Back to bathroom remodel contractors
Phase 2 Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Jul 2026
- Last 24 months
- 6 permits filed
190 permits since 2000: 165 completed, 3 in progress, 8 never finaled, 14 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
80 bathroom remodel permits: 68 completed, 3 in progress, 2 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Jul 2026 | 75 Zircon Pl | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $15,000 |
| Jan 5, 2026 | In progress issued Aug 2026 | 33 Robinhood Dr | full interior home renovation & addition of primary bedroom & ensuite bathroom include general interior finished, new flooring & wall coverings, kitchen remodel. new cabinets, countertops & appliances. remodel all bathrooms, new doors & windows, updated electrical & lighting systems,Details
full interior home renovation & addition of primary bedroom & ensuite bathroom include general interior finished, new flooring & wall coverings, kitchen remodel. new cabinets, countertops & appliances. remodel all bathrooms, new doors & windows, updated electrical & lighting systems, | $2,000,000 |
| Jan 8, 2025 | In progress issued Jan 2025 | 33 Robinhood Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $30,000 |
| Oct 31, 2024 | Expired or cancelled expired Dec 2025 | 1080 Chestnut St | unit 13b: apartment renovation- new kitchen and bathrooms.Details
unit 13b: apartment renovation- new kitchen and bathrooms. | $45,000 |
| Jan 10, 2024 | Completed final sign-off Feb 2025 | 2253 15th St | interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor.Details
interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor. | $50,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2024 | 993 Tennessee St | unit #6: remodel kitchen (fourth floor) in kind. primary bathroom (3rd floor) in kind. replace fixtures only (4th floor) bathroom in kind. no structural work.Details
unit #6: remodel kitchen (fourth floor) in kind. primary bathroom (3rd floor) in kind. replace fixtures only (4th floor) bathroom in kind. no structural work. | $150,000 |
| May 18, 2023 | Completed final sign-off Aug 2024 | 228 Liberty St | kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade.Details
kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade. | $77,859 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 75 Zircon Pl | remodel of 1st floor and 2nd floor guest bathrooms (2 total). existing plumbing locations, new finishes, new plumbing fixtures in same locations. non structural.Details
remodel of 1st floor and 2nd floor guest bathrooms (2 total). existing plumbing locations, new finishes, new plumbing fixtures in same locations. non structural. | $25,000 |
| May 27, 2022 | Completed final sign-off Mar 2023 | 357 Princeton St | remodel (e) kitchen. remodel (e) primary bathroom, add 2 new skylightsDetails
remodel (e) kitchen. remodel (e) primary bathroom, add 2 new skylights | $50,000 |
| May 25, 2022 | Completed final sign-off Aug 2023 | 1129 Tennessee St | covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work.Details
covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work. | $30,000 |
| Mar 11, 2022 | Completed final sign-off May 2023 | 217 Cumberland St | remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations.Details
remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations. | $120,000 |
| Feb 4, 2022 | Never finaled issued Feb 2022, no final | 75 Zircon Pl | remodel of master bathroom. new plumbing and electrical fixtures, new flooring and tile, new casework.Details
remodel of master bathroom. new plumbing and electrical fixtures, new flooring and tile, new casework. | $10,000 |
| Sep 2, 2021 | Completed final sign-off Aug 2022 | 75 Zircon Pl | remodel 1/f bath led lites & (1) laundry room. (e) plumbing locations, new applances & fixtures in-kind. replace exhaust fan. replace washer/dryer and reconnect (e) ventDetails
remodel 1/f bath led lites & (1) laundry room. (e) plumbing locations, new applances & fixtures in-kind. replace exhaust fan. replace washer/dryer and reconnect (e) vent | $20,000 |
| Aug 23, 2021 | Completed final sign-off Aug 2022 | 97 Hill St | remodel kitchen (10'x12')and master bathroom (8'x5'), in kind repair back stair case in kind, less than 50%. no change in unit #2-location or design. h.e. lighting and controlled per cec 150.0(k)Details
remodel kitchen (10'x12')and master bathroom (8'x5'), in kind repair back stair case in kind, less than 50%. no change in unit #2-location or design. h.e. lighting and controlled per cec 150.0(k) | $20,000 |
| Aug 23, 2021 | Completed final sign-off Aug 2022 | 99 Hill St | remodel kitchen (10'x12') and master bathroom (8'x5')in kind. remodel powder room (5'x5')in kind. h.e. lighting and controlled per cec 150.0(k)Details
remodel kitchen (10'x12') and master bathroom (8'x5')in kind. remodel powder room (5'x5')in kind. h.e. lighting and controlled per cec 150.0(k) | $20,000 |
| May 5, 2021 | Completed final sign-off Sep 2022 | 377 Capp St | remodel kitchen (1), master bath (1), 1/2 bath (1) & laundry (1) to include new plumbing and electrical fixtures. redo flooring in both units. upgrade hvac & new furnace.Details
remodel kitchen (1), master bath (1), 1/2 bath (1) & laundry (1) to include new plumbing and electrical fixtures. redo flooring in both units. upgrade hvac & new furnace. | $25,000 |
| Mar 22, 2021 | Completed final sign-off Feb 2022 | 1945 Washington St | unit 202 - repair & replace in-kind - flooring, drywall, lighting fixtures, plumbing fixtures cabinets & appliances in unit damaged by fire sprinklers. no structural work - 2 baths, 1 kitchen, 1 laundry. to comply w/ nov 202045331Details
unit 202 - repair & replace in-kind - flooring, drywall, lighting fixtures, plumbing fixtures cabinets & appliances in unit damaged by fire sprinklers. no structural work - 2 baths, 1 kitchen, 1 laundry. to comply w/ nov 202045331 | $80,000 |
| Feb 11, 2021 | Completed final sign-off Dec 2021 | 1945 Washington St | apt 502: repair & replace in kind. flooring, drywall, lighting fixtures, electrical, plumbing fixtures, cabinets, appliances in unit damaged by smoke, water. no structural changes - 2 bath, 1 kitchen, 1 laundry, living/dining, 2 bedroom.Details
apt 502: repair & replace in kind. flooring, drywall, lighting fixtures, electrical, plumbing fixtures, cabinets, appliances in unit damaged by smoke, water. no structural changes - 2 bath, 1 kitchen, 1 laundry, living/dining, 2 bedroom. | $60,000 |
| Feb 1, 2021 | Completed final sign-off Aug 2021 | 1945 Washington St | #203: repair & replace in kind flooring, drywall, lighting & electrical, plumbing fixtures, cabinets, appliances in unit damaged by water/fire. no sturctural changes - 2 baths, 1 itchen , 1 laundry.Details
#203: repair & replace in kind flooring, drywall, lighting & electrical, plumbing fixtures, cabinets, appliances in unit damaged by water/fire. no sturctural changes - 2 baths, 1 itchen , 1 laundry. | $40,000 |
| Jan 14, 2021 | Completed final sign-off Nov 2021 | 1080 Chestnut St | unit 5b: remodel of guest bath & master bath. new plumbing fixtures in existing locations.Details
unit 5b: remodel of guest bath & master bath. new plumbing fixtures in existing locations. | $20,000 |
| Dec 10, 2020 | Completed final sign-off Aug 2023 | 2416 15th St | horizontal addition of adu per state law to existing r3 3-story single family residence first floor: expand existing conditioned area at rear yard with 12'-foot permitted obstruction per planning code section 136 with new sleeping, eating, living areas and bathroom at grade.Details
horizontal addition of adu per state law to existing r3 3-story single family residence first floor: expand existing conditioned area at rear yard with 12'-foot permitted obstruction per planning code section 136 with new sleeping, eating, living areas and bathroom at grade. | $203,750 |
| Dec 3, 2020 | Completed final sign-off Aug 2023 | 90 Saturn St | remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space.Details
remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space. | $125,000 |
| Nov 3, 2020 | Completed final sign-off Mar 2021 | 653 Connecticut St | bathroom remodel, replace tub, tile, vanity in kind.Details
bathroom remodel, replace tub, tile, vanity in kind. | $10,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2021 | 1632 Vallejo St | unit 2: finsh & fixtures upgrasdes to (e) 2 bathrooms. new built-in closet in mster bedroom, replacement of 7 interior doors & guardrail updates.Details
unit 2: finsh & fixtures upgrasdes to (e) 2 bathrooms. new built-in closet in mster bedroom, replacement of 7 interior doors & guardrail updates. | $82,000 |
| Sep 18, 2020 | Completed final sign-off Jun 2021 | 1744 Sanchez St | revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layoutDetails
revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layout | |
| Jul 21, 2020 | Completed final sign-off Oct 2020 | 67 Rudden Av | 1 bathroom remodel, 120 sq ft. new plumbing fixtures - tub, toilet, vanity, all at same locationsDetails
1 bathroom remodel, 120 sq ft. new plumbing fixtures - tub, toilet, vanity, all at same locations | $25,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 2167 Grove St | remodel 2 bathrooms in-kind, new fixtures. no walls modified or filled and layout remains unchanged, new laundry location.Details
remodel 2 bathrooms in-kind, new fixtures. no walls modified or filled and layout remains unchanged, new laundry location. | $30,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 3958 18th St | interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior workDetails
interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior work | $75,000 |
| Aug 14, 2019 | Completed final sign-off Jun 2021 | 1744 Sanchez St | extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work.Details
extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work. | $225,000 |
| Apr 18, 2019 | Completed final sign-off Jun 2025 | 1 Daniel Burnham Ct | on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maherDetails
on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maher | $35,000 |
| Mar 26, 2019 | Expired or cancelled expired Jan 2023 | 1032 Broadway | interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maherDetails
interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maher | $100,000 |
| Dec 4, 2018 | Completed final sign-off Jun 2019 | 585 Rockdale Dr | interior remodel of (e) kitchen and bathroom at 2nd flr incl new fixtures and lighting, kitchen cabinetry, applinaces, flooring. no structural changes proposedDetails
interior remodel of (e) kitchen and bathroom at 2nd flr incl new fixtures and lighting, kitchen cabinetry, applinaces, flooring. no structural changes proposed | $36,000 |
| Oct 25, 2018 | Completed final sign-off Apr 2019 | 301 Gough St | remodel master & guest bathroom. including new plumbing fixtures, tilet, tub and shower in same location.Details
remodel master & guest bathroom. including new plumbing fixtures, tilet, tub and shower in same location. | $25,000 |
| Sep 19, 2018 | Expired or cancelled cancelled Jan 2026 | 61 Hartford St | remodel ground flr - living area including kitchen and bathroom, new exterior door and remodel exterior deckDetails
remodel ground flr - living area including kitchen and bathroom, new exterior door and remodel exterior deck | $20,000 |
| Jun 6, 2018 | Completed final sign-off Mar 2019 | 61 Hartford St | full master bathroom and kitchen renovation to include new cabinetry, appliances, flooring and tile. no structural work proposed. replace in-kind only at basement level/lower unitDetails
full master bathroom and kitchen renovation to include new cabinetry, appliances, flooring and tile. no structural work proposed. replace in-kind only at basement level/lower unit | $20,000 |
| Apr 16, 2018 | Completed final sign-off Dec 2018 | 175 Haight St | interior remodel of existing kitchen & bathroom, proposes additon of (1) full bathroom, all new appliances in kitchen, proposes upgrading lighting & receptacles in area of work, no structural changesDetails
interior remodel of existing kitchen & bathroom, proposes additon of (1) full bathroom, all new appliances in kitchen, proposes upgrading lighting & receptacles in area of work, no structural changes | $82,000 |
| Oct 31, 2017 | Completed final sign-off Jun 2018 | 47 Mars St | renovate master bathroom to include new fixtures, tub & tile.Details
renovate master bathroom to include new fixtures, tub & tile. | $20,000 |
| Aug 15, 2017 | Completed final sign-off Jun 2018 | 209 Montcalm St | kitchen remodelto include cabinets and flooring. remodel master bath, guest bath, and powder room. no change in structural or floor plan. no wall modification. no structural work.Details
kitchen remodelto include cabinets and flooring. remodel master bath, guest bath, and powder room. no change in structural or floor plan. no wall modification. no structural work. | $60,000 |
| Aug 15, 2017 | Completed final sign-off Jan 2018 | 2169 Folsom St | 1st floor: bathroom remodel. no wall modification. no structural workDetails
1st floor: bathroom remodel. no wall modification. no structural work | $20,000 |
| Jul 7, 2017 | Expired or cancelled expired May 2021 | 629 Alvarado St | 3/f: master bathroom remodel & guest bathroom on g/f. no structural alts, no electrical to be performed. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
3/f: master bathroom remodel & guest bathroom on g/f. no structural alts, no electrical to be performed. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $20,000 |
| May 4, 2017 | Completed final sign-off Apr 2018 | 1080 Chestnut St | unit 4b: full remodel of master bathroom, powder room and kitchen , includes new floor throughout,. update plumbing and electrical. no structural work. same layout.Details
unit 4b: full remodel of master bathroom, powder room and kitchen , includes new floor throughout,. update plumbing and electrical. no structural work. same layout. | $20,000 |
| May 1, 2017 | Completed final sign-off Oct 2017 | 39 Brewster St | kitchen & bathroom remodel; repair (e) interior stair case less than 50% in-kind; no structural alterations.Details
kitchen & bathroom remodel; repair (e) interior stair case less than 50% in-kind; no structural alterations. | $20,000 |
| Mar 10, 2017 | Completed final sign-off Oct 2017 | 1747 43rd Av | kitchen remodel including addition of a door leading from kitchen to a new deck less than 30" high in rear yard. addition of a bathroom with in the extg laundry room area. install hydronic radiant floor heating.Details
kitchen remodel including addition of a door leading from kitchen to a new deck less than 30" high in rear yard. addition of a bathroom with in the extg laundry room area. install hydronic radiant floor heating. | $18,000 |
| Feb 24, 2017 | Completed final sign-off Oct 2017 | 4110 20th St | demo & replace kitchen counters, cabinets & fixtures. new 1/2 bath on 1st flr. new finished floorDetails
demo & replace kitchen counters, cabinets & fixtures. new 1/2 bath on 1st flr. new finished floor | $20,000 |
| Dec 22, 2016 | Completed final sign-off Mar 2017 | 1 Daniel Burnham Ct | #614 - bathroom remodel to include new fixtures, tile floor and walls; no new elctricalDetails
#614 - bathroom remodel to include new fixtures, tile floor and walls; no new elctrical | $20,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2018 | 166 Ewing Tr | insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new windowDetails
insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new window | $100,000 |
| Oct 27, 2016 | Completed final sign-off Feb 2017 | 2049 Oak St | #1 - remodel one bathroom to include new tile, shower vanity & toilet; add pocket door; add new lighting kitchen, living room & hall. add new counter & back splash in kitchen.Details
#1 - remodel one bathroom to include new tile, shower vanity & toilet; add pocket door; add new lighting kitchen, living room & hall. add new counter & back splash in kitchen. | $20,000 |
| Aug 5, 2016 | Completed final sign-off Nov 2016 | 130 Landers St | ful master bath (1st floor) & powder room ( 2nd room ) renovation to include (n) fixtures, shower &tile, plumbing and electrical update in unit hDetails
ful master bath (1st floor) & powder room ( 2nd room ) renovation to include (n) fixtures, shower &tile, plumbing and electrical update in unit h | $30,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 2169 Folsom St | 3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher naDetails
3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na | $400,000 |
| May 19, 2016 | Completed final sign-off Aug 2016 | 1755 Filbert St | full bathroom renovation to include new fixts, shower & tile. plumbing & electrical update. new exhaust fan connecting to (e) duct. min 1 light in bath to be high efficacy.Details
full bathroom renovation to include new fixts, shower & tile. plumbing & electrical update. new exhaust fan connecting to (e) duct. min 1 light in bath to be high efficacy. | $20,000 |
| Apr 20, 2016 | Expired or cancelled cancelled Jan 2026 | 4641 18th St | convert 1st floor storage to livingspace for unit #4641 18th street. including bath and infill lightwell at 1st floor only. install exterior door and 2 windows(not visible to street). new foundation and slab on grade at 1st floor. install new patio slab.Details
convert 1st floor storage to livingspace for unit #4641 18th street. including bath and infill lightwell at 1st floor only. install exterior door and 2 windows(not visible to street). new foundation and slab on grade at 1st floor. install new patio slab. | $150,000 |
| Apr 13, 2016 | Completed final sign-off Aug 2016 | 4434 23rd St | full bathroom renovation to include new fixtures, shower and tiles. plumbing and electrical update. in-kind. no walls to be removed or altered.Details
full bathroom renovation to include new fixtures, shower and tiles. plumbing and electrical update. in-kind. no walls to be removed or altered. | $25,000 |
| Mar 30, 2016 | Completed final sign-off Dec 2016 | 300 Berry St | #558 - reface kitchen cabinets, replace railing along stairs with glass railing, add vanity to downstairs bathroom, full renovation of master bathroom on 2nd floor to include new tile, fixtures & shower. n/a maher ordinanceDetails
#558 - reface kitchen cabinets, replace railing along stairs with glass railing, add vanity to downstairs bathroom, full renovation of master bathroom on 2nd floor to include new tile, fixtures & shower. n/a maher ordinance | $50,000 |
| Feb 29, 2016 | Completed final sign-off Aug 2016 | 1755 Filbert St | unit #20, 2nd floor: - kitchen & bathroom remodel including new cabinets, drywall repairs and new appliances. new vanity and toilet and powder room. all new flooring. all in (e) rooms.Details
unit #20, 2nd floor: - kitchen & bathroom remodel including new cabinets, drywall repairs and new appliances. new vanity and toilet and powder room. all new flooring. all in (e) rooms. | $25,000 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 36 Gladys St | kitchen & bathroom demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical updateDetails
kitchen & bathroom demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical update | $25,000 |
| Dec 7, 2015 | Completed final sign-off Apr 2016 | 89 Iris Av | no wall modification or alteration. kitchen demo and remodel including new cabinets, drywall repairs and new appliances. plumbing and electrical update. bathroom demo and remodel including new vanity, shower and fixtures. plumbing and electrical update.Details
no wall modification or alteration. kitchen demo and remodel including new cabinets, drywall repairs and new appliances. plumbing and electrical update. bathroom demo and remodel including new vanity, shower and fixtures. plumbing and electrical update. | $45,000 |
| Nov 12, 2015 | Completed final sign-off Mar 2016 | 1 Daniel Burnham Ct | bathroom repair to include new drywall, tile, shower pan, plumbing fixtures, toilet, and vanity in master bath. drywall, tile repair, and new fixtures in guest bath. drywall repair for flood damage outside unit as needed in bedroom, hallway and bathrooms. approx. 200 sq.ft. no change to wallsDetails
bathroom repair to include new drywall, tile, shower pan, plumbing fixtures, toilet, and vanity in master bath. drywall, tile repair, and new fixtures in guest bath. drywall repair for flood damage outside unit as needed in bedroom, hallway and bathrooms. approx. 200 sq.ft. no change to walls | $10,000 |
| Nov 9, 2015 | Completed final sign-off Sep 2016 | 232 Olmstead St | 1)add new master bedroom and bath on 1st fl. 2)remove extg wall on 2nd fl to open up kitchen to living room. 3)remodel kitchen. 4)remodel bath on 2nd floor.Details
1)add new master bedroom and bath on 1st fl. 2)remove extg wall on 2nd fl to open up kitchen to living room. 3)remodel kitchen. 4)remodel bath on 2nd floor. | $150,000 |
| Oct 15, 2015 | Completed final sign-off Sep 2016 | 232 Olmstead St | full kitchen remodel to include cabinets, flooring, drywall and appliances. full bathroom remodel to include cabinets, flooring, tile and fixtures. no structural changes. all lighting to comply with title 24. no walls moved, removed, added or infilled. all (e) layouts to remain unchangedDetails
full kitchen remodel to include cabinets, flooring, drywall and appliances. full bathroom remodel to include cabinets, flooring, tile and fixtures. no structural changes. all lighting to comply with title 24. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged | $45,000 |
| Aug 5, 2015 | Completed final sign-off Aug 2016 | 4434 23rd St | garage framing repairs to include replacement of deteriorated sill plates and wall studs, add new r19 ceiling insulation and drywall. remodel (e) first floor bathroom, replace exhaust fan. new lights shall be led.Details
garage framing repairs to include replacement of deteriorated sill plates and wall studs, add new r19 ceiling insulation and drywall. remodel (e) first floor bathroom, replace exhaust fan. new lights shall be led. | $20,000 |
| Jun 2, 2015 | Completed final sign-off Apr 2016 | 440 Laidley St | revision appl. 2015.0506.5482 to provide plan to show change of layout. kitchen and dining room reconfiguration and master closet and bath reconfiguration.Details
revision appl. 2015.0506.5482 to provide plan to show change of layout. kitchen and dining room reconfiguration and master closet and bath reconfiguration. | $12,000 |
| May 6, 2015 | Completed final sign-off Apr 2016 | 440 Laidley St | 2 full bathroom remodel 70sf and full kitchen remodel 100sf including all interior doors, flooring, drywall repair. no structural alterations.Details
2 full bathroom remodel 70sf and full kitchen remodel 100sf including all interior doors, flooring, drywall repair. no structural alterations. | $40,000 |
| Feb 4, 2015 | Completed final sign-off Mar 2016 | 156 17th Av | bathroom and kitchen remodel to include new cabinets and flooring and drywall. replace sheetrock in garage ceiling with 5/8" type "x"Details
bathroom and kitchen remodel to include new cabinets and flooring and drywall. replace sheetrock in garage ceiling with 5/8" type "x" | $40,000 |
| Oct 23, 2014 | Completed final sign-off Jan 2015 | 1450 Post St | kitchen and bathroom remodel with new floors. no walls moved, removed or added. all fixtures and appliances locations and layouts to remain unchanged.Details
kitchen and bathroom remodel with new floors. no walls moved, removed or added. all fixtures and appliances locations and layouts to remain unchanged. | $20,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 1080 Chestnut St | unit 10b: replace kitchen cabinets, new floors & 6 interior doors. these doors specifically: closet, bathroom & bedroom replaced in-kind. no changes to windows, work for this unit only.Details
unit 10b: replace kitchen cabinets, new floors & 6 interior doors. these doors specifically: closet, bathroom & bedroom replaced in-kind. no changes to windows, work for this unit only. | $20,000 |
| Dec 30, 2013 | Completed final sign-off Nov 2014 | 960 Wisconsin St | addition of (n) bathroom with (e) closet off hallway on 2nd floor. convert study to media center.Details
addition of (n) bathroom with (e) closet off hallway on 2nd floor. convert study to media center. | $15,000 |
| Dec 12, 2013 | Never finaled issued Mar 2014, no final | 17 Milton St | relocate kitchen to basement flr level. remove extg bathroom & construct nw bathroom at 1st fl. replace all windows & exterior doors. all wndw ot be clad wood units. insulate attic and all ext walls. construct 36" wide interior stair to lower level. remove extg furnace & wh/replace with nw equipmntDetails
relocate kitchen to basement flr level. remove extg bathroom & construct nw bathroom at 1st fl. replace all windows & exterior doors. all wndw ot be clad wood units. insulate attic and all ext walls. construct 36" wide interior stair to lower level. remove extg furnace & wh/replace with nw equipmnt | $80,000 |
| Oct 4, 2013 | Completed final sign-off Jan 2014 | 1288 Mcallister St | bathroom remodelDetails
bathroom remodel | $15,000 |
| Jul 22, 2013 | Expired or cancelled expired Mar 2016 | 15 Mullen Av | revision to pa# 2013-0614-9539-comply with complaint #201312251-replacing property line window at north side, revised window by half bathroom on main fl & removing deletion of (e) window to keep 9e) window by dining room. max u factor .40Details
revision to pa# 2013-0614-9539-comply with complaint #201312251-replacing property line window at north side, revised window by half bathroom on main fl & removing deletion of (e) window to keep 9e) window by dining room. max u factor .40 | $1,000 |
| Jul 15, 2013 | Completed final sign-off Dec 2013 | 1001 Pine St | bathroom & kitchen remodel. no structural. replacing the fixtures and cabinets.Details
bathroom & kitchen remodel. no structural. replacing the fixtures and cabinets. | $15,000 |
| Jul 8, 2013 | Completed final sign-off Dec 2013 | 3340 21st St | 2 bathroom renovations. no structural.no change on walls.Details
2 bathroom renovations. no structural.no change on walls. | $14,000 |
| Jul 1, 2013 | Completed final sign-off Mar 2014 | 1330 22nd Av | enlarge kitchen by enclosing (e) lightwell & removing (e) stair, convert (e) breakfast room to new master bath, convert (e) toilet room to laundry room & move toilet to (e) hallway bath, remove unpermitted social room & remove illegal bathroom at first floor. revision to pa# 2013.0618.9781.Details
enlarge kitchen by enclosing (e) lightwell & removing (e) stair, convert (e) breakfast room to new master bath, convert (e) toilet room to laundry room & move toilet to (e) hallway bath, remove unpermitted social room & remove illegal bathroom at first floor. revision to pa# 2013.0618.9781. | $30,000 |
| Jun 18, 2013 | Completed final sign-off Mar 2014 | 1330 22nd Av | kitchen and bathroom remodel. no structural modification.Details
kitchen and bathroom remodel. no structural modification. | $5,000 |
| Jun 14, 2013 | Completed final sign-off Mar 2016 | 15 Mullen Av | comply with complaint #201308351-main floor-eliminate (e) bedroom, closet, bathroom. move kitchen & add half bathroom. basement-add 2 bedrooms, 2 bathrooms, interior stairs. remove exterior stairs from main level to gate with new windows & door.Details
comply with complaint #201308351-main floor-eliminate (e) bedroom, closet, bathroom. move kitchen & add half bathroom. basement-add 2 bedrooms, 2 bathrooms, interior stairs. remove exterior stairs from main level to gate with new windows & door. | $50,000 |
| May 21, 2013 | Expired or cancelled expired Mar 2016 | 15 Mullen Av | remodel kitchen to include new cabinets & countertops, remodel bathroom to include new tile, shower & fixtures.Details
remodel kitchen to include new cabinets & countertops, remodel bathroom to include new tile, shower & fixtures. | $15,000 |
| Mar 20, 2013 | Completed final sign-off Oct 2013 | 2117 Bush St | remodel bathroom to include new tile & fixtures.Details
remodel bathroom to include new tile & fixtures. | $9,037 |
| Jan 18, 2012 | Completed final sign-off May 2012 | 142 Russ St | remodel bathroom to include new tile, shower with pan and fixtures. kitchen remodel to include new electrical, plumbing and cabinets only. all (n) lighting must comply with cec150(k)10.Details
remodel bathroom to include new tile, shower with pan and fixtures. kitchen remodel to include new electrical, plumbing and cabinets only. all (n) lighting must comply with cec150(k)10. | $18,000 |
| Aug 18, 2011 | Completed final sign-off Oct 2011 | 480 Corbett Av | no change to exterior window, walls or doors. kitchen remodel to include new cabinets and counter tops - bathroom remodel to include new fixtures; shower pan and tile. lighting to comply with cec 150(k).Details
no change to exterior window, walls or doors. kitchen remodel to include new cabinets and counter tops - bathroom remodel to include new fixtures; shower pan and tile. lighting to comply with cec 150(k). | $19,000 |
| Apr 18, 2011 | Completed final sign-off Jul 2011 | 2060 Sutter St | remodel kitchen to include new cabinets & flooring, not adding or moving walls. remodel master bathroom & guest bathroomDetails
remodel kitchen to include new cabinets & flooring, not adding or moving walls. remodel master bathroom & guest bathroom | $10,000 |
| May 12, 2010 | Completed final sign-off Dec 2010 | 1924 Pine St | remove non-load bearing wall between living room & dining room, re-configure doorways between hall & living, hall & dining. flush frame beam in media room. re-configure entires to media & master bedrooms. renovate 2nd floor bathroom, install new lights & attic furnaceDetails
remove non-load bearing wall between living room & dining room, re-configure doorways between hall & living, hall & dining. flush frame beam in media room. re-configure entires to media & master bedrooms. renovate 2nd floor bathroom, install new lights & attic furnace | $32,500 |