen & bathrooom at 3rd fl. remove (e) non-bearing walls. add plywood sheathed wall. | $5,000 |
| May 25, 2021 | Completed final sign-off Nov 2021 | 651 Central Av | replace 1 bath in kind. replace 1 kitchen in kind. no alteration of wall, window or door.Details
replace 1 bath in kind. replace 1 kitchen in kind. no alteration of wall, window or door. | $40,000 |
| Dec 7, 2020 | Never finaled issued Dec 2020, no final | 1466 Jackson St | unit #1466 & 1468: remodel kitchen & bathroom in-kind.Details
unit #1466 & 1468: remodel kitchen & bathroom in-kind. | $1,000 |
| Dec 7, 2020 | Completed final sign-off Nov 2021 | 649 Central Av | unit 649 - renovation of kitchen and bathroom at second floor. upgrade existing foundation at 1st floor.Details
unit 649 - renovation of kitchen and bathroom at second floor. upgrade existing foundation at 1st floor. | $45,000 |
| Jul 8, 2020 | Completed final sign-off Sep 2020 | 371 Wawona St | kitchen remodel in-kind: new cabinets, new flooring & counter. (12x12).Details
kitchen remodel in-kind: new cabinets, new flooring & counter. (12x12). | $25,000 |
| Jun 30, 2020 | Completed final sign-off Jan 2024 | 1466 Jackson St | residential dwelling unit interior renovations into existing residential building. demo non structural interior partitions and interior renovation of e bedroom, e baths, and e kitchen at e 2nd and 3rd fl units. interior structural seismic upgrade for e 2nd and 3rd fl units. home office w break areaDetails
residential dwelling unit interior renovations into existing residential building. demo non structural interior partitions and interior renovation of e bedroom, e baths, and e kitchen at e 2nd and 3rd fl units. interior structural seismic upgrade for e 2nd and 3rd fl units. home office w break area | $100,000 |
| Aug 3, 2017 | Completed final sign-off Feb 2018 | 3245 Steiner St | renovate kitchen, reconfigure existing bath, add a new master bath @ 3/f unit #3245Details
renovate kitchen, reconfigure existing bath, add a new master bath @ 3/f unit #3245 | $50,000 |
| Feb 28, 2017 | Completed final sign-off Feb 2018 | 3247 Steiner St | convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversionDetails
convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversion | $100,000 |