Back to kitchen remodel contractors
Pio Mcgarr Inc
- Based in
- Mill Valley
- On San Francisco permits
- Aug 2004 to Aug 2026
- Last 24 months
- 9 permits filed
86 permits since 2000: 59 completed, 13 in progress, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 11 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 417 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2022 | Completed final sign-off Dec 2023 | 333 West Portal Av | unit a: remodel of (e) kitchen and bathrm and addition of new bathrm on level 2.Details
unit a: remodel of (e) kitchen and bathrm and addition of new bathrm on level 2. | $110,000 |
| Mar 7, 2022 | Completed final sign-off Jun 2023 | 883 Treat Av | 2nd fl: remodel (e) kitchen and (e) bathroom. add skylights. infill lightwells. new powder room. window replacement. no work visible from street.Details
2nd fl: remodel (e) kitchen and (e) bathroom. add skylights. infill lightwells. new powder room. window replacement. no work visible from street. | $73,867 |
| Jun 13, 2017 | Completed final sign-off Jul 2018 | 102 Pierce St | remodel unit 102: remodel kitchen, add sink at toilet room, enlarge opening in wall between sitchen & dining roomDetails
remodel unit 102: remodel kitchen, add sink at toilet room, enlarge opening in wall between sitchen & dining room | $24,300 |
| Apr 7, 2017 | Completed final sign-off Aug 2017 | 1134 Noe St | remodel kitchen, new cabients, power, counters. remodel bath - shower, new tile, toilet, sink. bolt exisitng foundationwith 7/8 all tgread & epoxy every 32"m add sine a30 clips at post in basement. repair some dryrot.Details
remodel kitchen, new cabients, power, counters. remodel bath - shower, new tile, toilet, sink. bolt exisitng foundationwith 7/8 all tgread & epoxy every 32"m add sine a30 clips at post in basement. repair some dryrot. | $32,000 |
| Jan 28, 2016 | Completed final sign-off Sep 2017 | 24 Hartford St | revision to 2015-0918-7463 add 2 windows & relocate wet bar @ 1st floor. replace exterior sliding door with window & relocate kitchen and dining room at 2nd floor. add 3 skylights. revise structural details for entry stairsDetails
revision to 2015-0918-7463 add 2 windows & relocate wet bar @ 1st floor. replace exterior sliding door with window & relocate kitchen and dining room at 2nd floor. add 3 skylights. revise structural details for entry stairs | $3,600 |
| Nov 19, 2015 | Completed final sign-off Nov 2019 | 1421 Diamond St | h & v addition, add 3rd fl, 885 sq ft. include 3 bedrms, 2 bqaths, closets & a deck over 2nd fl, extend bedrm 3 ft at rear & remodel kitchen & bath,. ground fl addition at rear varies from 6-8 ft. ground fl improvements incl bedrm & bathrm remodel, new family rm, laundry rm & closets,Details
h & v addition, add 3rd fl, 885 sq ft. include 3 bedrms, 2 bqaths, closets & a deck over 2nd fl, extend bedrm 3 ft at rear & remodel kitchen & bath,. ground fl addition at rear varies from 6-8 ft. ground fl improvements incl bedrm & bathrm remodel, new family rm, laundry rm & closets, | $275,000 |
| Oct 8, 2015 | Completed final sign-off Sep 2017 | 24 Hartford St | revision to pa 2015-0918-7463, infill area 2nd fl @ rear yard. remodel area behind garate to include 1 bedroom, 1.5 baths, family room, laundry. reconfigure 2nd fl to include living, dining, kitchen, half bath. recon- figure 3rd fl to include 2 bedrooms, 2 bath, roof deck, add 3 dormersDetails
revision to pa 2015-0918-7463, infill area 2nd fl @ rear yard. remodel area behind garate to include 1 bedroom, 1.5 baths, family room, laundry. reconfigure 2nd fl to include living, dining, kitchen, half bath. recon- figure 3rd fl to include 2 bedrooms, 2 bath, roof deck, add 3 dormers | $290,000 |
| Mar 6, 2014 | Completed final sign-off Jul 2015 | 2563 Diamond St | 1st floor: convert storage area to media room,bedroom, bath, family room, laundry closet. 2nd floor:remodel kitchen and bath.Details
1st floor: convert storage area to media room,bedroom, bath, family room, laundry closet. 2nd floor:remodel kitchen and bath. | $155,000 |
| Jan 31, 2013 | Never finaled issued Feb 2013, no final | 2422 Mission St | unit #7:remodel extg bathroom and kitchen in unit #7. high efficacy lighting.Details
unit #7:remodel extg bathroom and kitchen in unit #7. high efficacy lighting. | $15,000 |
| Apr 4, 2012 | Completed final sign-off May 2013 | 3200 24th St | remodel extg restaurant and bar. upgrade toilets to h.c. relocate walls at kitchen & toilet areas. comply w/nov#200011364.Details
remodel extg restaurant and bar. upgrade toilets to h.c. relocate walls at kitchen & toilet areas. comply w/nov#200011364. | $30,000 |
| Dec 14, 2011 | Completed final sign-off Mar 2012 | 2426 Mission St | demo (e) bathroom & kitchen @ unit#1 & 4. (n) lighting, plumbing. all (n) kitchen cabinets & countertops. tile at all floors. (non-structural).lighting to comply with cec 150(k); exhaust through lightwellDetails
demo (e) bathroom & kitchen @ unit#1 & 4. (n) lighting, plumbing. all (n) kitchen cabinets & countertops. tile at all floors. (non-structural).lighting to comply with cec 150(k); exhaust through lightwell | $50,000 |
| May 4, 2011 | Completed final sign-off Jan 2012 | 60 Chaves Av | ground floor development:new bathroom, bedroom, family room, office laundry room. new bay window at 1st floor alining with extg 2nd floor baywindow. reconfigure interior stair , at 2nd floor:remodel kitchen, bathroom new wood deck at or less than 30" above grade.Details
ground floor development:new bathroom, bedroom, family room, office laundry room. new bay window at 1st floor alining with extg 2nd floor baywindow. reconfigure interior stair , at 2nd floor:remodel kitchen, bathroom new wood deck at or less than 30" above grade. | $140,000 |
| Apr 26, 2007 | Expired or cancelled expired Jul 2010 | 1213 Sanchez St | kitchen and bathroom remodel in both units. new cabnts and fixtures in bathroom. repair dryrot in kind in bathroom and kchn appox 30ft x 25ft for 2 levels. drawing may required per inspection discriptionDetails
kitchen and bathroom remodel in both units. new cabnts and fixtures in bathroom. repair dryrot in kind in bathroom and kchn appox 30ft x 25ft for 2 levels. drawing may required per inspection discription | $40,000 |