Block 6686, lot 041
31 Fairmount St
- City’s use
- Single Family Residential
- Built
- 2004
- Stories
- 3
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,359 sq ft
- Lot
- 1,340 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 15, 2023 | Completed final sign-off Nov 2023 | 31 Fairmount St | Metzler Brothers General Contractors Inc | replace street facing exterior door on top floor. new aluminum clad doorDetails
replace street facing exterior door on top floor. new aluminum clad door | $5,000 |
| Aug 13, 2021 | Completed final sign-off Aug 2021 | 31 Fairmount St | Pride Roofing | reroofing.Details
reroofing. | $5,000 |
| Apr 23, 2021 | Completed final sign-off Jun 2021 | 31 Fairmount St | Metzler Brothers General Contractors Inc | u factor for glzing shall not exceed 0.30 replace 1 ext in kind facing back at yard no visible frm street no rough opening changes. revision & permit 202103015551 eliminate entire no closet work just exterior door replacement.Details
u factor for glzing shall not exceed 0.30 replace 1 ext in kind facing back at yard no visible frm street no rough opening changes. revision & permit 202103015551 eliminate entire no closet work just exterior door replacement. | |
| Mar 1, 2021 | Completed final sign-off Jun 2021 | 31 Fairmount St | Metzler Brothers General Contractors Inc | remove non-bearing wall between 2 existing closets to make larger closet. replae 2 existing doors in kind; existng wall is 3' long in 3rd floor master suiteDetails
remove non-bearing wall between 2 existing closets to make larger closet. replae 2 existing doors in kind; existng wall is 3' long in 3rd floor master suite | $5,500 |
| Nov 22, 2019 | Completed final sign-off Dec 2019 | 31 Fairmount St | Prime Construction & Renovation Inc. | 2nd floor bathroom remodel: replace floor tiles, wall tiles, vanity, shower and vanity fixturesDetails
2nd floor bathroom remodel: replace floor tiles, wall tiles, vanity, shower and vanity fixtures | $15,000 |
| Oct 24, 2017 | Completed final sign-off Nov 2017 | 31 Fairmount St | K F L Construction Inc. | siding repair, not visible to street, back of the house.Details
siding repair, not visible to street, back of the house. | $6,000 |
| Sep 3, 2014 | Never finaled issued Sep 2014, no final | 31 Fairmount St | street space & sidewalk repairDetails
street space & sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.