Back to bathroom remodel contractors
Pio Mcgarr Inc
- Based in
- Mill Valley
- On San Francisco permits
- Aug 2004 to Aug 2026
- Last 24 months
- 9 permits filed
86 permits since 2000: 59 completed, 13 in progress, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 16 completed, 3 never finaled, 2 expired or cancelled. Typically 5 days from filing to permit and 467 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2024 | Completed final sign-off Nov 2025 | 59 Justin Dr | convert 617 sf of unconditioned space in conditioned included 1 bedroom, 1 bath, 1 laundry, 1 study/playroom. relocate/new plumbing fixture, repartition interior, new finishes & fixtures. replace windows w/ wood insert windows. no change to use, occupancy,egress or sfDetails
convert 617 sf of unconditioned space in conditioned included 1 bedroom, 1 bath, 1 laundry, 1 study/playroom. relocate/new plumbing fixture, repartition interior, new finishes & fixtures. replace windows w/ wood insert windows. no change to use, occupancy,egress or sf | $350,000 |
| Jun 21, 2023 | Never finaled issued Jun 2023, no final | 4310 California St | residential: demo bathroom flr and wall around shower/tub. inspect for dry rot. replace tub and shower fixtures. reinstall dry wall, retile shower tub, and floor. patch and repair lightwell. at second floor.Details
residential: demo bathroom flr and wall around shower/tub. inspect for dry rot. replace tub and shower fixtures. reinstall dry wall, retile shower tub, and floor. patch and repair lightwell. at second floor. | $15,000 |
| Mar 11, 2022 | Completed final sign-off Jan 2024 | 51 Justin Dr | interior reno of sfh, new legal stair, new 1.5 bath new 749 sq ft of conditioned space in (e) envelope remodel ktichen. 6 new window pentrations.replace 5 front bay in kind with wood framed windows.Details
interior reno of sfh, new legal stair, new 1.5 bath new 749 sq ft of conditioned space in (e) envelope remodel ktichen. 6 new window pentrations.replace 5 front bay in kind with wood framed windows. | $300,000 |
| Mar 7, 2022 | Completed final sign-off Jun 2023 | 883 Treat Av | 2nd fl: remodel (e) kitchen and (e) bathroom. add skylights. infill lightwells. new powder room. window replacement. no work visible from street.Details
2nd fl: remodel (e) kitchen and (e) bathroom. add skylights. infill lightwells. new powder room. window replacement. no work visible from street. | $73,867 |
| Jun 22, 2021 | Completed final sign-off Mar 2022 | 147 06th Av | remodel 3 bathrooms, shower/tubs.remove drywall, change plumbing fixturs, electrical uapgrades. new tilie, heated floors, new drywall & paint. repair any dry rot, repair in-kind.Details
remodel 3 bathrooms, shower/tubs.remove drywall, change plumbing fixturs, electrical uapgrades. new tilie, heated floors, new drywall & paint. repair any dry rot, repair in-kind. | $48,000 |
| Jun 11, 2021 | Completed final sign-off Jun 2023 | 883 Treat Av | interior remodel of garage: add a bathroom. replace furnace 7 water heater & convert a portion of the garage to habitable space - 1 bathroom, laundry.Details
interior remodel of garage: add a bathroom. replace furnace 7 water heater & convert a portion of the garage to habitable space - 1 bathroom, laundry. | $100,000 |
| Sep 5, 2020 | Never finaled issued Jan 2021, no final | 241 Benton Av | garage conversion to 3 bedrooms, 1 1/2 baths, new foundation, lowered slab to increase finished ceilig height to 8'Details
garage conversion to 3 bedrooms, 1 1/2 baths, new foundation, lowered slab to increase finished ceilig height to 8' | $224,882 |
| May 23, 2019 | Completed final sign-off Oct 2020 | 167 Judson Av | interior remodel at 1st floor to include new bedroom, family room, bath, laundry, & int. stairs to 2nd floor.Details
interior remodel at 1st floor to include new bedroom, family room, bath, laundry, & int. stairs to 2nd floor. | $62,000 |
| Dec 11, 2018 | Completed final sign-off Oct 2019 | 2667 21st Av | lightwell infill for new interior stairs, garage conversion to family room, bedroom, bathroomDetails
lightwell infill for new interior stairs, garage conversion to family room, bedroom, bathroom | $83,275 |
| Jun 16, 2017 | Completed final sign-off Jun 2021 | 579 Clipper St | remodel 2 story sfr to 3rd story sfr. with 3 rd floor addition to include 3 bedrms, 2 baths.Details
remodel 2 story sfr to 3rd story sfr. with 3 rd floor addition to include 3 bedrms, 2 baths. | $550,000 |
| Apr 7, 2017 | Completed final sign-off Aug 2017 | 1134 Noe St | remodel kitchen, new cabients, power, counters. remodel bath - shower, new tile, toilet, sink. bolt exisitng foundationwith 7/8 all tgread & epoxy every 32"m add sine a30 clips at post in basement. repair some dryrot.Details
remodel kitchen, new cabients, power, counters. remodel bath - shower, new tile, toilet, sink. bolt exisitng foundationwith 7/8 all tgread & epoxy every 32"m add sine a30 clips at post in basement. repair some dryrot. | $32,000 |
| Nov 19, 2015 | Completed final sign-off Nov 2019 | 1421 Diamond St | h & v addition, add 3rd fl, 885 sq ft. include 3 bedrms, 2 bqaths, closets & a deck over 2nd fl, extend bedrm 3 ft at rear & remodel kitchen & bath,. ground fl addition at rear varies from 6-8 ft. ground fl improvements incl bedrm & bathrm remodel, new family rm, laundry rm & closets,Details
h & v addition, add 3rd fl, 885 sq ft. include 3 bedrms, 2 bqaths, closets & a deck over 2nd fl, extend bedrm 3 ft at rear & remodel kitchen & bath,. ground fl addition at rear varies from 6-8 ft. ground fl improvements incl bedrm & bathrm remodel, new family rm, laundry rm & closets, | $275,000 |
| Oct 8, 2015 | Completed final sign-off Sep 2017 | 24 Hartford St | revision to pa 2015-0918-7463, infill area 2nd fl @ rear yard. remodel area behind garate to include 1 bedroom, 1.5 baths, family room, laundry. reconfigure 2nd fl to include living, dining, kitchen, half bath. recon- figure 3rd fl to include 2 bedrooms, 2 bath, roof deck, add 3 dormersDetails
revision to pa 2015-0918-7463, infill area 2nd fl @ rear yard. remodel area behind garate to include 1 bedroom, 1.5 baths, family room, laundry. reconfigure 2nd fl to include living, dining, kitchen, half bath. recon- figure 3rd fl to include 2 bedrooms, 2 bath, roof deck, add 3 dormers | $290,000 |
| Mar 6, 2014 | Completed final sign-off Jul 2015 | 2563 Diamond St | 1st floor: convert storage area to media room,bedroom, bath, family room, laundry closet. 2nd floor:remodel kitchen and bath.Details
1st floor: convert storage area to media room,bedroom, bath, family room, laundry closet. 2nd floor:remodel kitchen and bath. | $155,000 |
| Jan 31, 2013 | Never finaled issued Feb 2013, no final | 2422 Mission St | unit #7:remodel extg bathroom and kitchen in unit #7. high efficacy lighting.Details
unit #7:remodel extg bathroom and kitchen in unit #7. high efficacy lighting. | $15,000 |
| Oct 5, 2012 | Completed final sign-off Dec 2012 | 12 Marne Av | remodel (e) bathroom remove (e) tile, repair dry-rot change shower valve. bring electrical up to code. re-install tile, change window, paint bathroom.Details
remodel (e) bathroom remove (e) tile, repair dry-rot change shower valve. bring electrical up to code. re-install tile, change window, paint bathroom. | $10,000 |
| Dec 14, 2011 | Completed final sign-off Mar 2012 | 2426 Mission St | demo (e) bathroom & kitchen @ unit#1 & 4. (n) lighting, plumbing. all (n) kitchen cabinets & countertops. tile at all floors. (non-structural).lighting to comply with cec 150(k); exhaust through lightwellDetails
demo (e) bathroom & kitchen @ unit#1 & 4. (n) lighting, plumbing. all (n) kitchen cabinets & countertops. tile at all floors. (non-structural).lighting to comply with cec 150(k); exhaust through lightwell | $50,000 |
| May 4, 2011 | Completed final sign-off Jan 2012 | 60 Chaves Av | ground floor development:new bathroom, bedroom, family room, office laundry room. new bay window at 1st floor alining with extg 2nd floor baywindow. reconfigure interior stair , at 2nd floor:remodel kitchen, bathroom new wood deck at or less than 30" above grade.Details
ground floor development:new bathroom, bedroom, family room, office laundry room. new bay window at 1st floor alining with extg 2nd floor baywindow. reconfigure interior stair , at 2nd floor:remodel kitchen, bathroom new wood deck at or less than 30" above grade. | $140,000 |
| Feb 15, 2011 | Expired or cancelled expired Oct 2013 | 301 Bryant St | unit 704. change out tile floor @ bathroom & replace vanity, no other work.Details
unit 704. change out tile floor @ bathroom & replace vanity, no other work. | $7,000 |
| Mar 5, 2010 | Completed final sign-off Sep 2010 | 763 Kansas St | grd flr remodeling-install new frames for exterior/interior walls, new lights, plumbing for new toilet, sink & shower. move laundry area. bathroom will require tile work, sink, shower stall installation. install new water heater/new furnace (requires duct work), finished room to be used as home offDetails
grd flr remodeling-install new frames for exterior/interior walls, new lights, plumbing for new toilet, sink & shower. move laundry area. bathroom will require tile work, sink, shower stall installation. install new water heater/new furnace (requires duct work), finished room to be used as home off | $41,150 |
| Apr 26, 2007 | Expired or cancelled expired Jul 2010 | 1213 Sanchez St | kitchen and bathroom remodel in both units. new cabnts and fixtures in bathroom. repair dryrot in kind in bathroom and kchn appox 30ft x 25ft for 2 levels. drawing may required per inspection discriptionDetails
kitchen and bathroom remodel in both units. new cabnts and fixtures in bathroom. repair dryrot in kind in bathroom and kchn appox 30ft x 25ft for 2 levels. drawing may required per inspection discription | $40,000 |