Block 2627, lot 053
90 Saturn St
- City’s use
- Single Family Residential
- Built
- 1964
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 2,114 sq ft
- Zoning
- NA
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2020 | Completed final sign-off Aug 2023 | 90 Saturn St | Phase 2 Builders | remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space.Details
remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space. | $125,000 |
| Jan 16, 2008 | Never finaled issued Jan 2008, no final | 90 Saturn St | street space permit only.Details
street space permit only. | ||
| Nov 7, 2007 | Completed final sign-off Oct 2008 | 90 Saturn St | Cal - Bay Craftsmen Inc | revised cost for pa#200705020296 r-1 & revision to appplication adding siding replacement in existing lightwells & top floor south facing wall. siding replacement in kind.Details
revised cost for pa#200705020296 r-1 & revision to appplication adding siding replacement in existing lightwells & top floor south facing wall. siding replacement in kind. | $300,000 |
| Oct 16, 2007 | Completed final sign-off Oct 2008 | 90 Saturn St | Cal - Bay Craftsmen Inc | revision to appl. #200705020296. unit #90 - delete window at rear, relocate window at rear, change shear wall. unit #92 - replace (e) non conforming egress stair in (n) configuration.Details
revision to appl. #200705020296. unit #90 - delete window at rear, relocate window at rear, change shear wall. unit #92 - replace (e) non conforming egress stair in (n) configuration. | $10,000 |
| Aug 14, 2007 | Completed final sign-off Oct 2008 | 90 Saturn St | Cal - Bay Craftsmen Inc | revision to permit #2007-0502-0296-r1. rebuild existing rear/side foundations (approx 70ft) reduce rear opening from 10ft to 8ft.Details
revision to permit #2007-0502-0296-r1. rebuild existing rear/side foundations (approx 70ft) reduce rear opening from 10ft to 8ft. | $50,000 |
| May 2, 2007 | Completed final sign-off Oct 2008 | 90 Saturn St | #90: remodel kitchen, master bedroom and bath, convert storage to living space, 1st fl, add rear door and stair to yard. replace ext deck. #92: add laundry and upgrade electric. remove (e) ext. stair. repair leaking roof.Details
#90: remodel kitchen, master bedroom and bath, convert storage to living space, 1st fl, add rear door and stair to yard. replace ext deck. #92: add laundry and upgrade electric. remove (e) ext. stair. repair leaking roof. | $100,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.