Back to bathroom remodel contractors
Prime Construction & Renovation Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jun 2026
- Last 24 months
- 21 permits filed
75 permits since 2000: 58 completed, 10 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 26 completed, 4 in progress, 1 never finaled, 3 expired or cancelled. Typically 8 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | In progress issued May 2026 | 3779 25th St | the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom.Details
the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom. | $225,000 |
| Dec 2, 2025 | Completed final sign-off May 2026 | 47 Fair Oaks St | unit b: remodel 1 bathroom 1 kitchen in kind like for like. no other work under this permit. no alteration of wall, window or door.Details
unit b: remodel 1 bathroom 1 kitchen in kind like for like. no other work under this permit. no alteration of wall, window or door. | $100,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 1866 Church St | 2 bathroom remodel. 2 tub to shower conversions. no alteration of wall, window or door.Details
2 bathroom remodel. 2 tub to shower conversions. no alteration of wall, window or door. | $65,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 3743 20th St | unit b upper: paint (e) kitchen cabs, replace countertops, new undermount sink. paint bathroom, replace (e) surface light fixtures in bathr.. refinish floors, paint remainder of unit. all work in-kind, no structural work.Details
unit b upper: paint (e) kitchen cabs, replace countertops, new undermount sink. paint bathroom, replace (e) surface light fixtures in bathr.. refinish floors, paint remainder of unit. all work in-kind, no structural work. | $3,500 |
| Oct 9, 2025 | Completed final sign-off Dec 2025 | 176 Escolta Wy | replace kitchen cabinets, and appliances. remove and replace insulation, and sheetrock damaged by moisture in hall and bedrooms. replace knob and tubes electrical. resurface bathroom tiles, new vanity, plumbing fixtures. no layout change.Details
replace kitchen cabinets, and appliances. remove and replace insulation, and sheetrock damaged by moisture in hall and bedrooms. replace knob and tubes electrical. resurface bathroom tiles, new vanity, plumbing fixtures. no layout change. | $100,000 |
| Jun 24, 2025 | Completed final sign-off Apr 2026 | 3055 Baker St | 1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor.Details
1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor. | $50,000 |
| Feb 19, 2025 | Completed final sign-off Nov 2025 | 142 Elsie St | new full bath and closet at garage level.no structuralDetails
new full bath and closet at garage level.no structural | $10,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 3817 22nd St | kitchen remodel in kind and bathroom remodel with new layout on 3rd floor., replace 2 windows at rear within same openingDetails
kitchen remodel in kind and bathroom remodel with new layout on 3rd floor., replace 2 windows at rear within same opening | $75,000 |
| Oct 1, 2024 | Completed final sign-off Mar 2025 | 14 Costa St | remodel primary bathroom in kind. move primary bedroom door.Details
remodel primary bathroom in kind. move primary bedroom door. | $45,000 |
| Sep 11, 2024 | Expired or cancelled expired Apr 2026 | 1902 Baker St | 1st fl. demolish (e) built in closet at bedroom 3, remodel (e) bathroom; 2nf fl. remodel (e) bathroom at den. note: bathroom work not related to pa# 2024-0813-8484.Details
1st fl. demolish (e) built in closet at bedroom 3, remodel (e) bathroom; 2nf fl. remodel (e) bathroom at den. note: bathroom work not related to pa# 2024-0813-8484. | $75,000 |
| Aug 13, 2024 | Expired or cancelled expired Apr 2026 | 1902 Baker St | remodel in kind one bathroom and one kitchen. exploratory demo of garage roof deck and roof membrane to determine extents of dryrot damage - 15 sq. ft max- patch/repair exploratory demo area roof membrane and decking in kind and maintain fire rating.Details
remodel in kind one bathroom and one kitchen. exploratory demo of garage roof deck and roof membrane to determine extents of dryrot damage - 15 sq. ft max- patch/repair exploratory demo area roof membrane and decking in kind and maintain fire rating. | $75,000 |
| Jul 3, 2024 | In progress issued Sep 2024 | 944 Rockdale Dr | residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required.Details
residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required. | $192,000 |
| Jul 2, 2024 | Completed final sign-off Mar 2025 | 14 Costa St | water damage repair: replace in kind, 2 bathrooms, one kitchen, 1st floor sheetrock. no visible work from street.Details
water damage repair: replace in kind, 2 bathrooms, one kitchen, 1st floor sheetrock. no visible work from street. | $90,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 1487 Greenwich St | unit 1, 1st fl - new powder room, existing full bathroom remodelDetails
unit 1, 1st fl - new powder room, existing full bathroom remodel | $10,000 |
| May 1, 2024 | Completed final sign-off Nov 2024 | 62 Idora Av | new bathroom, new family room. all on ground flr.Details
new bathroom, new family room. all on ground flr. | $20,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2025 | 1517 08th Av | remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior workDetails
remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior work | $100,000 |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 3440 19th St | 1st fl rear (shop) accessory structure to unit 3440. new half bathroom and closet. not for sleeping purposes.Details
1st fl rear (shop) accessory structure to unit 3440. new half bathroom and closet. not for sleeping purposes. | $30,000 |
| May 22, 2023 | Completed final sign-off Nov 2023 | 859 35th Av | addition of new bathroom @ (e) study/guestroom @ 3/fDetails
addition of new bathroom @ (e) study/guestroom @ 3/f | $25,000 |
| Dec 1, 2022 | Completed final sign-off Jul 2024 | 48 Retiro Wy | expand conditioned space to 1/f for common room and bath. renovate unit 48 and 50 with reconfigured kitchens, baths, and 2nd bath at each unit. remove walls b/t living and dining rooms at both units. replace (e) windows on front; in-kind, wood, true divided lite, match pattern.Details
expand conditioned space to 1/f for common room and bath. renovate unit 48 and 50 with reconfigured kitchens, baths, and 2nd bath at each unit. remove walls b/t living and dining rooms at both units. replace (e) windows on front; in-kind, wood, true divided lite, match pattern. | $225,000 |
| Sep 20, 2022 | Completed final sign-off Nov 2022 | 722 Balboa St | 1 (e) kitchen: replace ktichen counters & plumbing fixtures. 1 (e) bathroom: replce 1 vanity & toilet. refinish floors & paint interior. all work in kind. no structural.Details
1 (e) kitchen: replace ktichen counters & plumbing fixtures. 1 (e) bathroom: replce 1 vanity & toilet. refinish floors & paint interior. all work in kind. no structural. | $10,000 |
| Jul 20, 2022 | Completed final sign-off Aug 2023 | 3624 Webster St | g/f: expand (e) social hall at ground floor within (e) building footprint. convert non-conditioned space to conditined. add new full bathroom & new exterior doors to new patio.Details
g/f: expand (e) social hall at ground floor within (e) building footprint. convert non-conditioned space to conditined. add new full bathroom & new exterior doors to new patio. | $125,000 |
| Jul 20, 2022 | Completed final sign-off Apr 2025 | 160 Swiss Av | repair water damange drywall & tile in lower bathroom.Details
repair water damange drywall & tile in lower bathroom. | $5,000 |
| May 17, 2022 | Completed final sign-off Jun 2023 | 3442 19th St | unit #3442: remodel 2nd fl. kithcen, new appliances finishes & fixtures, add full bath at 1st fl. storage area adjacent to (e) bedroom, legalize 2nd fl. full bathroom which was remodeled w/out permit by previous ownerDetails
unit #3442: remodel 2nd fl. kithcen, new appliances finishes & fixtures, add full bath at 1st fl. storage area adjacent to (e) bedroom, legalize 2nd fl. full bathroom which was remodeled w/out permit by previous owner | $100,000 |
| Apr 5, 2022 | Completed final sign-off Mar 2023 | 3624 Webster St | remodel and partially reconfigure existing interior space at 1/f. add new half bath, replacing (e) f.a.u w/ heat pump hvac system for all conditioned spaces. no work to front facade - any work to front windows will be under seperate permit.Details
remodel and partially reconfigure existing interior space at 1/f. add new half bath, replacing (e) f.a.u w/ heat pump hvac system for all conditioned spaces. no work to front facade - any work to front windows will be under seperate permit. | $300,000 |
| May 25, 2021 | Completed final sign-off Nov 2021 | 651 Central Av | replace 1 bath in kind. replace 1 kitchen in kind. no alteration of wall, window or door.Details
replace 1 bath in kind. replace 1 kitchen in kind. no alteration of wall, window or door. | $40,000 |
| Dec 7, 2020 | Never finaled issued Dec 2020, no final | 1466 Jackson St | unit #1466 & 1468: remodel kitchen & bathroom in-kind.Details
unit #1466 & 1468: remodel kitchen & bathroom in-kind. | $1,000 |
| Dec 7, 2020 | Completed final sign-off Nov 2021 | 649 Central Av | unit 649 - renovation of kitchen and bathroom at second floor. upgrade existing foundation at 1st floor.Details
unit 649 - renovation of kitchen and bathroom at second floor. upgrade existing foundation at 1st floor. | $45,000 |
| Oct 14, 2020 | Completed final sign-off Sep 2023 | 109 Pierce St | expansion of conditional iv space to basement at 113 w/ (n) stair, bedrm, bath & fam rm. (n) roof deck at attic level w/ int stair@ 109.Details
expansion of conditional iv space to basement at 113 w/ (n) stair, bedrm, bath & fam rm. (n) roof deck at attic level w/ int stair@ 109. | $84,000 |
| Jun 30, 2020 | Completed final sign-off Jan 2024 | 1466 Jackson St | residential dwelling unit interior renovations into existing residential building. demo non structural interior partitions and interior renovation of e bedroom, e baths, and e kitchen at e 2nd and 3rd fl units. interior structural seismic upgrade for e 2nd and 3rd fl units. home office w break areaDetails
residential dwelling unit interior renovations into existing residential building. demo non structural interior partitions and interior renovation of e bedroom, e baths, and e kitchen at e 2nd and 3rd fl units. interior structural seismic upgrade for e 2nd and 3rd fl units. home office w break area | $100,000 |
| Nov 22, 2019 | Completed final sign-off Dec 2019 | 31 Fairmount St | 2nd floor bathroom remodel: replace floor tiles, wall tiles, vanity, shower and vanity fixturesDetails
2nd floor bathroom remodel: replace floor tiles, wall tiles, vanity, shower and vanity fixtures | $15,000 |
| Feb 22, 2019 | Expired or cancelled cancelled Jul 2019 | 109 Pierce St | expand conditioned living space at unit #109 to basement w.new interior stair, new bedroom, bath & family room; new private roof deck for unit 113 at attic level w/new interior stairs. new dormer. no work at middle unit.Details
expand conditioned living space at unit #109 to basement w.new interior stair, new bedroom, bath & family room; new private roof deck for unit 113 at attic level w/new interior stairs. new dormer. no work at middle unit. | $40,000 |
| Dec 10, 2018 | In progress issued Jan 2026 | 314 Park St | remodel to an existing two story single family residence. rear yard horizontal addition, 3rd story vertical addition,add bath,new front facade, excavation and full foundation replacement, interior remodel throughtout, legalization of an unathorized dwelling unitDetails
remodel to an existing two story single family residence. rear yard horizontal addition, 3rd story vertical addition,add bath,new front facade, excavation and full foundation replacement, interior remodel throughtout, legalization of an unathorized dwelling unit | $350,000 |
| Aug 3, 2017 | Completed final sign-off Feb 2018 | 3245 Steiner St | renovate kitchen, reconfigure existing bath, add a new master bath @ 3/f unit #3245Details
renovate kitchen, reconfigure existing bath, add a new master bath @ 3/f unit #3245 | $50,000 |
| Feb 28, 2017 | Completed final sign-off Feb 2018 | 3247 Steiner St | convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversionDetails
convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversion | $100,000 |