Block 6507, lot 003A
1132 Noe St
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 3
- Units
- 2
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,350 sq ft
- Lot
- 1,955 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2025 | Completed final sign-off Dec 2025 | 1132 Noe St | to obtain final inspection for work apporved under pa# 8913443. all work is complete.Details
to obtain final inspection for work apporved under pa# 8913443. all work is complete. | ||
| Aug 28, 2025 | Completed final sign-off Dec 2025 | 1132 Noe St | to comply with physical inspection report# cc-8685Details
to comply with physical inspection report# cc-8685 | $80,000 | |
| Jun 16, 2025 | Completed final sign-off Jun 2025 | 1132 Noe St | Altai Mechanical Llc Dba Cal State Hvac | replace flex duct inside garage w/ rigid ducting. duct work only, no wall penetration. less than 25' ducting alteration.Details
replace flex duct inside garage w/ rigid ducting. duct work only, no wall penetration. less than 25' ducting alteration. | $2,400 |
| May 7, 2025 | Completed final sign-off Aug 2025 | 1132 Noe St | T Prior Building Co | install 5/8" sheetrock in garage/basement area to all walls and ceilings. install r19 insulation in ceiling.Details
install 5/8" sheetrock in garage/basement area to all walls and ceilings. install r19 insulation in ceiling. | $4,500 |
| Oct 1, 2024 | Completed final sign-off Oct 2024 | 1132 Noe St | administratiive permit to document the legal use and occupancy of wtructure as a three story 2-unit building. this determination is based off a review of records including sanborn map, assesor's site visit no work under this permitDetails
administratiive permit to document the legal use and occupancy of wtructure as a three story 2-unit building. this determination is based off a review of records including sanborn map, assesor's site visit no work under this permit | ||
| Jul 25, 2024 | Completed final sign-off Nov 2024 | 1132 Noe St | Alioto Custom Building & Remodeling | replace 3 windows at the back of house in laundry room in kindDetails
replace 3 windows at the back of house in laundry room in kind | $9,592 |
| Jun 11, 2024 | Completed final sign-off Nov 2024 | 1134 Noe St | Alioto Custom Building & Remodeling | enlarge (2) existing window openings on the back of the house and install (2) new windows - all wood historical. close off (1) small window next to backyard door.Details
enlarge (2) existing window openings on the back of the house and install (2) new windows - all wood historical. close off (1) small window next to backyard door. | $13,796 |
| Jan 3, 2024 | Completed final sign-off Sep 2024 | 1132 Noe St | Prior Construction, De Barra Builders | replace partial foundation(brick to reinf. concrete) upgrade wood girder to steel girder at garage. reduce quantty of posts. partial slab replacement.Details
replace partial foundation(brick to reinf. concrete) upgrade wood girder to steel girder at garage. reduce quantty of posts. partial slab replacement. | $55,000 |
| Apr 7, 2017 | Completed final sign-off Aug 2017 | 1134 Noe St | Pio Mcgarr Inc | remodel kitchen, new cabients, power, counters. remodel bath - shower, new tile, toilet, sink. bolt exisitng foundationwith 7/8 all tgread & epoxy every 32"m add sine a30 clips at post in basement. repair some dryrot.Details
remodel kitchen, new cabients, power, counters. remodel bath - shower, new tile, toilet, sink. bolt exisitng foundationwith 7/8 all tgread & epoxy every 32"m add sine a30 clips at post in basement. repair some dryrot. | $32,000 |
| Jun 10, 2011 | Never finaled issued Jun 2011, no final | 1132 Noe St | street space permitDetails
street space permit | ||
| Sep 1, 2004 | Completed final sign-off Oct 2004 | 1132 Noe St | replacement of (e) in kind construction: new front entry stair & gate, new guardrail & floor finishDetails
replacement of (e) in kind construction: new front entry stair & gate, new guardrail & floor finish | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Alioto Custom Building & Remodeling (2), Altai Mechanical Llc Dba Cal State Hvac, De Barra Builders, Pio Mcgarr Inc, Prior Construction, T Prior Building Co
- Engineers
- Peter Chuck, Tim O'sullivan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.