Back to kitchen remodel contractors
Phase 2 Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Jul 2026
- Last 24 months
- 6 permits filed
190 permits since 2000: 165 completed, 3 in progress, 8 never finaled, 14 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
115 kitchen remodel permits: 101 completed, 2 in progress, 5 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 150 days from permit to final inspection.
Showing the 100 most recent of 115.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2026 | In progress issued Aug 2026 | 33 Robinhood Dr | full interior home renovation & addition of primary bedroom & ensuite bathroom include general interior finished, new flooring & wall coverings, kitchen remodel. new cabinets, countertops & appliances. remodel all bathrooms, new doors & windows, updated electrical & lighting systems,Details
full interior home renovation & addition of primary bedroom & ensuite bathroom include general interior finished, new flooring & wall coverings, kitchen remodel. new cabinets, countertops & appliances. remodel all bathrooms, new doors & windows, updated electrical & lighting systems, | $2,000,000 |
| Jan 8, 2025 | In progress issued Jan 2025 | 33 Robinhood Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $30,000 |
| Oct 31, 2024 | Expired or cancelled expired Dec 2025 | 1080 Chestnut St | unit 13b: apartment renovation- new kitchen and bathrooms.Details
unit 13b: apartment renovation- new kitchen and bathrooms. | $45,000 |
| Jun 3, 2024 | Completed final sign-off Nov 2024 | 255 Berry St | kitchen remodel in kindDetails
kitchen remodel in kind | $25,000 |
| Jan 10, 2024 | Completed final sign-off Feb 2025 | 2253 15th St | interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor.Details
interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor. | $50,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2024 | 993 Tennessee St | unit #6: remodel kitchen (fourth floor) in kind. primary bathroom (3rd floor) in kind. replace fixtures only (4th floor) bathroom in kind. no structural work.Details
unit #6: remodel kitchen (fourth floor) in kind. primary bathroom (3rd floor) in kind. replace fixtures only (4th floor) bathroom in kind. no structural work. | $150,000 |
| Jul 13, 2023 | Completed final sign-off Mar 2024 | 2 Mint Pz | unit# 301: replace kitchen in kind with new countertops and appliances.Details
unit# 301: replace kitchen in kind with new countertops and appliances. | $35,000 |
| May 18, 2023 | Completed final sign-off Aug 2024 | 228 Liberty St | kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade.Details
kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade. | $77,859 |
| May 27, 2022 | Completed final sign-off Mar 2023 | 357 Princeton St | remodel (e) kitchen. remodel (e) primary bathroom, add 2 new skylightsDetails
remodel (e) kitchen. remodel (e) primary bathroom, add 2 new skylights | $50,000 |
| May 25, 2022 | Completed final sign-off Aug 2023 | 1129 Tennessee St | covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work.Details
covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work. | $30,000 |
| Mar 11, 2022 | Completed final sign-off May 2023 | 217 Cumberland St | remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations.Details
remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations. | $120,000 |
| Aug 23, 2021 | Completed final sign-off Aug 2022 | 97 Hill St | remodel kitchen (10'x12')and master bathroom (8'x5'), in kind repair back stair case in kind, less than 50%. no change in unit #2-location or design. h.e. lighting and controlled per cec 150.0(k)Details
remodel kitchen (10'x12')and master bathroom (8'x5'), in kind repair back stair case in kind, less than 50%. no change in unit #2-location or design. h.e. lighting and controlled per cec 150.0(k) | $20,000 |
| Aug 23, 2021 | Completed final sign-off Aug 2022 | 99 Hill St | remodel kitchen (10'x12') and master bathroom (8'x5')in kind. remodel powder room (5'x5')in kind. h.e. lighting and controlled per cec 150.0(k)Details
remodel kitchen (10'x12') and master bathroom (8'x5')in kind. remodel powder room (5'x5')in kind. h.e. lighting and controlled per cec 150.0(k) | $20,000 |
| May 5, 2021 | Completed final sign-off Sep 2022 | 377 Capp St | remodel kitchen (1), master bath (1), 1/2 bath (1) & laundry (1) to include new plumbing and electrical fixtures. redo flooring in both units. upgrade hvac & new furnace.Details
remodel kitchen (1), master bath (1), 1/2 bath (1) & laundry (1) to include new plumbing and electrical fixtures. redo flooring in both units. upgrade hvac & new furnace. | $25,000 |
| May 5, 2021 | Never finaled issued May 2021, no final | 379 Capp St | remodel kitchen to include new plumbing and electrical fixtures, new appliances (kitchen) , upgrade and redo new furnace existing floors.Details
remodel kitchen to include new plumbing and electrical fixtures, new appliances (kitchen) , upgrade and redo new furnace existing floors. | $25,000 |
| Mar 22, 2021 | Completed final sign-off Feb 2022 | 1945 Washington St | unit 202 - repair & replace in-kind - flooring, drywall, lighting fixtures, plumbing fixtures cabinets & appliances in unit damaged by fire sprinklers. no structural work - 2 baths, 1 kitchen, 1 laundry. to comply w/ nov 202045331Details
unit 202 - repair & replace in-kind - flooring, drywall, lighting fixtures, plumbing fixtures cabinets & appliances in unit damaged by fire sprinklers. no structural work - 2 baths, 1 kitchen, 1 laundry. to comply w/ nov 202045331 | $80,000 |
| Mar 2, 2021 | Completed final sign-off Jul 2021 | 67 Rudden Av | kitchen remodel, new electrical, plumbing and appliances in same location. new flooring, cabinets, appliances, countertopDetails
kitchen remodel, new electrical, plumbing and appliances in same location. new flooring, cabinets, appliances, countertop | $20,000 |
| Feb 11, 2021 | Completed final sign-off Dec 2021 | 1945 Washington St | apt 502: repair & replace in kind. flooring, drywall, lighting fixtures, electrical, plumbing fixtures, cabinets, appliances in unit damaged by smoke, water. no structural changes - 2 bath, 1 kitchen, 1 laundry, living/dining, 2 bedroom.Details
apt 502: repair & replace in kind. flooring, drywall, lighting fixtures, electrical, plumbing fixtures, cabinets, appliances in unit damaged by smoke, water. no structural changes - 2 bath, 1 kitchen, 1 laundry, living/dining, 2 bedroom. | $60,000 |
| Jan 6, 2021 | Completed final sign-off Jul 2021 | 1945 Washington St | #301: repair & replace in kind drywall & flooring caused by water/fire damage. new paint, floors, trim, (e) kitchen cabinets, appliances, plumbing fixtures. no structural changes. re-install electrical fixtures.Details
#301: repair & replace in kind drywall & flooring caused by water/fire damage. new paint, floors, trim, (e) kitchen cabinets, appliances, plumbing fixtures. no structural changes. re-install electrical fixtures. | $50,000 |
| Dec 3, 2020 | Completed final sign-off Aug 2023 | 90 Saturn St | remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space.Details
remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space. | $125,000 |
| Oct 20, 2020 | Completed final sign-off Jun 2021 | 1945 Washington St | repair and replace in kind drywall, flooring caused by water damage work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall electrical fixures.Details
repair and replace in kind drywall, flooring caused by water damage work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall electrical fixures. | $50,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2021 | 1945 Washington St | repair and replace in-kind drywall, flooring caused by water damage. work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall (e) electrical fixtures.Details
repair and replace in-kind drywall, flooring caused by water damage. work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall (e) electrical fixtures. | $50,000 |
| Sep 18, 2020 | Completed final sign-off Jun 2021 | 1744 Sanchez St | revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layoutDetails
revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layout | |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 3958 18th St | interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior workDetails
interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior work | $75,000 |
| Aug 14, 2019 | Completed final sign-off Jun 2021 | 1744 Sanchez St | extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work.Details
extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work. | $225,000 |
| Apr 18, 2019 | Completed final sign-off Jun 2025 | 1 Daniel Burnham Ct | on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maherDetails
on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maher | $35,000 |
| Apr 11, 2019 | Completed final sign-off Nov 2019 | 562 Sanchez St | (1) full kitchen remodel including floors on the main levelDetails
(1) full kitchen remodel including floors on the main level | $35,000 |
| Mar 26, 2019 | Expired or cancelled expired Jan 2023 | 1032 Broadway | interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maherDetails
interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maher | $100,000 |
| Dec 4, 2018 | Completed final sign-off Jun 2019 | 585 Rockdale Dr | interior remodel of (e) kitchen and bathroom at 2nd flr incl new fixtures and lighting, kitchen cabinetry, applinaces, flooring. no structural changes proposedDetails
interior remodel of (e) kitchen and bathroom at 2nd flr incl new fixtures and lighting, kitchen cabinetry, applinaces, flooring. no structural changes proposed | $36,000 |
| Oct 25, 2018 | Completed final sign-off Feb 2019 | 4179 20th St | 1/f: remodel kitchen including new cabinets, appliances,tile and countertops. no structural work, replace in-kind only.Details
1/f: remodel kitchen including new cabinets, appliances,tile and countertops. no structural work, replace in-kind only. | $36,000 |
| Sep 19, 2018 | Expired or cancelled cancelled Jan 2026 | 61 Hartford St | remodel ground flr - living area including kitchen and bathroom, new exterior door and remodel exterior deckDetails
remodel ground flr - living area including kitchen and bathroom, new exterior door and remodel exterior deck | $20,000 |
| Aug 13, 2018 | Completed final sign-off Apr 2019 | 1080 Chestnut St | apt 1g: kitchen remodel to include new cabinets, tile and appliances only. bathroomremodel: new tile and fixtures. no change to electrical or walls. maher n/a.Details
apt 1g: kitchen remodel to include new cabinets, tile and appliances only. bathroomremodel: new tile and fixtures. no change to electrical or walls. maher n/a. | $20,000 |
| Jun 6, 2018 | Completed final sign-off Mar 2019 | 61 Hartford St | full master bathroom and kitchen renovation to include new cabinetry, appliances, flooring and tile. no structural work proposed. replace in-kind only at basement level/lower unitDetails
full master bathroom and kitchen renovation to include new cabinetry, appliances, flooring and tile. no structural work proposed. replace in-kind only at basement level/lower unit | $20,000 |
| Apr 16, 2018 | Completed final sign-off Dec 2018 | 175 Haight St | interior remodel of existing kitchen & bathroom, proposes additon of (1) full bathroom, all new appliances in kitchen, proposes upgrading lighting & receptacles in area of work, no structural changesDetails
interior remodel of existing kitchen & bathroom, proposes additon of (1) full bathroom, all new appliances in kitchen, proposes upgrading lighting & receptacles in area of work, no structural changes | $82,000 |
| Feb 23, 2018 | Completed final sign-off Jun 2018 | 209 Montcalm St | remove existing wall between kitchen and dining room, add new post beams and shear wallDetails
remove existing wall between kitchen and dining room, add new post beams and shear wall | $10,000 |
| Aug 15, 2017 | Completed final sign-off Jun 2018 | 209 Montcalm St | kitchen remodelto include cabinets and flooring. remodel master bath, guest bath, and powder room. no change in structural or floor plan. no wall modification. no structural work.Details
kitchen remodelto include cabinets and flooring. remodel master bath, guest bath, and powder room. no change in structural or floor plan. no wall modification. no structural work. | $60,000 |
| May 4, 2017 | Completed final sign-off Apr 2018 | 1080 Chestnut St | unit 4b: full remodel of master bathroom, powder room and kitchen , includes new floor throughout,. update plumbing and electrical. no structural work. same layout.Details
unit 4b: full remodel of master bathroom, powder room and kitchen , includes new floor throughout,. update plumbing and electrical. no structural work. same layout. | $20,000 |
| May 1, 2017 | Completed final sign-off Oct 2017 | 39 Brewster St | kitchen & bathroom remodel; repair (e) interior stair case less than 50% in-kind; no structural alterations.Details
kitchen & bathroom remodel; repair (e) interior stair case less than 50% in-kind; no structural alterations. | $20,000 |
| Mar 10, 2017 | Completed final sign-off Oct 2017 | 1747 43rd Av | kitchen remodel including addition of a door leading from kitchen to a new deck less than 30" high in rear yard. addition of a bathroom with in the extg laundry room area. install hydronic radiant floor heating.Details
kitchen remodel including addition of a door leading from kitchen to a new deck less than 30" high in rear yard. addition of a bathroom with in the extg laundry room area. install hydronic radiant floor heating. | $18,000 |
| Feb 24, 2017 | Completed final sign-off Oct 2017 | 4110 20th St | demo & replace kitchen counters, cabinets & fixtures. new 1/2 bath on 1st flr. new finished floorDetails
demo & replace kitchen counters, cabinets & fixtures. new 1/2 bath on 1st flr. new finished floor | $20,000 |
| Nov 7, 2016 | Completed final sign-off Mar 2017 | 3042 Jackson St | unit 4: remodel kitchen - includes: cabinetry - counter tops & appliances, no change in structural, lighting or floors.Details
unit 4: remodel kitchen - includes: cabinetry - counter tops & appliances, no change in structural, lighting or floors. | $20,000 |
| Oct 27, 2016 | Completed final sign-off Feb 2017 | 2049 Oak St | #1 - remodel one bathroom to include new tile, shower vanity & toilet; add pocket door; add new lighting kitchen, living room & hall. add new counter & back splash in kitchen.Details
#1 - remodel one bathroom to include new tile, shower vanity & toilet; add pocket door; add new lighting kitchen, living room & hall. add new counter & back splash in kitchen. | $20,000 |
| Aug 16, 2016 | Completed final sign-off Feb 2018 | 4639 18th St | interior remodel of 2/f- new opening at center wall kitchen. new closets and relocate laundry.Details
interior remodel of 2/f- new opening at center wall kitchen. new closets and relocate laundry. | $50,000 |
| Jun 27, 2016 | Completed final sign-off Feb 2018 | 4639 18th St | kitchen and powder room remodel. replace existing patio doors, replace (e) powder room window in lightwell(westside). replace bedroom window in lightwell (westside). replace (e) kitchen window.Details
kitchen and powder room remodel. replace existing patio doors, replace (e) powder room window in lightwell(westside). replace bedroom window in lightwell (westside). replace (e) kitchen window. | $20,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 2169 Folsom St | 3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher naDetails
3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na | $400,000 |
| May 10, 2016 | Completed final sign-off Aug 2016 | 130 Landers St | unit h: kitchen demo and remodel including new cabinets, drywall repairs, and new appliances. plumbing and electrical update.Details
unit h: kitchen demo and remodel including new cabinets, drywall repairs, and new appliances. plumbing and electrical update. | $20,000 |
| Mar 30, 2016 | Completed final sign-off Dec 2016 | 300 Berry St | #558 - reface kitchen cabinets, replace railing along stairs with glass railing, add vanity to downstairs bathroom, full renovation of master bathroom on 2nd floor to include new tile, fixtures & shower. n/a maher ordinanceDetails
#558 - reface kitchen cabinets, replace railing along stairs with glass railing, add vanity to downstairs bathroom, full renovation of master bathroom on 2nd floor to include new tile, fixtures & shower. n/a maher ordinance | $50,000 |
| Mar 15, 2016 | Completed final sign-off Jun 2016 | 2041 Hayes St | #3 - kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update.Details
#3 - kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update. | $25,000 |
| Mar 15, 2016 | Completed final sign-off Jun 2016 | 1587 34th Av | kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update.Details
kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update. | $25,000 |
| Feb 29, 2016 | Completed final sign-off Aug 2016 | 1755 Filbert St | unit #20, 2nd floor: - kitchen & bathroom remodel including new cabinets, drywall repairs and new appliances. new vanity and toilet and powder room. all new flooring. all in (e) rooms.Details
unit #20, 2nd floor: - kitchen & bathroom remodel including new cabinets, drywall repairs and new appliances. new vanity and toilet and powder room. all new flooring. all in (e) rooms. | $25,000 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 36 Gladys St | kitchen & bathroom demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical updateDetails
kitchen & bathroom demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical update | $25,000 |
| Feb 9, 2016 | Completed final sign-off Jun 2016 | 538 39th Av | kitchen demo and remodel including new cabinets, drywall repairs and new appliances, plumbing and electrical updates. no alteration of wall, window and door.Details
kitchen demo and remodel including new cabinets, drywall repairs and new appliances, plumbing and electrical updates. no alteration of wall, window and door. | $18,000 |
| Jan 21, 2016 | Completed final sign-off May 2016 | 240 Lombard St | #227 - kitchen demo & remodel including new cabinets, drywall repairs, & new appliances. plumbing & electrical update.Details
#227 - kitchen demo & remodel including new cabinets, drywall repairs, & new appliances. plumbing & electrical update. | $25,000 |
| Jan 14, 2016 | Completed final sign-off Mar 2016 | 235 Cresta Vista Dr | kitchen demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical update.Details
kitchen demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical update. | $20,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 1420 Page St | kitchen demo & remodel including new cabinets, drywall repairs, and new appliances, plumbing & electrical updateDetails
kitchen demo & remodel including new cabinets, drywall repairs, and new appliances, plumbing & electrical update | $22,000 |
| Dec 7, 2015 | Completed final sign-off Apr 2016 | 89 Iris Av | no wall modification or alteration. kitchen demo and remodel including new cabinets, drywall repairs and new appliances. plumbing and electrical update. bathroom demo and remodel including new vanity, shower and fixtures. plumbing and electrical update.Details
no wall modification or alteration. kitchen demo and remodel including new cabinets, drywall repairs and new appliances. plumbing and electrical update. bathroom demo and remodel including new vanity, shower and fixtures. plumbing and electrical update. | $45,000 |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 244 Myrtle St | kitchen demo and remodel, including new cabinets, drywall repairs and new applainces, plumbing and electical updatem including new breaker panel. no structural work, no change to walls, doors or windows.Details
kitchen demo and remodel, including new cabinets, drywall repairs and new applainces, plumbing and electical updatem including new breaker panel. no structural work, no change to walls, doors or windows. | $20,000 |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 156 17th Av | window replacement in kitchen and replacement of non-bearing wall in garage and repair of floor framing in garage. windows not visible from street.Details
window replacement in kitchen and replacement of non-bearing wall in garage and repair of floor framing in garage. windows not visible from street. | $5,000 |
| Nov 9, 2015 | Completed final sign-off Sep 2016 | 232 Olmstead St | 1)add new master bedroom and bath on 1st fl. 2)remove extg wall on 2nd fl to open up kitchen to living room. 3)remodel kitchen. 4)remodel bath on 2nd floor.Details
1)add new master bedroom and bath on 1st fl. 2)remove extg wall on 2nd fl to open up kitchen to living room. 3)remodel kitchen. 4)remodel bath on 2nd floor. | $150,000 |
| Oct 15, 2015 | Completed final sign-off Sep 2016 | 232 Olmstead St | full kitchen remodel to include cabinets, flooring, drywall and appliances. full bathroom remodel to include cabinets, flooring, tile and fixtures. no structural changes. all lighting to comply with title 24. no walls moved, removed, added or infilled. all (e) layouts to remain unchangedDetails
full kitchen remodel to include cabinets, flooring, drywall and appliances. full bathroom remodel to include cabinets, flooring, tile and fixtures. no structural changes. all lighting to comply with title 24. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged | $45,000 |
| Sep 25, 2015 | Completed final sign-off Jan 2016 | 2169 Folsom St | full kitchen remodel to include cabinets, flooring, drywall, & appliances. no structural changes. all lighting to comply with title 24.Details
full kitchen remodel to include cabinets, flooring, drywall, & appliances. no structural changes. all lighting to comply with title 24. | $25,000 |
| Sep 25, 2015 | Never finaled issued Sep 2015, no final | 601 Van Ness Av | unit #55: full kitchen remodel to include cabinetes, flooring, drywall, & appliances. no structural changes. all lighting to comply with title 24. compliance with maher ordinance no 155-13.Details
unit #55: full kitchen remodel to include cabinetes, flooring, drywall, & appliances. no structural changes. all lighting to comply with title 24. compliance with maher ordinance no 155-13. | $25,000 |
| Sep 24, 2015 | Completed final sign-off Aug 2016 | 4434 23rd St | 1) relocate stair from garage to 1st floor. 2)enlarge stair from 1st to 2nd floor. 3)remodel extg bedroom 2. 4)convert extg kitchen and bedroom 3 on 1st floor to new master bedroom.5) enlarge extg garage door opening.Details
1) relocate stair from garage to 1st floor. 2)enlarge stair from 1st to 2nd floor. 3)remodel extg bedroom 2. 4)convert extg kitchen and bedroom 3 on 1st floor to new master bedroom.5) enlarge extg garage door opening. | $50,000 |
| Sep 18, 2015 | Completed final sign-off Dec 2015 | 301 Folsom St | kitchen demo and remodel, to include new cabinets, drywall repair and new appliances. plumbing and electrical update. no changes to floor plan.Details
kitchen demo and remodel, to include new cabinets, drywall repair and new appliances. plumbing and electrical update. no changes to floor plan. | $22,000 |
| Sep 14, 2015 | Completed final sign-off Dec 2015 | 1520 Taylor St | kitchen remodel. new cabinets, drywall repair, new appliances. pluming/elec. no changes to floor planDetails
kitchen remodel. new cabinets, drywall repair, new appliances. pluming/elec. no changes to floor plan | $20,000 |
| Sep 3, 2015 | Completed final sign-off Jan 2016 | 662 Mangels Av | kitchen remodel to include new cabinets, appliances & drywall, plumbing & elec upgrade, footprint of kitchen unchanged.no walls removed,moved,added or inflled,all (e) layouts to remain unchanged.Details
kitchen remodel to include new cabinets, appliances & drywall, plumbing & elec upgrade, footprint of kitchen unchanged.no walls removed,moved,added or inflled,all (e) layouts to remain unchanged. | $25,000 |
| Aug 17, 2015 | Completed final sign-off Oct 2015 | 3560 California St | unit #4 kitchen remodel to include new cabinets, drywall, flooring. no structural work.Details
unit #4 kitchen remodel to include new cabinets, drywall, flooring. no structural work. | $21,000 |
| Jun 12, 2015 | Completed final sign-off Sep 2015 | 316 12th Av | kitchen remodel. replace cabinets, flooring, drywall. electrical upgrade. minor plumbing changes.Details
kitchen remodel. replace cabinets, flooring, drywall. electrical upgrade. minor plumbing changes. | $18,000 |
| Jun 2, 2015 | Completed final sign-off Apr 2016 | 440 Laidley St | revision appl. 2015.0506.5482 to provide plan to show change of layout. kitchen and dining room reconfiguration and master closet and bath reconfiguration.Details
revision appl. 2015.0506.5482 to provide plan to show change of layout. kitchen and dining room reconfiguration and master closet and bath reconfiguration. | $12,000 |
| May 29, 2015 | Completed final sign-off Oct 2015 | 4434 23rd St | kitchen remodel - electrical upgrade, plumbing update. new cabinets, appliances, drywall. no walls built new or moved. 10'x11'Details
kitchen remodel - electrical upgrade, plumbing update. new cabinets, appliances, drywall. no walls built new or moved. 10'x11' | $20,000 |
| May 15, 2015 | Completed final sign-off Aug 2015 | 357 Monticello St | full kitchen remodel, including cabinets, counter tops, electrical, plumbing, and appliances, and drywall. all work in kind.Details
full kitchen remodel, including cabinets, counter tops, electrical, plumbing, and appliances, and drywall. all work in kind. | $22,000 |
| May 6, 2015 | Completed final sign-off Apr 2016 | 440 Laidley St | 2 full bathroom remodel 70sf and full kitchen remodel 100sf including all interior doors, flooring, drywall repair. no structural alterations.Details
2 full bathroom remodel 70sf and full kitchen remodel 100sf including all interior doors, flooring, drywall repair. no structural alterations. | $40,000 |
| Apr 20, 2015 | Completed final sign-off Jun 2015 | 335 Noriega St | full kitchen remodel to include cabinets, flooring & appliances at 2nd story. no walls to be moved/no structural- finishes/fixtureDetails
full kitchen remodel to include cabinets, flooring & appliances at 2nd story. no walls to be moved/no structural- finishes/fixture | $20,000 |
| Feb 4, 2015 | Completed final sign-off Mar 2016 | 156 17th Av | bathroom and kitchen remodel to include new cabinets and flooring and drywall. replace sheetrock in garage ceiling with 5/8" type "x"Details
bathroom and kitchen remodel to include new cabinets and flooring and drywall. replace sheetrock in garage ceiling with 5/8" type "x" | $40,000 |
| Jan 8, 2015 | Completed final sign-off Mar 2015 | 4429 Kirkham St | kitchen remodel to include cabinetry. flooring & new washer/dryer hook ups. no walls moved removed or added. all layout to remain unchanged.Details
kitchen remodel to include cabinetry. flooring & new washer/dryer hook ups. no walls moved removed or added. all layout to remain unchanged. | $20,000 |
| Oct 23, 2014 | Completed final sign-off Jan 2015 | 1450 Post St | kitchen and bathroom remodel with new floors. no walls moved, removed or added. all fixtures and appliances locations and layouts to remain unchanged.Details
kitchen and bathroom remodel with new floors. no walls moved, removed or added. all fixtures and appliances locations and layouts to remain unchanged. | $20,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 1080 Chestnut St | unit 10b: replace kitchen cabinets, new floors & 6 interior doors. these doors specifically: closet, bathroom & bedroom replaced in-kind. no changes to windows, work for this unit only.Details
unit 10b: replace kitchen cabinets, new floors & 6 interior doors. these doors specifically: closet, bathroom & bedroom replaced in-kind. no changes to windows, work for this unit only. | $20,000 |
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 1550 Jackson St | #5: kitchen remodel to include flooring, drywall, cabinets, and appliances. no change on walls.Details
#5: kitchen remodel to include flooring, drywall, cabinets, and appliances. no change on walls. | $20,000 |
| Jul 31, 2014 | Expired or cancelled expired Sep 2021 | 1450 Post St | unit 404. merge this unit #404 to adjacent unit #402. (see separate permit application 2014-07-31-2657 for unit 402). remove existing kitchenette & non-struc. partitions & cut opening in non-structural partition to connect to adjacent unit. (residential care facility).Details
unit 404. merge this unit #404 to adjacent unit #402. (see separate permit application 2014-07-31-2657 for unit 402). remove existing kitchenette & non-struc. partitions & cut opening in non-structural partition to connect to adjacent unit. (residential care facility). | $6,000 |
| Feb 28, 2014 | Completed final sign-off May 2014 | 201 Harrison St | kitchen remodel. to replace floors.Details
kitchen remodel. to replace floors. | $20,000 |
| Dec 26, 2013 | Completed final sign-off Jul 2014 | 601 Van Ness Av | one kitchen remodel to include cabinets & countertopsDetails
one kitchen remodel to include cabinets & countertops | $20,000 |
| Dec 12, 2013 | Never finaled issued Mar 2014, no final | 17 Milton St | relocate kitchen to basement flr level. remove extg bathroom & construct nw bathroom at 1st fl. replace all windows & exterior doors. all wndw ot be clad wood units. insulate attic and all ext walls. construct 36" wide interior stair to lower level. remove extg furnace & wh/replace with nw equipmntDetails
relocate kitchen to basement flr level. remove extg bathroom & construct nw bathroom at 1st fl. replace all windows & exterior doors. all wndw ot be clad wood units. insulate attic and all ext walls. construct 36" wide interior stair to lower level. remove extg furnace & wh/replace with nw equipmnt | $80,000 |
| Dec 5, 2013 | Completed final sign-off Feb 2014 | 1450 Post St | kitchen remodelDetails
kitchen remodel | $15,000 |
| Dec 5, 2013 | Completed final sign-off Dec 2014 | 277 Rose St | kitchen remodelDetails
kitchen remodel | $15,000 |
| Oct 23, 2013 | Completed final sign-off Feb 2014 | 55 Page St | kitchen remodelDetails
kitchen remodel | $15,000 |
| Oct 23, 2013 | Completed final sign-off Mar 2014 | 1591 Jackson St | kitchen remodelDetails
kitchen remodel | $15,000 |
| Oct 21, 2013 | Completed final sign-off Jan 2014 | 1288 Mcallister St | kitchen remodel. no structural.Details
kitchen remodel. no structural. | $15,000 |
| Oct 21, 2013 | Completed final sign-off Jan 2014 | 1632 Vallejo St | kitchen remodel. no structuralDetails
kitchen remodel. no structural | $15,000 |
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 318 Staples Av | kitchen remodel only. no structural work.Details
kitchen remodel only. no structural work. | $16,000 |
| Jul 15, 2013 | Completed final sign-off Dec 2013 | 1001 Pine St | bathroom & kitchen remodel. no structural. replacing the fixtures and cabinets.Details
bathroom & kitchen remodel. no structural. replacing the fixtures and cabinets. | $15,000 |
| Jul 1, 2013 | Completed final sign-off Mar 2014 | 1330 22nd Av | enlarge kitchen by enclosing (e) lightwell & removing (e) stair, convert (e) breakfast room to new master bath, convert (e) toilet room to laundry room & move toilet to (e) hallway bath, remove unpermitted social room & remove illegal bathroom at first floor. revision to pa# 2013.0618.9781.Details
enlarge kitchen by enclosing (e) lightwell & removing (e) stair, convert (e) breakfast room to new master bath, convert (e) toilet room to laundry room & move toilet to (e) hallway bath, remove unpermitted social room & remove illegal bathroom at first floor. revision to pa# 2013.0618.9781. | $30,000 |
| Jun 18, 2013 | Completed final sign-off Mar 2014 | 1330 22nd Av | kitchen and bathroom remodel. no structural modification.Details
kitchen and bathroom remodel. no structural modification. | $5,000 |
| Jun 14, 2013 | Completed final sign-off Mar 2016 | 15 Mullen Av | comply with complaint #201308351-main floor-eliminate (e) bedroom, closet, bathroom. move kitchen & add half bathroom. basement-add 2 bedrooms, 2 bathrooms, interior stairs. remove exterior stairs from main level to gate with new windows & door.Details
comply with complaint #201308351-main floor-eliminate (e) bedroom, closet, bathroom. move kitchen & add half bathroom. basement-add 2 bedrooms, 2 bathrooms, interior stairs. remove exterior stairs from main level to gate with new windows & door. | $50,000 |
| May 22, 2013 | Never finaled issued May 2013, no final | 3620 19th St | add new island in kitchenDetails
add new island in kitchen | $1,500 |
| May 21, 2013 | Expired or cancelled expired Mar 2016 | 15 Mullen Av | remodel kitchen to include new cabinets & countertops, remodel bathroom to include new tile, shower & fixtures.Details
remodel kitchen to include new cabinets & countertops, remodel bathroom to include new tile, shower & fixtures. | $15,000 |
| Mar 20, 2013 | Completed final sign-off May 2013 | 1450 Post St | renovation of (e) kitchen w/ new cabinets & floors.Details
renovation of (e) kitchen w/ new cabinets & floors. | $9,239 |
| Feb 4, 2013 | Completed final sign-off Jun 2013 | 824 Ashbury St | kitchen remodel to include new cabinets counters and lighting.Details
kitchen remodel to include new cabinets counters and lighting. | $12,000 |
| Jan 28, 2013 | Completed final sign-off Jul 2013 | 148 Diamond St | kitchen remodel to include new flooring, cabinets and counter tops, no structural, no alteration of partition wall.Details
kitchen remodel to include new flooring, cabinets and counter tops, no structural, no alteration of partition wall. | $12,000 |
| Jan 28, 2013 | Completed final sign-off Nov 2013 | 1150 Folsom St | kitchen remodel to include new cabinets and floor only, no structural, no alteration of partition wall.Details
kitchen remodel to include new cabinets and floor only, no structural, no alteration of partition wall. | $12,000 |
| Jan 14, 2013 | Completed final sign-off May 2013 | 234 10th Av | kitchen remodel including new cabinets, counter tops and flooring (no structural) no new lights, no alteration of partion wallDetails
kitchen remodel including new cabinets, counter tops and flooring (no structural) no new lights, no alteration of partion wall | $12,000 |