Plant Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Nov 2004
- Last 24 months
- 0 permits filed
267 permits since 2000: 157 completed, 8 never finaled, 102 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
8 stairs permits: 4 completed, 4 expired or cancelled. Typically 15 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2002 | Expired or cancelled cancelled Aug 2010 | 1111 Ofarrell St | exterior stair for access to side yardDetails
exterior stair for access to side yard | $1,500 |
| Oct 29, 2002 | Expired or cancelled cancelled Jan 2005 | 1001 Franklin St | four hour fire wall and reconfigure pedestrian bridge, plaza exit stair,Details
four hour fire wall and reconfigure pedestrian bridge, plaza exit stair, | $301,000 |
| Oct 29, 2002 | Expired or cancelled cancelled Dec 2004 | 1001 Franklin St | exterior stair in open parking lot, also temporary stair during constDetails
exterior stair in open parking lot, also temporary stair during const | $11,000 |
| Feb 25, 2002 | Completed final sign-off Apr 2002 | 1 Lombard St | remove interior open communicating stair between floors, installed by prev tenant, and close flr opeDetails
remove interior open communicating stair between floors, installed by prev tenant, and close flr ope | $12,500 |
| Jun 22, 2001 | Expired or cancelled expired Dec 2001 | 180 Geary St | demo minor stair work 1st level in fill stair opening 1st levelDetails
demo minor stair work 1st level in fill stair opening 1st level | $25,000 |
| Mar 23, 2001 | Completed final sign-off May 2001 | 555 Clay St | stairs from 2nd floor to roof for maintenance & attend equipment only, there's no roof deck at 555 cDetails
stairs from 2nd floor to roof for maintenance & attend equipment only, there's no roof deck at 555 c | |
| Feb 26, 2001 | Completed final sign-off Apr 2001 | 555 Clay St | permit revision to 200010052460 stairs and handrailDetails
permit revision to 200010052460 stairs and handrail | $15,000 |
| Oct 17, 2000 | Completed final sign-off Jan 2002 | 1 Market St | construct stair & walkway to exist adjacent rooftop, deck alter exist guardrail& new guardrail......Details
construct stair & walkway to exist adjacent rooftop, deck alter exist guardrail& new guardrail...... | $80,000 |